X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146051907000

Well Details

Well ID: 1146051907000
Loading map...
Location: 00/07-19-114-05W6/0
Location Alias: 00/07-19-14-05 W6M
Location Alias 2: 00/07-19-114-05 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 05
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 7-19-114-5
Operator Name: Paramount Resources Ltd.
License Number: 0037822
License Date: 1970-02-18
License Status: Abandoned
Spud Date: 1970-02-22
Final Drill Date: 1970-03-09
Well Total Depth: 1513.60 m
Surface Hole Latitude: 58.914041
Surface Hole Longitude: -118.830211

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-02-18 Obtained License
1970-03-02 Well Log Performed
1970-03-03 Drill Stem Test Performed
1970-03-09 Finished Drilling
1970-03-09 Well Log Performed
1970-03-09 Well Mode changed to Drilled and Cased
1970-03-11 Liner Casing Operation Performed
1970-03-15 Perforation Treatment Performed - Jet Perforation
1970-03-16 Well Began Production
1970-03-16 Well Fluid changed to Crude Oil
1970-03-16 Well Mode changed to Flowing
1971-06-24 Perforation Treatment Performed - Acid Wash - No Pressure
1972-06-01 Well Fluid changed to Crude Oil
1972-06-01 Well Mode changed to Pumping
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Suspended
1976-08-13 Perforation Treatment Performed - Jet Perforation
1976-12-04 Well Fluid changed to Crude Oil
1976-12-04 Well Mode changed to Pumping
1988-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-22 Plug Back Performed
1988-03-22 Well Fluid changed to Crude Oil
1988-03-22 Well Mode changed to Abandoned Zone
1989-03-21 Well Log Performed
2004-09-14 Well Log Performed
2004-09-16 Well Log Performed
2004-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-17 Perforation Treatment Performed - Jet Perforation
2004-09-20 Perforation Treatment Performed - Remedial Casing
2004-09-20 Production Casing Operation Performed
2004-09-24 Well Abandoned
2004-09-24 Well Fluid changed to Crude Oil
2004-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-03-15 Perforation 1470.10 1474.00 7
1971-06-24 Acid Wash 1470.10 1474.00 0
1976-08-13 Perforation 1460.60 1464.30 7
1988-03-22 Packing Device Capped w/Cement 1442.00 1450.00 0
2004-09-17 Packing Device Capped w/Cement 1383.30 1398.30 0
2004-09-17 Perforation 292.00 292.90 99
2004-09-17 Perforation 610.00 610.30 99
2004-09-17 Perforation 670.00 670.90 99
2004-09-20 Remedial Casing Cementing 292.00 670.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 3901 0.0 0.0 0.0
1971 2650 0.0 0.0 0.0
1972 6097 0.0 0.0 0.0
1973 8176 0.0 0.0 0.0
1974 4391 0.0 0.0 0.0
1975 5170 0.0 0.0 0.0
1976 1296 0.0 0.0 0.0
1977 3763 0.0 0.0 0.0
1978 5899 0.0 0.0 0.0
1979 3288 0.0 0.0 0.0
1980 8615 0.0 0.0 0.0
1981 7564 0.0 0.0 0.0
1982 6640 0.0 0.0 0.0
1983 5611 0.0 0.0 0.0
1984 6337 0.0 0.0 0.0
1985 6586 0.0 0.0 0.0
1986 6311 0.0 0.0 0.0

For data sources see[5]

References