X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146062514000

Well Details

Well ID: 1146062514000
Loading map...
Location: 00/14-25-114-06W6/0
Location Alias: 00/14-25-14-06 W6M
Location Alias 2: 00/14-25-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 25
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 14-25-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0034524
License Date: 1968-07-24
License Status: Abandoned
Spud Date: 1968-08-07
Final Drill Date: 1968-08-23
Well Total Depth: 1584.40 m
Surface Hole Latitude: 58.934911
Surface Hole Longitude: -118.861832

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-24 Obtained License
1968-08-17 Drill Stem Test Performed
1968-08-23 Finished Drilling
1968-08-23 Well Mode changed to Drilled and Cased
1968-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-08-26 Liner Casing Operation Performed
1968-08-28 Perforation Treatment Performed - Jet Perforation
1968-08-28 Well Log Performed
1968-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-29 Well Began Production
1968-08-29 Well Fluid changed to Crude Oil
1968-08-29 Well Mode changed to Flowing
1978-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-23 Perforation Treatment Performed - Cement Squeeze
1980-03-24 Perforation Treatment Performed - Jet Perforation
1980-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-09 Perforation Treatment Performed - Cement Squeeze
1985-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-10 Perforation Treatment Performed - Jet Perforation
1988-10-20 Well Fluid changed to Crude Oil
1988-10-20 Well Mode changed to Pumping
1995-09-22 Perforation Treatment Performed - Cement Squeeze
1995-09-22 Plug Back Performed
1995-09-27 Perforation Treatment Performed - Jet Perforation
1995-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-30 Perforation Treatment Performed - Jet Perforation
1995-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-06 Plug Back Performed
1998-11-06 Well Fluid changed to Crude Oil
1998-11-06 Well Log Performed
1998-11-06 Well Mode changed to Abandoned Zone
1998-11-07 Perforation Treatment Performed - Jet Perforation
1998-11-07 Well Log Performed
1998-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-27 Well Log Performed
2011-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-28 Perforation Treatment Performed - Jet Perforation
2011-02-28 Plug Back Performed
2011-02-28 Well Log Performed
2011-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-01 Perforation Treatment Performed - Jet Perforation
2011-03-01 Perforation Treatment Performed - Remedial Casing
2011-03-01 Well Log Performed
2011-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-02 Perforation Treatment Performed - Remedial Casing
2011-03-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-24 Packing Device Capped w/Cement 1553.90 1553.90 0
1985-12-10 Perforation 1471.50 1473.50 13
1985-12-10 Acid Treatment 1471.50 1473.50 0
1995-09-22 Cement Squeeze 1471.50 1473.50 0
1995-09-27 Perforation 1518.00 1524.00 13
1995-09-28 Acid Treatment 1518.00 1524.00 0
1995-09-30 Perforation 1471.00 1473.00 13
1995-09-30 Perforation 1462.40 1466.10 13
1995-10-01 Acid Treatment 1462.40 1473.00 0
1998-11-06 Packing Device Capped w/Cement 1453.00 1461.00 0
1998-11-07 Perforation 1283.00 1289.00 13
1968-08-28 Perforation 1485.30 1487.10 7
1998-11-08 Acid Treatment 1283.00 1289.00 0
2011-02-25 Packing Device Capped w/Cement 1442.00 1450.00 0
2011-02-26 Packing Device Capped w/Cement 1386.50 1394.50 0
2011-02-28 Packing Device Capped w/Cement 1269.00 1277.00 0
2011-02-28 Perforation 664.00 665.00 17
2011-03-01 Packing Device Capped w/Cement 653.00 661.00 0
2011-03-01 Perforation 314.00 315.00 17
2011-03-01 Remedial Casing Cementing 664.00 665.00 0
2011-03-02 Remedial Casing Cementing 314.00 315.00 0
2011-03-02 Packing Device Capped w/Cement 301.80 309.80 0
1968-08-28 Perforation 1494.10 1496.00 7
1968-08-29 Acid Treatment 1485.30 1496.00 0
1978-04-03 Acid Treatment 1485.30 1496.00 0
1980-03-23 Cement Squeeze 1485.30 1496.00 0
1980-03-24 Perforation 1475.80 1480.00 10
1980-10-06 Acid Treatment 1475.80 1480.00 0
1985-12-09 Cement Squeeze 1475.80 1480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1211 0.0 0.0 0.0
1969 3138 0.0 0.0 0.0
1970 2128 0.0 0.0 0.0
1971 3434 0.0 0.0 0.0
1972 3756 0.0 0.0 0.0
1973 6532 0.0 0.0 0.0
1974 6320 0.0 0.0 0.0
1975 6379 0.0 0.0 0.0
1976 6636 0.0 0.0 0.0
1977 8110 0.0 0.0 0.0
1978 4631 0.0 0.0 0.0
1979 3096 0.0 0.0 0.0
1980 4081 0.0 0.0 0.0
1981 2608 0.0 0.0 0.0
1982 3900 0.0 0.0 0.0
1983 6214 0.0 0.0 0.0
1984 7539 0.0 0.0 0.0
1985 6842 0.0 0.0 0.0
1986 6243 0.0 0.0 0.0
1987 7383 0.0 0.0 0.0
1988 8482 0.0 0.0 0.0
1989 8448 0.0 0.0 0.0
1990 8318 0.0 0.0 0.0
1991 8160 0.0 0.0 0.0
1992 7741 0.0 0.0 0.0
1993 7698 0.0 0.0 0.0
1994 8285 0.0 0.0 0.0
1995 8002 0.0 0.0 0.0
1996 1477 0.0 0.0 0.0

For data sources see[5]

References