X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1106092714000

Well Details

Well ID: 1106092714000
Loading map...
Location: 00/14-27-110-09W6/0
Location Alias: 00/14-27-10-09 W6M
Location Alias 2: 00/14-27-110-09 W6/00
Country: Canada
Province: Alberta
Township: 110
Meridian: 6
Range: 09
Section: 27
County/Municipality: Mackenzie County
Well Name: HUSKY BLACK 14-27-110-9
Operator Name: Husky Oil Operations Limited
License Number: 0327296
License Date: 2005-03-01
License Status: Abandoned
Spud Date: 2005-08-25
Final Drill Date: 2005-09-10
Well Total Depth: 1855.00 m
Surface Hole Latitude: 58.585519
Surface Hole Longitude: -119.412148

For data sources see[1][2]

Well History

Date Event
2005-03-01 Obtained License
2005-08-26 Surface Casing Operation Performed
2005-09-06 Well Log Performed
2005-09-08 Production Casing Operation Performed
2005-09-10 Finished Drilling
2005-09-10 Perforation Treatment Performed - Open-Hole Completion
2005-09-10 Well Log Performed
2005-09-10 Well Mode changed to Drilled and Cased
2005-09-11 Well Log Performed
2005-09-12 Rig Released
2005-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-06 Well Log Performed
2005-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-10 Perforation Treatment Performed - Jet Perforation
2005-11-10 Plug Back Performed
2005-11-10 Well Mode changed to Abandoned Zone
2006-01-26 Well Log Performed
2006-08-03 Perforation Treatment Performed - Jet Perforation
2006-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-08-05 Perforation Treatment Performed - Cement Squeeze
2006-08-22 Perforation Treatment Performed - Cement Squeeze
2006-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-08-26 Perforation Treatment Performed - Jet Perforation
2007-12-11 Well Log Performed
2007-12-12 Well Log Performed
2007-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-13 Perforation Treatment Performed - Jet Perforation
2007-12-13 Plug Back Performed
2007-12-15 Perforation Treatment Performed - Fractured
2007-12-16 Well Log Performed
2007-12-18 Well Log Performed
2010-11-17 Well Log Performed
2010-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-18 Well Log Performed
2010-11-20 Well Log Performed
2010-11-28 Perforation Treatment Performed - Jet Perforation
2010-11-28 Well Log Performed
2010-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-01 Perforation Treatment Performed - Remedial Casing
2010-12-07 Perforation Treatment Performed - Jet Perforation
2010-12-07 Well Log Performed
2010-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-09 Perforation Treatment Performed - Remedial Casing
2010-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-12 Perforation Treatment Performed - Jet Perforation
2010-12-13 Perforation Treatment Performed - Remedial Casing
2011-01-31 Perforation Treatment Performed - Jet Perforation
2011-01-31 Well Log Performed
2011-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-02 Perforation Treatment Performed - Remedial Casing
2011-02-02 Plug Back Performed
2011-03-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-10 Open Hole/Barefoot Completion 1790.00 1855.00 0
2006-08-26 Perforation 1726.30 1727.30 14
2006-08-26 Acid Treatment 1726.30 1727.30 0
2007-12-13 Packing Device Capped w/Cement 1715.00 1723.00 0
2007-12-13 Perforation 1555.00 1565.00 20
2007-12-15 Fracture 1555.00 1565.00 0
2010-11-18 Packing Device Capped w/Cement 1535.00 1543.00 0
2010-11-28 Perforation 680.50 682.50 13
2010-11-30 Acid Treatment 680.50 682.50 0
2010-12-01 Remedial Casing Cementing 680.50 682.50 0
2010-12-01 Packing Device Capped w/Cement 668.80 676.80 0
2005-11-06 Acid Treatment 1790.00 1855.00 0
2010-12-07 Perforation 467.50 469.50 13
2010-12-08 Acid Treatment 467.50 469.50 0
2010-12-09 Remedial Casing Cementing 467.50 469.50 0
2010-12-12 Perforation 467.50 469.50 13
2010-12-12 Acid Treatment 467.50 469.50 0
2010-12-13 Remedial Casing Cementing 467.50 469.50 0
2011-01-31 Perforation 439.50 442.50 17
2011-01-31 Perforation 439.50 442.50 17
2011-02-01 Acid Treatment 439.50 442.50 0
2011-02-02 Remedial Casing Cementing 439.50 442.50 0
2005-11-10 Packing Device Capped w/Cement 1781.00 1789.00 0
2011-02-02 Packing Device Capped w/Cement 395.30 435.00 0
2005-11-10 Perforation 1726.00 1727.50 13
2006-08-03 Perforation 1738.50 1739.50 17
2006-08-04 Acid Treatment 1726.00 1727.50 0
2006-08-04 Acid Treatment 1738.50 1739.50 0
2006-08-05 Cement Squeeze 1738.50 1739.50 0
2006-08-22 Cement Squeeze 1726.00 1727.50 0

For data sources see[4]



References