X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0945030515003

Well Details

Well ID: 0945030515003
Loading map...
Location: 00/15-05-094-03W5/3
Location Alias: 00/15-05-94-03 W5M
Location Alias 2: 00/15-05-094-03 W5/03
Country: Canada
Province: Alberta
Township: 094
Meridian: 5
Range: 03
Section: 05
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PENGROWTH SENEX 15-5-94-3
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0179017
License Date: 1995-07-04
License Status: Abandoned
Spud Date: 2000-11-02
Final Drill Date: 2000-11-28
Well Total Depth: 1718.00 m
Surface Hole Latitude: 57.128510
Surface Hole Longitude: -114.443269

For data sources see[1][2]

Well History

Date Event
1995-07-04 Obtained License
2000-11-02 Direction Drilling Operation Performed - Horizontal
2000-11-20 Direction Drilling Operation Performed - Horizontal
2000-11-28 Finished Drilling
2000-11-29 Perforation Treatment Performed - Open-Hole Completion
2000-11-29 Rig Released
2000-11-29 Well Mode changed to Drilled and Cased
2000-12-16 Well Began Production
2000-12-16 Well Fluid changed to Crude Oil
2000-12-16 Well Mode changed to Pumping
2004-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-23 Plug Back Performed
2004-08-23 Well Abandoned
2004-08-23 Well Fluid changed to Crude Oil
2004-08-23 Well Mode changed to Abandoned
2010-02-12 Perforation Treatment Performed - Jet Perforation
2010-02-12 Perforation Treatment Performed - Remedial Casing
2010-02-13 Perforation Treatment Performed - Jet Perforation
2010-02-13 Perforation Treatment Performed - Remedial Casing
2010-02-14 Perforation Treatment Performed - Jet Perforation
2010-02-15 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-11-02 1185.50 Horizontal
2000-11-20 1230.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-29 Open Hole/Barefoot Completion 1185.50 1718.00 0
2004-08-23 Packing Device Capped w/Cement 1165.00 1173.00 0
2010-02-12 Perforation 447.00 448.00 20
2010-02-12 Remedial Casing Cementing 447.00 448.00 0
2010-02-13 Perforation 443.00 444.00 20
2010-02-13 Remedial Casing Cementing 443.00 444.00 0
2010-02-14 Perforation 436.00 437.00 20
2010-02-15 Remedial Casing Cementing 436.00 437.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 677 0.0 0.0 0.0
2001 294 0.0 0.0 0.0

For data sources see[6]

References