X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1116050107002

Well Details

Well ID: 1116050107002
Loading map...
Location: 00/07-01-111-05W6/2
Location Alias: 00/07-01-11-05 W6M
Location Alias 2: 00/07-01-111-05 W6/02
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 05
Section: 01
County/Municipality: Mackenzie County
Well Name: IOE HERSHEY CAP RAIN 7-1-111-5
Operator Name: Obsidian Energy Ltd.
License Number: 0059867
License Date: 1976-08-23
License Status: Abandoned
Spud Date: 1976-09-26
Final Drill Date: 1976-09-28
Well Total Depth: 449.60 m
Surface Hole Latitude: 58.606563
Surface Hole Longitude: -118.684100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-23 Obtained License
1976-09-28 Finished Drilling
1976-09-29 Production Casing Operation Performed
1976-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-22 Perforation Treatment Performed - Jet Perforation
1976-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-02 Perforation Treatment Performed - Jet Perforation
1976-11-15 Perforation Treatment Performed - Fractured
1977-05-01 Well Mode changed to Drilled and Cased
1978-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-02-19 Well Mode changed to Drilled and Cased
1978-02-20 Perforation Treatment Performed - Cement Squeeze
1978-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-07 Perforation Treatment Performed - Jet Perforation
1979-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-09 Perforation Treatment Performed - Cement Squeeze
1996-04-01 Well Began Production
1996-04-01 Well Fluid changed to Gas
1996-04-01 Well Mode changed to Flowing
2004-10-29 Well Fluid changed to Gas
2004-10-29 Well Mode changed to Suspended
2012-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-23 Plug Back Performed
2012-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Plug Back Performed
2012-02-24 Well Fluid changed to Gas
2012-02-24 Well Mode changed to Abandoned Zone
2020-02-10 Well Abandoned
2020-02-10 Well Fluid changed to Gas
2020-02-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-22 Perforation 405.40 408.40 3
1979-03-07 Perforation 353.60 356.60 3
1979-03-08 Acid Treatment 353.60 356.60 0
1979-03-09 Cement Squeeze 353.60 356.60 0
2012-02-23 Packing Device Capped w/Cement 339.00 347.00 0
2012-02-24 Packing Device Capped w/Cement 317.50 325.50 0
1976-10-22 Acid Treatment 405.40 408.40 0
1976-11-02 Perforation 330.40 337.10 3
1976-11-02 Perforation 353.60 356.60 3
1976-11-02 Acid Treatment 330.40 356.60 0
1976-11-15 Fracture 330.40 356.60 0
1978-02-19 Packing Device Capped w/Cement 395.60 395.60 0
1978-02-20 Cement Squeeze 353.60 356.60 0
1978-04-02 Acid Treatment 330.40 337.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5212 0.0 0.0 0.0
1997 2008 0.0 0.0 0.0
2000 800 0.0 0.0 0.0

For data sources see[5]

References