If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146052203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.90776,"lon":-118.74824,"icon":""}]} |
| Location: 00/03-22-114-05W6/0 | |
| Location Alias: 00/03-22-14-05 W6M | |
| Location Alias 2: 00/03-22-114-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 22 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 3-22-114-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0037540 | |
| License Date: 1970-01-06 | |
| License Status: Abandoned | |
| Spud Date: 1970-02-18 | |
| Final Drill Date: 1970-03-13 | |
| Well Total Depth: 1533.10 m | |
| Surface Hole Latitude: 58.907760 | |
| Surface Hole Longitude: -118.748240 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1970-01-06 | Obtained License |
| 1970-03-12 | Drill Stem Test Performed |
| 1970-03-13 | Finished Drilling |
| 1970-03-13 | Well Mode changed to Drilled and Cased |
| 1970-03-15 | Liner Casing Operation Performed |
| 1970-03-24 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1970-03-24 | Perforation Treatment Performed - Jet Perforation |
| 1970-03-24 | Well Began Production |
| 1970-03-24 | Well Fluid changed to Crude Oil |
| 1970-03-24 | Well Mode changed to Flowing |
| 1973-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-05-22 | Well Fluid changed to Crude Oil |
| 1985-05-22 | Well Mode changed to Suspended |
| 1988-02-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-02-28 | Plug Back Performed |
| 1988-02-28 | Well Fluid changed to Crude Oil |
| 1988-02-28 | Well Mode changed to Abandoned Zone |
| 1990-11-03 | Well Log Performed |
| 1995-03-15 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-17 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-18 | Well Log Performed |
| 1995-03-19 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-20 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-22 | Perforation Treatment Performed - Cement Squeeze |
| 1996-04-05 | Well Log Performed |
| 1996-04-06 | Perforation Treatment Performed - Jet Perforation |
| 1996-04-06 | Well Log Performed |
| 1996-04-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-04-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-04-07 | Perforation Treatment Performed - Jet Perforation |
| 1996-04-07 | Plug Back Performed |
| 2009-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-24 | Well Log Performed |
| 2009-02-27 | Well Log Performed |
| 2009-02-28 | Well Log Performed |
| 2009-03-01 | Well Log Performed |
| 2009-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-02 | Perforation Treatment Performed - Remedial Casing |
| 2009-03-03 | Well Log Performed |
| 2009-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-04 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-04 | Plug Back Performed |
| 2009-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-06 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-03-07 | Well Log Performed |
| 2009-03-09 | Well Log Performed |
| 2009-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-03-10 | Perforation Treatment Performed - Jet Perforation |
| 2009-03-10 | Perforation Treatment Performed - Remedial Casing |
| 2009-03-20 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1970-03-24 | Perforation | 1435.00 | 1436.20 | 7 |
| 1995-03-16 | Acid Treatment | 1341.00 | 1341.50 | 0 |
| 1995-03-17 | Cement Squeeze | 1341.00 | 1341.50 | 0 |
| 1995-03-18 | Acid Treatment | 1329.50 | 1330.00 | 0 |
| 1995-03-19 | Perforation | 1325.50 | 1326.50 | 13 |
| 1995-03-19 | Cement Squeeze | 1325.50 | 1330.00 | 0 |
| 1995-03-20 | Perforation | 1244.00 | 1244.50 | 13 |
| 1995-03-20 | Perforation | 1255.50 | 1256.00 | 13 |
| 1995-03-22 | Acid Treatment | 1244.00 | 1256.00 | 0 |
| 1995-03-22 | Cement Squeeze | 1244.00 | 1256.00 | 0 |
| 1996-04-06 | Perforation | 1336.60 | 1337.20 | 13 |
| 1970-03-24 | Perforation | 1438.00 | 1441.70 | 7 |
| 1996-04-07 | Acid Treatment | 1336.60 | 1337.20 | 0 |
| 1996-04-07 | Packing Device Capped w/Cement | 1312.00 | 1320.00 | 0 |
| 1996-04-07 | Perforation | 1248.50 | 1250.30 | 13 |
| 1996-04-07 | Acid Treatment | 1248.50 | 1250.30 | 0 |
| 2009-02-23 | Perforation | 1336.00 | 1337.20 | 13 |
| 2009-03-02 | Packing Device Capped w/Cement | 1312.00 | 1323.00 | 0 |
| 2009-03-02 | Remedial Casing Cementing | 1336.00 | 1337.20 | 0 |
| 2009-03-04 | Packing Device Capped w/Cement | 1227.00 | 1235.00 | 0 |
| 2009-03-04 | Perforation | 642.00 | 643.00 | 20 |
| 2009-03-05 | Perforation | 286.00 | 287.00 | 20 |
| 1970-03-24 | Perforation | 1444.10 | 1448.40 | 7 |
| 2009-03-05 | Acid Treatment | 642.00 | 643.00 | 0 |
| 2009-03-05 | Packing Device Capped w/Cement | 627.00 | 635.00 | 0 |
| 2009-03-06 | Perforation | 263.00 | 264.00 | 20 |
| 2009-03-06 | Packing Device Capped w/Cement | 276.00 | 284.00 | 0 |
| 2009-03-07 | Acid Treatment | 263.00 | 264.00 | 0 |
| 2009-03-10 | Perforation | 226.00 | 227.00 | 17 |
| 2009-03-10 | Remedial Casing Cementing | 226.00 | 227.00 | 0 |
| 2009-03-10 | Packing Device Capped w/Cement | 252.00 | 260.00 | 0 |
| 1970-03-24 | Perforation | 1449.00 | 1452.40 | 7 |
| 1970-03-24 | Acid Wash | 1435.00 | 1452.40 | 0 |
| 1973-01-26 | Acid Treatment | 1435.00 | 1452.40 | 0 |
| 1988-02-28 | Packing Device Capped w/Cement | 1426.00 | 1426.00 | 0 |
| 1995-03-15 | Perforation | 1329.50 | 1330.00 | 13 |
| 1995-03-15 | Perforation | 1341.00 | 1341.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1970 | 3506 | 0.0 | 0.0 | 0.0 |
| 1971 | 6805 | 0.0 | 0.0 | 0.0 |
| 1972 | 8105 | 0.0 | 0.0 | 0.0 |
| 1973 | 7923 | 0.0 | 0.0 | 0.0 |
| 1974 | 6409 | 0.0 | 0.0 | 0.0 |
| 1975 | 5847 | 0.0 | 0.0 | 0.0 |
| 1976 | 4074 | 0.0 | 0.0 | 0.0 |
| 1977 | 3144 | 0.0 | 0.0 | 0.0 |
| 1978 | 3490 | 0.0 | 0.0 | 0.0 |
| 1979 | 3024 | 0.0 | 0.0 | 0.0 |
| 1980 | 2551 | 0.0 | 0.0 | 0.0 |
| 1981 | 935 | 0.0 | 0.0 | 0.0 |
| 1982 | 3482 | 0.0 | 0.0 | 0.0 |
| 1983 | 4474 | 0.0 | 0.0 | 0.0 |
| 1984 | 2644 | 0.0 | 0.0 | 0.0 |
For data sources see[5]