X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146062315003

Well Details

Well ID: 1146062315003
Loading map...
Location: 00/15-23-114-06W6/3
Location Alias: 00/15-23-14-06 W6M
Location Alias 2: 00/15-23-114-06 W6/03
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 23
County/Municipality: Mackenzie County
Well Name: ACL HZ VIRGO 15-23-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0034700
License Date: 1968-08-27
License Status: Abandoned
Spud Date: 1968-08-29
Final Drill Date: 1968-09-12
Well Total Depth: 1620.00 m
Surface Hole Latitude: 58.920378
Surface Hole Longitude: -118.887545

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-27 Obtained License
1968-08-29 Direction Drilling Operation Performed - 98
1968-09-10 Drill Stem Test Performed
1968-09-12 Finished Drilling
1968-09-12 Well Mode changed to Drilled and Cased
1968-09-17 Liner Casing Operation Performed
1968-09-25 Well Log Performed
1968-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-26 Perforation Treatment Performed - Jet Perforation
1980-07-30 Perforation Treatment Performed - Jet Perforation
1980-09-05 Perforation Treatment Performed - Cement Squeeze
1980-09-06 Perforation Treatment Performed - Jet Perforation
1981-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-06 Well Log Performed
1987-06-17 Perforation Treatment Performed - Cement Squeeze
1987-06-17 Plug Back Performed
1987-07-01 Perforation Treatment Performed - Cement Squeeze
1987-07-14 Perforation Treatment Performed - Open-Hole Completion
1987-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-17 Perforation Treatment Performed - Jet Perforation
1987-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-27 Well Log Performed
1995-10-28 Perforation Treatment Performed - Jet Perforation
1995-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-31 Well Log Performed
1995-11-02 Perforation Treatment Performed - Cement Squeeze
1995-11-03 Well Log Performed
1995-11-06 Well Log Performed
1995-11-07 Perforation Treatment Performed - Jet Perforation
1995-11-08 Perforation Treatment Performed - Cement Squeeze
1995-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-04 Well Log Performed
1996-08-06 Perforation Treatment Performed - Jet Perforation
1996-08-07 Perforation Treatment Performed - Remedial Casing
1998-02-22 Well Log Performed
1998-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-23 Plug Back Performed
1998-02-23 Well Log Performed
1998-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-24 Perforation Treatment Performed - Jet Perforation
1998-02-27 Perforation Treatment Performed - Remedial Casing
1998-04-19 Well Began Production
1998-04-19 Well Fluid changed to Gas
1998-04-19 Well Mode changed to Flowing
1999-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-03 Plug Back Performed
1999-10-03 Well Log Performed
1999-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-04 Perforation Treatment Performed - Jet Perforation
1999-10-27 Well Fluid changed to Gas
1999-10-27 Well Mode changed to Flowing
1999-10-28 Well Fluid changed to Gas
1999-10-28 Well Mode changed to Abandoned Zone
2001-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-28 Perforation Treatment Performed - Cement Squeeze
2001-02-28 Plug Back Performed
2006-06-30 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-08-29 1502.70 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-26 Perforation 1478.30 1480.10 10
1987-06-17 Cement Squeeze 1464.30 1471.60 0
1987-07-01 Cement Squeeze 1485.60 1497.80 0
1987-07-14 Open Hole/Barefoot Completion 1551.40 1620.00 0
1987-07-15 Acid Treatment 1551.40 1620.00 0
1987-07-17 Perforation 1475.00 1477.00 13
1987-07-19 Acid Treatment 1475.00 1477.00 0
1994-04-10 Acid Treatment 1475.00 1477.00 0
1995-01-10 Acid Treatment 1475.00 1477.00 0
1995-10-28 Perforation 1441.70 1442.90 13
1995-10-28 Perforation 1451.50 1452.70 13
1968-09-26 Acid Treatment 1478.30 1480.10 0
1995-10-28 Perforation 1464.30 1465.80 13
1995-10-28 Perforation 1467.30 1469.70 13
1995-10-31 Acid Treatment 1441.70 1477.00 0
1995-11-02 Cement Squeeze 1475.00 1477.00 0
1995-11-07 Perforation 1468.50 1468.80 13
1995-11-08 Cement Squeeze 1467.30 1469.70 0
1995-11-10 Acid Treatment 1441.70 1465.80 0
1996-08-06 Perforation 340.00 341.00 13
1996-08-07 Remedial Casing Cementing 340.00 341.00 0
1998-02-23 Packing Device Capped w/Cement 1427.00 1435.00 0
1980-07-30 Perforation 1485.60 1491.00 13
1998-02-24 Perforation 1358.80 1363.10 13
1998-02-24 Perforation 1367.30 1368.60 13
1998-02-24 Perforation 1371.00 1375.90 13
1998-02-24 Acid Treatment 1358.80 1375.90 0
1998-02-27 Remedial Casing Cementing 340.00 341.00 0
1999-10-03 Packing Device Capped w/Cement 1347.00 1355.00 0
1999-10-04 Perforation 1284.50 1287.00 13
1999-10-04 Perforation 1288.50 1289.50 13
1999-10-04 Perforation 1290.50 1294.50 13
1999-10-04 Acid Treatment 1284.50 1294.50 0
1980-07-30 Perforation 1494.70 1497.80 13
2001-02-28 Cement Squeeze 1284.50 1294.50 0
2001-02-28 Packing Device Capped w/Cement 1269.00 1275.00 0
1980-09-05 Cement Squeeze 1478.30 1480.10 0
1980-09-06 Perforation 1464.30 1466.70 13
1980-09-06 Perforation 1467.90 1471.60 13
1981-01-16 Acid Treatment 1464.30 1471.60 0
1983-06-22 Acid Treatment 1464.30 1471.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 5824 0.0 0.0 0.0
1999 1097 0.0 0.0 0.0

For data sources see[6]

References