X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0955041912000

Well Details

Well ID: 0955041912000
Loading map...
Location: 00/12-19-095-04W5/0
Location Alias: 00/12-19-95-04 W5M
Location Alias 2: 00/12-19-095-04 W5/00
Country: Canada
Province: Alberta
Township: 095
Meridian: 5
Range: 04
Section: 19
County/Municipality: Municipal District of Opportunity No. 17
Well Name: PRED PANNY 12-19-95-4
Operator Name: Highwood Oil Company Ltd.
License Number: 0156330
License Date: 1993-02-05
License Status: Abandoned
Spud Date: 1993-02-18
Final Drill Date: 1993-03-02
Well Total Depth: 1192.00 m
Surface Hole Latitude: 57.259763
Surface Hole Longitude: -114.649139

For data sources see[1][2]

Well History

Date Event
1993-02-05 Obtained License
1993-02-19 Surface Casing Operation Performed
1993-02-21 Plug Back Performed
1993-02-23 Direction Drilling Operation Performed - Deviate
1993-02-27 Production Casing Operation Performed
1993-02-28 Well Log Performed
1993-03-02 Finished Drilling
1993-03-02 Perforation Treatment Performed - Open-Hole Completion
1993-03-02 Rig Released
1993-03-02 Well Mode changed to Drilled and Cased
1993-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-14 Well Began Production
1993-03-14 Well Fluid changed to Crude Oil
1993-03-14 Well Mode changed to Pumping
1993-03-15 Well Log Performed
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2003-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-19 Plug Back Performed
2003-02-19 Well Fluid changed to Crude Oil
2003-02-19 Well Mode changed to Abandoned Zone
2003-02-20 Well Abandoned
2003-02-20 Well Fluid changed to Crude Oil
2003-02-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-23 657.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-02 Open Hole/Barefoot Completion 1175.00 1192.00 0
1993-03-05 Acid Treatment 1175.00 1192.00 0
2003-02-19 Packing Device Capped w/Cement 1160.00 1170.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6462 0.0 0.0 0.0
1994 8600 0.0 0.0 0.0
1995 7138 0.0 0.0 0.0
1996 696 0.0 0.0 0.0

For data sources see[6]

References