X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146052705000

Well Details

Well ID: 1146052705000
Loading map...
Location: 00/05-27-114-05W6/0
Location Alias: 00/05-27-14-05 W6M
Location Alias 2: 00/05-27-114-05 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 05
Section: 27
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 5-27-114-5
Operator Name: Paramount Resources Ltd.
License Number: 0035765
License Date: 1969-02-07
License Status: Suspension
Spud Date: 1969-02-10
Final Drill Date: 1969-02-26
Well Total Depth: 1519.40 m
Surface Hole Latitude: 58.928565
Surface Hole Longitude: -118.760109

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-07 Obtained License
1969-02-26 Finished Drilling
1969-02-26 Well Mode changed to Drilled and Cased
1969-02-28 Drill Stem Test Performed
1969-03-01 Liner Casing Operation Performed
1969-03-11 Perforation Treatment Performed - Jet Perforation
1969-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-13 Well Began Production
1969-03-13 Well Fluid changed to Crude Oil
1969-03-13 Well Mode changed to Flowing
1969-06-12 Well Fluid changed to Crude Oil
1969-06-12 Well Mode changed to Pumping
1973-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-05 Perforation Treatment Performed - Cement Squeeze
1985-12-06 Perforation Treatment Performed - Jet Perforation
1985-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-19 Well Log Performed
1988-09-06 Perforation Treatment Performed - Jet Perforation
1988-09-06 Well Log Performed
1988-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-16 Well Log Performed
1994-09-18 Well Log Performed
1994-09-19 Perforation Treatment Performed - Jet Perforation
1994-09-20 Perforation Treatment Performed - Remedial Casing
1994-09-23 Perforation Treatment Performed - Jet Perforation
1994-09-23 Well Log Performed
1994-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-24 Perforation Treatment Performed - Remedial Casing
1994-09-27 Perforation Treatment Performed - Jet Perforation
1994-09-27 Well Log Performed
1994-10-26 Well Log Performed
1994-10-28 Perforation Treatment Performed - Remedial Casing
1994-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-18 Perforation Treatment Performed - Jet Perforation
1996-01-18 Plug Back Performed
1996-01-18 Well Fluid changed to Crude Oil
1996-01-18 Well Mode changed to Abandoned Zone
1996-01-19 Perforation Treatment Performed - Jet Perforation
1996-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-26 Perforation Treatment Performed - Jet Perforation
1996-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-11 Perforation 1453.30 1455.10 7
1988-09-07 Acid Treatment 1450.80 1457.50 0
1994-09-19 Perforation 1308.00 1308.80 13
1994-09-20 Remedial Casing Cementing 1308.00 1308.80 0
1994-09-23 Perforation 1054.50 1055.00 13
1994-09-24 Acid Treatment 1054.50 1055.00 0
1994-09-24 Remedial Casing Cementing 1054.50 1055.00 0
1994-09-27 Perforation 1256.60 1257.60 13
1994-10-28 Remedial Casing Cementing 1256.60 1257.60 0
1994-11-03 Acid Treatment 1450.80 1457.50 0
1996-01-18 Packing Device Capped w/Cement 1441.00 1449.00 0
1969-03-11 Perforation 1468.50 1470.10 7
1996-01-18 Perforation 1337.30 1341.10 13
1996-01-18 Perforation 1342.30 1346.00 13
1996-01-19 Perforation 1335.60 1336.60 13
1996-01-24 Acid Treatment 1335.60 1346.00 0
1996-01-26 Perforation 1250.90 1262.90 13
1996-01-28 Acid Treatment 1250.90 1262.90 0
1969-03-12 Acid Treatment 1453.30 1470.10 0
1973-03-28 Acid Treatment 1453.30 1470.10 0
1985-12-05 Cement Squeeze 1468.50 1470.10 0
1985-12-06 Perforation 1450.80 1457.50 13
1985-12-07 Acid Treatment 1450.80 1457.50 0
1988-09-06 Perforation 1450.80 1455.10 13
1988-09-06 Perforation 1456.60 1457.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 3918 0.0 0.0 0.0
1970 6409 0.0 0.0 0.0
1971 3196 0.0 0.0 0.0
1972 2800 0.0 0.0 0.0
1973 6389 0.0 0.0 0.0
1974 2721 0.0 0.0 0.0
1975 4481 0.0 0.0 0.0
1976 4979 0.0 0.0 0.0
1977 4891 0.0 0.0 0.0
1978 6121 0.0 0.0 0.0
1979 7644 0.0 0.0 0.0
1980 7557 0.0 0.0 0.0
1981 5176 0.0 0.0 0.0
1982 7840 0.0 0.0 0.0
1983 7913 0.0 0.0 0.0
1984 7576 0.0 0.0 0.0
1985 6113 0.0 0.0 0.0
1986 7961 0.0 0.0 0.0
1987 8306 0.0 0.0 0.0
1988 7600 0.0 0.0 0.0
1989 8174 0.0 0.0 0.0
1990 8325 0.0 0.0 0.0
1991 7911 0.0 0.0 0.0
1992 7831 0.0 0.0 0.0
1993 7206 0.0 0.0 0.0
1994 6706 0.0 0.0 0.0
1995 7110 0.0 0.0 0.0

For data sources see[5]

References