If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0905030906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.791256,"lon":-114.415636,"icon":""}]} |
Location: 00/06-09-090-03W5/0 | |
Location Alias: 00/06-09-90-03 W5M | |
Location Alias 2: 00/06-09-090-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 090 | |
Meridian: 5 | |
Range: 03 | |
Section: 09 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: GULF AEC TROUT 6-9-90-3 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0155640 | |
License Date: 1993-01-13 | |
License Status: Abandoned | |
Spud Date: 1993-01-28 | |
Final Drill Date: 1993-02-09 | |
Well Total Depth: 1511.00 m | |
Surface Hole Latitude: 56.791256 | |
Surface Hole Longitude: -114.415636 |
Date | Event |
---|---|
1993-01-13 | Obtained License |
1993-01-31 | Surface Casing Operation Performed |
1993-02-01 | Lost Circulation Occurred |
1993-02-02 | Kick Occurred |
1993-02-03 | Kick Occurred |
1993-02-04 | Kick Occurred |
1993-02-04 | Well Log Performed |
1993-02-06 | Intermediate Casing Operation Performed |
1993-02-09 | Finished Drilling |
1993-02-09 | Well Log Performed |
1993-02-09 | Well Mode changed to Drilled and Cased |
1993-02-11 | Drill Stem Test Performed |
1993-02-13 | Production Casing Operation Performed |
1993-02-13 | Rig Released |
1993-02-28 | Well Log Performed |
1993-03-01 | Well Log Performed |
1993-03-02 | Perforation Treatment Performed - Jet Perforation |
1993-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-03-04 | Well Log Performed |
1993-03-05 | Perforation Treatment Performed - Cement Squeeze |
1993-03-06 | Well Log Performed |
1993-03-07 | Perforation Treatment Performed - Jet Perforation |
1993-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-03-15 | Well Began Production |
1993-03-15 | Well Fluid changed to Crude Oil |
1993-03-15 | Well Mode changed to Pumping |
1993-04-25 | Perforation Treatment Performed - Cement Squeeze |
1993-04-26 | Perforation Treatment Performed - Cement Squeeze |
1993-04-29 | Well Log Performed |
1993-04-30 | Perforation Treatment Performed - Jet Perforation |
1993-05-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-02-27 | Plug Back Performed |
1995-02-27 | Well Fluid changed to Crude Oil |
1995-02-27 | Well Log Performed |
1995-02-27 | Well Mode changed to Abandoned Zone |
1995-02-28 | Perforation Treatment Performed - Jet Perforation |
1997-12-17 | Well Log Performed |
2004-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-13 | Plug Back Performed |
2004-02-15 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-03-02 | Perforation | 1492.00 | 1493.00 | 13 |
1993-04-30 | Perforation | 1483.00 | 1484.00 | 13 |
1993-04-30 | Perforation | 1486.50 | 1487.50 | 13 |
1993-04-30 | Perforation | 1477.50 | 1480.50 | 13 |
1993-05-01 | Acid Treatment | 1477.50 | 1487.50 | 0 |
1995-02-27 | Packing Device Capped w/Cement | 1465.00 | 1473.00 | 0 |
1995-02-28 | Perforation | 618.00 | 622.00 | 20 |
1995-02-28 | Perforation | 624.50 | 628.00 | 20 |
2004-02-13 | Packing Device Capped w/Cement | 605.00 | 613.00 | 0 |
1993-03-03 | Acid Treatment | 1492.00 | 1493.00 | 0 |
1993-03-05 | Cement Squeeze | 1492.00 | 1493.00 | 0 |
1993-03-07 | Perforation | 1477.50 | 1480.50 | 13 |
1993-03-07 | Perforation | 1483.00 | 1484.00 | 13 |
1993-03-07 | Perforation | 1486.50 | 1487.50 | 13 |
1993-03-09 | Acid Treatment | 1477.50 | 1487.50 | 0 |
1993-04-25 | Cement Squeeze | 1483.00 | 1487.50 | 0 |
1993-04-26 | Cement Squeeze | 1477.50 | 1480.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 961 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1993-02-01 | Lost Circulation | 622.00 | 1034.00 |
1993-02-02 | Kick | 696.50 | 696.50 |
1993-02-02 | Kick | 937.00 | 937.00 |
1993-02-03 | Kick | 1015.00 | 1015.00 |
1993-02-04 | Kick | 1034.00 | 1034.00 |
For data sources see[6]