X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146051510000

Well Details

Well ID: 1146051510000
Loading map...
Location: 00/10-15-114-05W6/0
Location Alias: 00/10-15-14-05 W6M
Location Alias 2: 00/10-15-114-05 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 05
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 10-15-114-5
Operator Name: Paramount Resources Ltd.
License Number: 0279214
License Date: 2002-12-20
License Status: Abandoned
Spud Date: 2003-01-19
Final Drill Date: 2003-02-06
Well Total Depth: 1480.00 m
Surface Hole Latitude: 58.899660
Surface Hole Longitude: -118.742616

For data sources see[1][2]

Well History

Date Event
2002-12-20 Obtained License
2003-01-22 Surface Casing Operation Performed
2003-01-26 Well Log Performed
2003-01-28 Production Casing Operation Performed
2003-02-06 Finished Drilling
2003-02-06 Perforation Treatment Performed - Open-Hole Completion
2003-02-06 Well Log Performed
2003-02-06 Well Mode changed to Drilled and Cased
2003-02-07 Rig Released
2003-02-07 Well Log Performed
2003-02-12 Perforation Treatment Performed - Jet Perforation
2003-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-04-08 Well Began Production
2003-04-08 Well Fluid changed to Crude Oil
2003-04-08 Well Mode changed to Pumping
2003-04-21 Well Log Performed
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Suspended
2010-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-15 Plug Back Performed
2010-07-15 Well Fluid changed to Crude Oil
2010-07-15 Well Log Performed
2010-07-15 Well Mode changed to Abandoned Zone
2010-07-28 Well Log Performed
2010-08-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-06 Open Hole/Barefoot Completion 1438.00 1480.00 0
2003-02-12 Perforation 1257.00 1259.00 17
2003-02-14 Acid Treatment 1257.00 1259.00 0
2010-07-15 Packing Device Capped w/Cement 1422.00 1430.00 0
2010-07-15 Packing Device Capped w/Cement 1245.50 1253.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5653 0.0 0.0 0.0
2004 8340 0.0 0.0 0.0
2005 8581 0.0 0.0 0.0
2006 8556 0.0 0.0 0.0
2007 8629 0.0 0.0 0.0
2008 6243 0.0 0.0 0.0
2009 76 0.0 0.0 0.0

For data sources see[5]

References