X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146061509000

Well Details

Well ID: 1146061509000
Loading map...
Location: 00/09-15-114-06W6/0
Location Alias: 00/09-15-14-06 W6M
Location Alias 2: 00/09-15-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL AMBER VIRGO 9-15-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0174814
License Date: 1995-01-11
License Status: Abandoned
Spud Date: 1995-03-06
Final Drill Date: 1995-03-17
Well Total Depth: 1530.00 m
Surface Hole Latitude: 58.901159
Surface Hole Longitude: -118.906214

For data sources see[1][2]

Well History

Date Event
1995-01-11 Obtained License
1995-03-08 Surface Casing Operation Performed
1995-03-08 Well Log Performed
1995-03-14 Well Log Performed
1995-03-15 Production Casing Operation Performed
1995-03-17 Finished Drilling
1995-03-17 Well Log Performed
1995-03-17 Well Mode changed to Drilled and Cased
1995-03-18 Plug Back Performed
1995-03-19 Perforation Treatment Performed - Open-Hole Completion
1995-03-19 Rig Released
1995-03-27 Perforation Treatment Performed - Jet Perforation
1995-05-08 Well Began Production
1995-05-08 Well Fluid changed to Crude Oil
1995-05-08 Well Mode changed to Pumping
1995-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-28 Perforation Treatment Performed - Jet Perforation
1999-09-28 Well Log Performed
1999-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-07 Well Log Performed
2005-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-08 Perforation Treatment Performed - Jet Perforation
2005-12-08 Plug Back Performed
2005-12-08 Well Fluid changed to Crude Oil
2005-12-08 Well Mode changed to Abandoned Zone
2005-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-11 Well Log Performed
2005-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-12 Plug Back Performed
2010-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-19 Open Hole/Barefoot Completion 1472.00 1506.00 0
2005-12-08 Perforation 1296.00 1299.00 13
2005-12-09 Acid Treatment 1296.00 1299.00 0
2005-12-12 Packing Device Capped w/Cement 1283.00 1291.00 0
1995-03-27 Perforation 1485.00 1488.00 13
1995-09-19 Acid Treatment 1472.00 1506.00 0
1999-09-28 Perforation 1490.00 1493.00 13
1999-09-28 Perforation 1491.20 1497.20 13
1999-09-28 Perforation 1497.00 1500.50 13
1999-09-28 Perforation 1502.00 1504.00 13
1999-09-29 Acid Treatment 1485.00 1504.00 0
2005-12-08 Packing Device Capped w/Cement 1454.00 1462.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5348 0.0 0.0 0.0
1996 8226 0.0 0.0 0.0
1997 7973 0.0 0.0 0.0
1998 8334 0.0 0.0 0.0
1999 8486 0.0 0.0 0.0
2000 8753 0.0 0.0 0.0
2001 8707 0.0 0.0 0.0
2002 1601 0.0 0.0 0.0

For data sources see[5]

References