X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1106073312000

Well Details

Well ID: 1106073312000
Loading map...
Location: 00/12-33-110-07W6/0
Location Alias: 00/12-33-10-07 W6M
Location Alias 2: 00/12-33-110-07 W6/00
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 07
Section: 33
County/Municipality: Mackenzie County
Well Name: CONTINENTAL COMET RAIN 12-33-110-7
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0033153
License Date: 1967-11-30
License Status: RecCertified
Spud Date: 1967-12-05
Final Drill Date: 1967-12-24
Well Total Depth: 1810.50 m
Surface Hole Latitude: 58.595643
Surface Hole Longitude: -119.113712

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-11-30 Obtained License
1967-12-24 Finished Drilling
1967-12-24 Production Casing Operation Performed
1967-12-24 Well Mode changed to Drilled and Cased
1968-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-02-25 Perforation Treatment Performed - Jet Perforation
1968-03-11 Well Began Production
1968-03-11 Well Fluid changed to Crude Oil
1968-03-11 Well Mode changed to Flowing
1968-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-19 Perforation Treatment Performed - Cement Squeeze
1968-07-20 Perforation Treatment Performed - Jet Perforation
1968-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-23 Well Fluid changed to Crude Oil
1968-07-23 Well Mode changed to Suspended
1971-06-30 Perforation Treatment Performed - Cement Squeeze
1971-07-01 Perforation Treatment Performed - Cement Squeeze
1971-07-04 Perforation Treatment Performed - Jet Perforation
1971-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-08-04 Well Began Injection
1971-08-04 Well Fluid changed to Water
1971-08-04 Well Type changed to Disposal
1976-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-26 Perforation Treatment Performed - Cement Squeeze
1980-05-11 Well Abandoned
1980-05-11 Well Fluid changed to Water
1980-05-11 Well Mode changed to Abandoned
1980-05-11 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-02-25 Perforation 1784.00 1787.00 7
1971-07-01 Cement Squeeze 1782.50 1782.80 0
1971-07-04 Perforation 1801.40 1804.40 7
1971-07-05 Acid Treatment 1801.40 1804.40 0
1976-07-15 Acid Treatment 1801.40 1804.40 0
1979-09-26 Cement Squeeze 1801.40 1804.40 0
1968-02-25 Acid Treatment 1784.00 1787.00 0
1968-07-19 Acid Treatment 1784.00 1787.00 0
1968-07-19 Cement Squeeze 1784.00 1787.00 0
1968-07-20 Perforation 1782.50 1782.80 16
1968-07-21 Acid Treatment 1782.50 1782.80 0
1968-07-21 Acid Treatment 1782.50 1782.80 0
1971-06-30 Cement Squeeze 1782.50 1782.80 0
1971-06-30 Cement Squeeze 1782.50 1782.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 375 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

References