If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1106072715000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.587385,"lon":-119.06692,"icon":""}]} |
| Location: 00/15-27-110-07W6/0 | |
| Location Alias: 00/15-27-10-07 W6M | |
| Location Alias 2: 00/15-27-110-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 110 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 27 | |
| County/Municipality: Mackenzie County | |
| Well Name: HUSKY RAINBOW 15-27-110-7 | |
| Operator Name: Husky Oil Operations Limited | |
| License Number: 0103529 | |
| License Date: 1983-10-12 | |
| License Status: Suspension | |
| Spud Date: 1983-10-26 | |
| Final Drill Date: 1983-11-26 | |
| Well Total Depth: 1810.00 m | |
| Surface Hole Latitude: 58.587385 | |
| Surface Hole Longitude: -119.066920 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-10-12 | Obtained License |
| 1983-10-26 | Direction Drilling Operation Performed - 98 |
| 1983-10-29 | Lost Circulation Occurred |
| 1983-11-21 | Lost Circulation Occurred |
| 1983-11-26 | Finished Drilling |
| 1983-11-26 | Well Log Performed |
| 1983-11-26 | Well Mode changed to Drilled and Cased |
| 1983-11-29 | Liner Casing Operation Performed |
| 1983-12-21 | Well Log Performed |
| 1983-12-22 | Perforation Treatment Performed - Jet Perforation |
| 1983-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-12-29 | Well Began Production |
| 1983-12-29 | Well Fluid changed to Crude Oil |
| 1983-12-29 | Well Mode changed to Flowing |
| 1984-02-08 | Well Log Performed |
| 1986-01-11 | Well Fluid changed to Crude Oil |
| 1986-01-11 | Well Mode changed to Pumping |
| 1986-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1986-01-12 | Well Log Performed |
| 1986-01-13 | Perforation Treatment Performed - Jet Perforation |
| 1986-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-01-20 | Perforation Treatment Performed - Jet Perforation |
| 1986-01-20 | Well Log Performed |
| 1986-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-10-12 | Well Log Performed |
| 1989-10-14 | Perforation Treatment Performed - Jet Perforation |
| 1989-10-14 | Well Log Performed |
| 1989-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-10-19 | Perforation Treatment Performed - Cement Squeeze |
| 1989-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-10-23 | Perforation Treatment Performed - Jet Perforation |
| 1989-10-23 | Well Log Performed |
| 1990-11-25 | Perforation Treatment Performed - Chemical Squeeze |
| 1990-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1996-03-24 | Perforation Treatment Performed - Remedial Casing |
| 1996-03-26 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2007-09-01 | Well Fluid changed to Crude Oil |
| 2007-09-01 | Well Mode changed to Suspended |
| 2016-01-26 | Well Log Performed |
| 2016-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-01-30 | Well Log Performed |
| 2016-01-31 | Perforation Treatment Performed - Jet Perforation |
| 2016-01-31 | Well Log Performed |
| 2016-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-02-03 | Perforation Treatment Performed - Cement Plug |
| 2016-02-03 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1983-10-26 | 1099.00 | Conversion |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-12-22 | Perforation | 1761.00 | 1762.00 | 7 |
| 1986-01-20 | Perforation | 1754.50 | 1757.00 | 7 |
| 1986-01-21 | Acid Treatment | 1749.00 | 1757.00 | 0 |
| 1989-10-14 | Perforation | 1729.00 | 1731.00 | 13 |
| 1989-10-15 | Acid Treatment | 1729.00 | 1757.00 | 0 |
| 1989-10-19 | Cement Squeeze | 1729.00 | 1731.00 | 0 |
| 1989-10-23 | Perforation | 1761.00 | 1762.50 | 13 |
| 1989-10-23 | Acid Treatment | 1761.00 | 1762.50 | 0 |
| 1990-11-25 | Chemical Squeeze | 1761.00 | 1762.50 | 0 |
| 1990-11-27 | Acid Treatment | 1761.00 | 1762.50 | 0 |
| 1996-03-22 | Perforation | 275.00 | 276.00 | 14 |
| 1983-12-22 | Perforation | 1767.50 | 1772.00 | 7 |
| 1996-03-24 | Remedial Casing Cementing | 275.00 | 276.00 | 0 |
| 1996-03-26 | Casing Patch | 275.00 | 276.00 | 0 |
| 2016-01-29 | Packing Device Capped w/Cement | 1695.00 | 1703.00 | 0 |
| 2016-01-29 | Packing Device Capped w/Cement | 1308.50 | 1316.50 | 0 |
| 2016-01-31 | Perforation | 636.50 | 639.50 | 34 |
| 2016-02-03 | Remedial Casing Cementing | 636.50 | 639.50 | 0 |
| 2016-02-03 | Cement Plug | 632.50 | 639.50 | 0 |
| 2016-02-03 | Packing Device Capped w/Cement | 622.50 | 632.00 | 0 |
| 1983-12-23 | Acid Treatment | 1761.00 | 1772.00 | 0 |
| 1986-01-12 | Packing Device Capped w/Cement | 1765.50 | 1766.50 | 0 |
| 1986-01-13 | Perforation | 1749.00 | 1751.50 | 7 |
| 1986-01-13 | Perforation | 1754.50 | 1757.00 | 7 |
| 1986-01-15 | Acid Treatment | 1749.00 | 1762.00 | 0 |
| 1986-01-17 | Acid Treatment | 1749.00 | 1757.00 | 0 |
| 1986-01-20 | Perforation | 1749.00 | 1751.50 | 7 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1983 | 72 | 0.0 | 0.0 | 0.0 |
| 1984 | 6537 | 0.0 | 0.0 | 0.0 |
| 1985 | 7073 | 0.0 | 0.0 | 0.0 |
| 1986 | 7637 | 0.0 | 0.0 | 0.0 |
| 1987 | 7827 | 0.0 | 0.0 | 0.0 |
| 1988 | 7621 | 0.0 | 0.0 | 0.0 |
| 1989 | 7495 | 0.0 | 0.0 | 0.0 |
| 1990 | 7882 | 0.0 | 0.0 | 0.0 |
| 1991 | 8076 | 0.0 | 0.0 | 0.0 |
| 1992 | 7227 | 0.0 | 0.0 | 0.0 |
| 1993 | 6668 | 0.0 | 0.0 | 0.0 |
| 1994 | 6291 | 0.0 | 0.0 | 0.0 |
| 1995 | 8359 | 0.0 | 0.0 | 0.0 |
| 1996 | 7945 | 0.0 | 0.0 | 0.0 |
| 1997 | 8017 | 0.0 | 0.0 | 0.0 |
| 1998 | 8174 | 0.0 | 0.0 | 0.0 |
| 1999 | 8100 | 0.0 | 0.0 | 0.0 |
| 2000 | 8705 | 0.0 | 0.0 | 0.0 |
| 2001 | 6907 | 0.0 | 0.0 | 0.0 |
| 2002 | 7278 | 0.0 | 0.0 | 0.0 |
| 2003 | 4334 | 0.0 | 0.0 | 0.0 |
| 2004 | 6668 | 0.0 | 0.0 | 0.0 |
| 2005 | 6849 | 0.0 | 0.0 | 0.0 |
| 2006 | 2482 | 0.0 | 0.0 | 0.0 |
| 2007 | 4254 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1983-10-29 | Lost Circulation | 821.00 | 1536.00 |
| 1983-11-21 | Lost Circulation | 1598.00 | 1612.00 |
| 2016-02-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]