If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096060111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.437786,"lon":-118.853379,"icon":""}]} |
Location: 00/11-01-109-06W6/0 | |
Location Alias: 00/11-01-09-06 W6M | |
Location Alias 2: 00/11-01-109-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 06 | |
Section: 01 | |
County/Municipality: Mackenzie County | |
Well Name: MOBIL RAIN 11-1-109-6 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0106626 | |
License Date: 1984-03-22 | |
License Status: Abandoned | |
Spud Date: 1984-03-25 | |
Final Drill Date: 1984-04-29 | |
Well Total Depth: 1810.00 m | |
Surface Hole Latitude: 58.437786 | |
Surface Hole Longitude: -118.853379 |
Date | Event |
---|---|
1984-03-22 | Obtained License |
1984-03-25 | Direction Drilling Operation Performed - 98 |
1984-03-25 | Lost Circulation Occurred |
1984-04-20 | Well Log Performed |
1984-04-21 | Well Log Performed |
1984-04-23 | Well Log Performed |
1984-04-27 | Lost Circulation Occurred |
1984-04-28 | Drill Stem Test Performed |
1984-04-29 | Finished Drilling |
1984-04-29 | Well Log Performed |
1984-04-29 | Well Mode changed to Drilled and Cased |
1984-04-30 | Well Log Performed |
1984-05-01 | Liner Casing Operation Performed |
1984-05-17 | Well Log Performed |
1984-05-18 | Perforation Treatment Performed - Jet Perforation |
1984-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-21 | Well Began Production |
1984-05-21 | Well Fluid changed to Crude Oil |
1984-05-21 | Well Mode changed to Flowing |
1984-05-30 | Perforation Treatment Performed - Jet Perforation |
1984-05-30 | Well Log Performed |
1984-05-31 | Perforation Treatment Performed - Fractured |
1986-04-01 | Well Fluid changed to Crude Oil |
1986-04-01 | Well Mode changed to Suspended |
1990-07-01 | Well Log Performed |
1990-07-02 | Perforation Treatment Performed - Cement Squeeze |
1990-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-07-04 | Perforation Treatment Performed - Jet Perforation |
1990-07-04 | Well Log Performed |
1990-07-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-07-11 | Well Fluid changed to Crude Oil |
1990-07-11 | Well Mode changed to Flowing |
1991-04-07 | Well Fluid changed to Crude Oil |
1991-04-07 | Well Mode changed to Pumping |
1998-05-06 | Perforation Treatment Performed - Cement Squeeze |
1998-05-08 | Perforation Treatment Performed - Jet Perforation |
1998-05-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-05-13 | Perforation Treatment Performed - Jet Perforation |
1998-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-05-16 | Perforation Treatment Performed - Jet Perforation |
1998-05-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-10-01 | Well Fluid changed to Crude Oil |
1998-10-01 | Well Mode changed to Suspended |
2000-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-12-01 | Plug Back Performed |
2000-12-01 | Well Fluid changed to Crude Oil |
2000-12-01 | Well Mode changed to Abandoned Zone |
2000-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-12-02 | Perforation Treatment Performed - Jet Perforation |
2000-12-02 | Perforation Treatment Performed - Remedial Casing |
2000-12-02 | Well Log Performed |
2000-12-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-12-03 | Perforation Treatment Performed - Remedial Casing |
2000-12-07 | Well Abandoned |
2000-12-07 | Well Fluid changed to Crude Oil |
2000-12-07 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1984-03-25 | 839.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-05-18 | Perforation | 1768.50 | 1771.00 | 13 |
1998-05-08 | Perforation | 1759.50 | 1762.50 | 13 |
1998-05-09 | Acid Treatment | 1759.50 | 1762.50 | 0 |
1998-05-13 | Perforation | 1751.50 | 1753.50 | 13 |
1998-05-14 | Acid Treatment | 1751.50 | 1753.50 | 0 |
1998-05-16 | Perforation | 1751.00 | 1753.50 | 13 |
1998-05-17 | Acid Treatment | 1751.00 | 1753.50 | 0 |
2000-12-01 | Packing Device Capped w/Cement | 1655.00 | 1741.50 | 0 |
2000-12-02 | Perforation | 598.00 | 599.00 | 20 |
2000-12-02 | Remedial Casing Cementing | 598.00 | 599.00 | 0 |
2000-12-02 | Packing Device Capped w/Cement | 554.50 | 593.50 | 0 |
1984-05-19 | Acid Treatment | 1768.50 | 1771.00 | 0 |
2000-12-02 | Perforation | 421.00 | 422.00 | 20 |
2000-12-03 | Remedial Casing Cementing | 421.00 | 422.00 | 0 |
2000-12-03 | Packing Device Capped w/Cement | 381.00 | 410.00 | 0 |
1984-05-30 | Perforation | 1759.00 | 1766.50 | 13 |
1984-05-31 | Fracture | 1759.00 | 1771.00 | 0 |
1990-07-02 | Cement Squeeze | 1759.00 | 1771.00 | 0 |
1990-07-04 | Perforation | 1751.50 | 1756.00 | 18 |
1990-07-04 | Acid Treatment | 1751.50 | 1756.00 | 0 |
1990-07-06 | Acid Treatment | 1751.50 | 1756.00 | 0 |
1998-05-06 | Cement Squeeze | 1751.50 | 1756.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1386 | 0.0 | 0.0 | 0.0 |
1985 | 130 | 0.0 | 0.0 | 0.0 |
1990 | 3755 | 0.0 | 0.0 | 0.0 |
1991 | 8470 | 0.0 | 0.0 | 0.0 |
1992 | 7310 | 0.0 | 0.0 | 0.0 |
1993 | 8299 | 0.0 | 0.0 | 0.0 |
1994 | 8316 | 0.0 | 0.0 | 0.0 |
1995 | 8541 | 0.0 | 0.0 | 0.0 |
1996 | 8477 | 0.0 | 0.0 | 0.0 |
1997 | 5868 | 0.0 | 0.0 | 0.0 |
1998 | 1768 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-03-25 | Lost Circulation | 82.00 | 94.00 |
1984-04-27 | Lost Circulation | 1768.00 | 1768.00 |
For data sources see[7]