X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146053215000

Well Details

Well ID: 1146053215000
Loading map...
Location: 00/15-32-114-05W6/0
Location Alias: 00/15-32-14-05 W6M
Location Alias 2: 00/15-32-114-05 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 05
Section: 32
County/Municipality: Mackenzie County
Well Name: PETRODYNE ET AL VIRGO 15-32-114-5
Operator Name: Petrodyne Ltd
License Number: 0041026
License Date: 1971-10-08
License Status: Re-Entered
Spud Date: 1971-10-14
Final Drill Date: 1971-10-27
Well Total Depth: 1525.20 m
Surface Hole Latitude: 58.949734
Surface Hole Longitude: -118.803021

For data sources see[1][2]

Well History

Date Event
1971-10-08 Obtained License
1971-10-23 Well Log Performed
1971-10-27 Drill Stem Test Performed
1971-10-27 Finished Drilling
1971-10-27 Well Mode changed to Drilled and Cased
1971-10-29 Well Log Performed
1971-10-30 Liner Casing Operation Performed
1971-11-30 Perforation Treatment Performed - Jet Perforation
1971-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-02 Well Began Production
1971-12-02 Well Fluid changed to Crude Oil
1971-12-02 Well Mode changed to Pumping
1972-01-15 Perforation Treatment Performed - Cement Squeeze
1972-01-23 Perforation Treatment Performed - Jet Perforation
1972-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-11-01 Well Fluid changed to Crude Oil
1984-11-01 Well Mode changed to Suspended
1989-02-01 Well Log Performed
1989-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-04 Plug Back Performed
1989-03-04 Well Fluid changed to Crude Oil
1989-03-04 Well Log Performed
1989-03-04 Well Mode changed to Abandoned and Re-entered
1989-03-05 Perforation Treatment Performed - Jet Perforation
1989-03-06 Perforation Treatment Performed - Cement Squeeze
1989-09-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-11-30 Perforation 1473.40 1475.20 7
1971-12-01 Acid Treatment 1473.40 1475.20 0
1972-01-15 Cement Squeeze 1473.40 1475.20 0
1972-01-23 Perforation 1480.40 1481.90 7
1972-01-26 Acid Treatment 1480.40 1481.90 0
1989-03-04 Packing Device Capped w/Cement 1342.00 1350.00 0
1989-03-05 Perforation 569.80 570.00 13
1989-03-06 Cement Squeeze 569.80 570.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 0 0.0 0.0 0.0
1972 5562 0.0 0.0 0.0
1973 7692 0.0 0.0 0.0
1974 6488 0.0 0.0 0.0
1975 7529 0.0 0.0 0.0
1976 4368 0.0 0.0 0.0
1977 5746 0.0 0.0 0.0
1978 5139 0.0 0.0 0.0
1979 4300 0.0 0.0 0.0
1980 4322 0.0 0.0 0.0
1981 3851 0.0 0.0 0.0
1982 7358 0.0 0.0 0.0
1983 6869 0.0 0.0 0.0
1984 5000 0.0 0.0 0.0

For data sources see[5]

References