1106071314000

Well Details

Well ID: 1106071314000
Loading map...
Location: 00/14-13-110-07W6/0
Location Alias: 00/14-13-10-07 W6M
Location Alias 2: 00/14-13-110-07 W6/00
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 07
Section: 13
County/Municipality: Mackenzie County
Well Name: HUSKY HZ RAINBOW 14-13-110-7
Operator Name: Husky Oil Operations Limited
License Number: 0444486
License Date: 2012-02-27
License Status: Suspension
Spud Date: 2012-03-16
Final Drill Date: 2012-04-04
Well Total Depth: 3740.00 m
Surface Hole Latitude: 58.570981
Surface Hole Longitude: -119.052586

For data sources see[1][2]

Well History

Date Event
2012-02-27 Obtained License
2012-03-18 Surface Casing Operation Performed
2012-03-22 Direction Drilling Operation Performed - Deviate
2012-03-25 Direction Drilling Operation Performed - Horizontal
2012-03-26 Lost Circulation Occurred
2012-03-27 Intermediate Casing Operation Performed
2012-04-04 Finished Drilling
2012-04-04 Well Mode changed to Drilled and Cased
2012-04-07 Well Log Performed
2012-04-09 Liner Casing Operation Performed
2012-04-09 Perforation Treatment Performed - Open-Hole Completion
2012-04-11 Rig Released
2012-04-11 Well Log Performed
2012-07-18 Well Log Performed
2012-07-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-16 Perforation Treatment Performed - Jet Perforation
2012-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-19 Well Log Performed
2012-12-16 Well Began Production
2012-12-16 Well Fluid changed to Crude Oil
2012-12-16 Well Mode changed to Pumping
2016-10-26 Well Fluid changed to Crude Oil
2016-10-26 Well Mode changed to Suspended
2019-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-01 Perforation Treatment Performed - Jet Perforation
2019-03-01 Well Log Performed
2019-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-02 Perforation Treatment Performed - Jet Perforation
2019-03-02 Perforation Treatment Performed - Remedial Casing
2019-03-02 Well Log Performed
2019-03-03 Perforation Treatment Performed - Remedial Casing
2019-03-11 Perforation Treatment Performed - Jet Perforation
2019-03-11 Well Log Performed
2019-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-12 Perforation Treatment Performed - Remedial Casing
2019-03-12 Plug Back Performed
2019-03-12 Well Fluid changed to Crude Oil
2019-03-12 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-22 1104.80 Deviate (5 - 79 degrees)
2012-03-25 1721.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-09 Open Hole/Barefoot Completion 3735.00 3740.00 0
2012-08-16 Perforation 2197.00 2200.00 20
2012-08-16 Multi-Stage Fracture 2220.70 2220.80 0
2012-08-16 Multi-Stage Fracture 2092.70 2092.80 0
2012-08-16 Multi-Stage Fracture 1974.90 1975.00 0
2012-08-16 Multi-Stage Fracture 1846.30 1846.40 0
2019-02-27 Packing Device Capped w/Cement 1565.60 1590.00 0
2019-03-01 Packing Device Capped w/Cement 1481.50 1500.00 0
2019-03-01 Perforation 801.90 804.90 20
2019-03-02 Remedial Casing Cementing 801.90 804.90 0
2019-03-02 Packing Device Capped w/Cement 786.00 796.50 0
2012-07-30 Multi-Stage Fracture 3712.90 3713.00 0
2019-03-02 Perforation 607.90 610.90 20
2019-03-03 Remedial Casing Cementing 607.90 610.90 0
2019-03-11 Perforation 476.20 479.20 20
2019-03-12 Remedial Casing Cementing 476.20 479.20 0
2019-03-12 Packing Device Capped w/Cement 461.00 470.50 0
2012-08-01 Multi-Stage Fracture 3236.30 3236.40 0
2012-08-03 Multi-Stage Fracture 3102.80 3102.90 0
2012-08-08 Multi-Stage Fracture 2983.90 2984.00 0
2012-08-09 Multi-Stage Fracture 2851.50 2851.60 0
2012-08-09 Multi-Stage Fracture 2717.90 2718.00 0
2012-08-09 Multi-Stage Fracture 2615.50 2615.60 0
2012-08-10 Multi-Stage Fracture 2497.90 2498.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 44 0.0 0.0 0.0
2013 7468 0.0 0.0 0.0
2014 4176 0.0 0.0 0.0
2015 5477 0.0 0.0 0.0
2016 1391 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-26 Lost Circulation 1769.00 1769.00
2012-09-29 No Incident Encountered 0.00 0.00
2019-03-12 No Incident Encountered 0.00 0.00

For data sources see[7]