X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0966052410000

Well Details

Well ID: 0966052410000
Loading map...
Location: 00/10-24-096-05W6/0
Location Alias: 00/10-24-96-05 W6M
Location Alias 2: 00/10-24-096-05 W6/00
Country: Canada
Province: Alberta
Township: 096
Meridian: 6
Range: 05
Section: 24
County/Municipality: Clear Hills County
Well Name: AMOCO CRANBERRY 10-24-96-5
Operator Name: BP Canada Energy Group ULC
License Number: 0083052
License Date: 1980-05-27
License Status: RecCertified
Spud Date: 1980-06-14
Final Drill Date: 1980-07-03
Well Total Depth: 2440.00 m
Surface Hole Latitude: 57.347330
Surface Hole Longitude: -118.659753

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-27 Obtained License
1980-07-03 Finished Drilling
1980-07-03 Well Mode changed to Drilled and Cased
1980-07-05 Drill Stem Test Performed
1980-07-08 Production Casing Operation Performed
1980-08-24 Perforation Treatment Performed - Jet Perforation
1980-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-05 Well Began Production
1981-04-05 Well Fluid changed to Gas
1981-04-05 Well Mode changed to Flowing
1987-08-11 Well Fluid changed to Gas
1987-08-11 Well Mode changed to Suspended
1996-03-26 Well Log Performed
1996-03-30 Perforation Treatment Performed - Jet Perforation
1996-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-04 Perforation Treatment Performed - Cement Plug
1996-04-04 Perforation Treatment Performed - Jet Perforation
1996-04-04 Perforation Treatment Performed - Remedial Casing
1996-04-04 Plug Back Performed
1996-04-07 Well Abandoned
1996-04-07 Well Fluid changed to Gas
1996-04-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-24 Perforation 2322.00 2327.00 7
1980-08-24 Perforation 2319.00 2322.00 7
1980-08-25 Acid Treatment 2319.00 2327.00 0
1996-03-30 Perforation 2305.50 2306.00 13
1996-04-01 Acid Treatment 2305.50 2306.00 0
1996-04-04 Packing Device Capped w/Cement 2287.00 2295.00 0
1996-04-04 Perforation 292.00 293.00 13
1996-04-04 Remedial Casing Cementing 292.00 293.00 0
1996-04-04 Cement Plug 280.00 293.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4328 0.0 0.0 0.0
1982 6405 0.0 0.0 0.0
1983 4586 0.0 0.0 0.0
1984 5386 0.0 0.0 0.0
1985 6926 0.0 0.0 0.0
1986 210 0.0 0.0 0.0

For data sources see[5]

References