X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915050506000

Well Details

Well ID: 0915050506000
Loading map...
Location: 00/06-05-091-05W5/0
Location Alias: 00/06-05-91-05 W5M
Location Alias 2: 00/06-05-091-05 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 05
Section: 05
County/Municipality: Municipal District of Opportunity No. 17
Well Name: COPRC KIDNEY 6-5-91-5
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0157263
License Date: 1993-03-15
License Status: Abandoned
Spud Date: 1993-03-17
Final Drill Date: 1993-03-23
Well Total Depth: 1493.00 m
Surface Hole Latitude: 56.862703
Surface Hole Longitude: -114.770641

For data sources see[1][2]

Well History

Date Event
1993-03-15 Obtained License
1993-03-20 Surface Casing Operation Performed
1993-03-21 Lost Circulation Occurred
1993-03-23 Finished Drilling
1993-03-23 Well Mode changed to Drilled and Cased
1993-03-24 Production Casing Operation Performed
1993-03-24 Rig Released
1993-03-29 Well Log Performed
1993-03-30 Perforation Treatment Performed - Open-Hole Completion
1993-05-03 Well Began Production
1993-05-03 Well Fluid changed to Crude Oil
1993-05-03 Well Mode changed to Pumping
1995-02-06 Perforation Treatment Performed - Open-Hole Completion
1995-02-07 Well Log Performed
1995-02-10 Liner Casing Operation Performed
1995-02-11 Well Log Performed
1995-02-12 Perforation Treatment Performed - Jet Perforation
1995-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-08 Well Log Performed
1995-03-11 Perforation Treatment Performed - Cement Squeeze
1996-01-01 Well Fluid changed to Crude Oil
1996-01-01 Well Mode changed to Suspended
1997-08-22 Well Log Performed
1997-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-23 Plug Back Performed
1997-08-26 Well Log Performed
1997-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-27 Perforation Treatment Performed - Jet Perforation
1997-08-27 Perforation Treatment Performed - Remedial Casing
1997-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-28 Well Log Performed
1997-08-29 Well Log Performed
1997-09-11 Well Abandoned
1997-09-11 Well Fluid changed to Crude Oil
1997-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-30 Open Hole/Barefoot Completion 1440.00 1470.00 0
1997-08-27 Packing Device Capped w/Cement 1220.00 1220.00 0
1997-08-28 Packing Device Capped w/Cement 552.00 560.00 0
1995-02-06 Open Hole/Barefoot Completion 1440.00 1493.00 0
1995-02-12 Perforation 1462.00 1463.00 13
1995-02-12 Perforation 1471.50 1472.50 13
1995-02-13 Acid Treatment 1462.00 1472.50 0
1995-03-11 Cement Squeeze 1462.00 1463.00 0
1997-08-23 Packing Device Capped w/Cement 1448.00 1456.00 0
1997-08-27 Perforation 1230.00 1232.00 13
1997-08-27 Remedial Casing Cementing 1230.00 1232.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1310 0.0 0.0 0.0
1995 1117 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-03-21 Lost Circulation 635.00 1440.00

For data sources see[6]

References