X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146061913002

Well Details

Well ID: 1146061913002
Loading map...
Location: 00/13-19-114-06W6/2
Location Alias: 00/13-19-14-06 W6M
Location Alias 2: 00/13-19-114-06 W6/02
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 19
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 13-19-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0034839
License Date: 1968-09-19
License Status: Abandoned
Spud Date: 1969-03-15
Final Drill Date: 1969-07-30
Well Total Depth: 1635.60 m
Surface Hole Latitude: 58.920539
Surface Hole Longitude: -119.004958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-09-19 Obtained License
1969-03-15 Direction Drilling Operation Performed - 98
1969-07-26 Drill Stem Test Performed
1969-07-30 Finished Drilling
1969-07-30 Well Log Performed
1969-07-30 Well Mode changed to Drilled and Cased
1969-08-03 Drill Stem Test Performed
1969-08-04 Drill Stem Test Performed
1969-08-05 Drill Stem Test Performed
1969-08-06 Drill Stem Test Performed
1969-08-07 Liner Casing Operation Performed
1969-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-08-15 Perforation Treatment Performed - Jet Perforation
1969-08-15 Well Began Production
1969-08-15 Well Fluid changed to Crude Oil
1969-08-15 Well Mode changed to Flowing
1970-01-20 Perforation Treatment Performed - Cement Squeeze
1970-01-21 Perforation Treatment Performed - Jet Perforation
1970-01-22 Perforation Treatment Performed - Acid Wash - No Pressure
1970-03-09 Perforation Treatment Performed - Cement Squeeze
1970-03-11 Perforation Treatment Performed - Jet Perforation
1970-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-06-18 Well Fluid changed to Crude Oil
1975-06-18 Well Mode changed to Suspended
2000-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-09 Perforation Treatment Performed - Cement Squeeze
2000-10-10 Perforation Treatment Performed - Jet Perforation
2000-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-30 Well Fluid changed to Crude Oil
2000-10-30 Well Mode changed to Flowing
2000-12-24 Well Fluid changed to Crude Oil
2000-12-24 Well Mode changed to Pumping
2010-01-27 Well Fluid changed to Crude Oil
2010-01-27 Well Mode changed to Suspended
2011-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-24 Plug Back Performed
2011-05-24 Well Fluid changed to Crude Oil
2011-05-24 Well Log Performed
2011-05-24 Well Mode changed to Abandoned Zone
2011-05-26 Perforation Treatment Performed - Jet Perforation
2011-05-26 Well Log Performed
2011-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-27 Perforation Treatment Performed - Jet Perforation
2011-05-27 Perforation Treatment Performed - Remedial Casing
2011-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-28 Perforation Treatment Performed - Remedial Casing
2011-07-26 Well Log Performed
2011-07-27 Perforation Treatment Performed - Jet Perforation
2011-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-29 Perforation Treatment Performed - Remedial Casing
2011-07-29 Well Abandoned
2011-07-29 Well Fluid changed to Crude Oil
2011-07-29 Well Mode changed to Abandoned
2011-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1969-03-15 912.60 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-08-07 Packing Device Capped w/Cement 1580.40 1580.40 0
2000-10-09 Acid Treatment 1550.20 1551.40 0
2000-10-09 Cement Squeeze 1550.20 1551.40 0
2000-10-10 Perforation 1525.50 1527.00 13
2000-10-10 Perforation 1528.90 1531.90 13
2000-10-10 Perforation 1537.40 1539.40 13
2000-10-11 Acid Treatment 1525.50 1539.40 0
2011-05-24 Packing Device Capped w/Cement 1439.00 1548.00 0
2011-05-26 Perforation 1232.00 1233.00 17
2011-05-27 Remedial Casing Cementing 1232.00 1233.00 0
2011-05-27 Packing Device Capped w/Cement 1210.00 1220.00 0
1969-08-15 Perforation 1555.70 1558.70 7
2011-05-27 Perforation 702.00 703.00 17
2011-05-28 Remedial Casing Cementing 702.00 703.00 0
2011-05-28 Packing Device Capped w/Cement 682.00 691.50 0
2011-07-27 Perforation 353.00 354.00 99
2011-07-28 Acid Treatment 353.00 354.00 0
2011-07-29 Remedial Casing Cementing 353.00 354.00 0
2011-07-30 Packing Device Capped w/Cement 339.00 347.00 0
1969-08-15 Acid Treatment 1555.70 1558.70 0
1970-01-20 Cement Squeeze 1555.70 1558.70 0
1970-01-21 Perforation 1555.10 1556.90 7
1970-01-22 Acid Wash 1555.10 1556.90 0
1970-03-09 Cement Squeeze 1555.10 1556.90 0
1970-03-11 Perforation 1550.20 1551.40 7
1970-03-17 Acid Treatment 1550.20 1551.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1438 0.0 0.0 0.0
1970 5882 0.0 0.0 0.0
1971 1572 0.0 0.0 0.0
1972 4935 0.0 0.0 0.0
1973 7405 0.0 0.0 0.0
1974 528 0.0 0.0 0.0
2000 918 0.0 0.0 0.0
2001 7857 0.0 0.0 0.0
2002 4740 0.0 0.0 0.0
2003 8164 0.0 0.0 0.0
2004 2140 0.0 0.0 0.0

For data sources see[6]

References