X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146062612000

Well Details

Well ID: 1146062612000
Loading map...
Location: 00/12-26-114-06W6/0
Location Alias: 00/12-26-14-06 W6M
Location Alias 2: 00/12-26-114-06 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 26
County/Municipality: Mackenzie County
Well Name: ACL HZ VIRGO 13-26-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0037353
License Date: 2001-07-20
License Status: Abandoned
Spud Date: 1969-12-20
Final Drill Date: 1970-01-12
Well Total Depth: 1576.70 m
Surface Hole Latitude: 58.931450
Surface Hole Longitude: -118.895108

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-02 Drill Stem Test Performed
1970-01-08 Drill Stem Test Performed
1970-01-10 Well Log Performed
1970-01-12 Finished Drilling
1970-01-12 Well Log Performed
1970-01-12 Well Mode changed to Drilled and Cased
1970-01-15 Liner Casing Operation Performed
1970-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-31 Perforation Treatment Performed - Jet Perforation
1970-02-02 Well Began Production
1970-02-02 Well Fluid changed to Crude Oil
1970-02-02 Well Mode changed to Flowing
1985-06-13 Perforation Treatment Performed - Cement Squeeze
1985-06-14 Perforation Treatment Performed - Jet Perforation
1988-12-28 Well Fluid changed to Crude Oil
1988-12-28 Well Mode changed to Suspended
1993-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-20 Perforation Treatment Performed - Cement Squeeze
1993-02-24 Perforation Treatment Performed - Jet Perforation
1993-02-25 Well Log Performed
1993-02-26 Perforation Treatment Performed - Jet Perforation
1993-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-28 Well Log Performed
1993-05-01 Well Began Injection
1993-05-01 Well Fluid changed to Water
1993-05-01 Well Type changed to Disposal
1994-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-11 Perforation Treatment Performed - Jet Perforation
1994-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-21 Well Fluid changed to Crude Oil
1994-12-21 Well Mode changed to Pumping
1998-01-26 Well Fluid changed to Crude Oil
1998-01-26 Well Mode changed to Abandoned Zone
1998-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-30 Perforation Treatment Performed - Jet Perforation
1998-01-30 Plug Back Performed
1998-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-04 Perforation Treatment Performed - Jet Perforation
1998-02-04 Well Log Performed
2001-07-20 Obtained License
2001-07-28 Perforation Treatment Performed - Cement Squeeze
2001-07-28 Plug Back Performed
2001-07-28 Well Log Performed
2001-07-29 Well Log Performed
2001-11-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-31 Perforation 1490.50 1499.60 7
1994-04-09 Acid Treatment 1539.20 1554.50 0
1994-10-10 Packing Device Capped w/Cement 1505.00 1515.00 0
1994-10-11 Perforation 1482.50 1485.50 13
1994-10-18 Acid Treatment 1482.50 1485.50 0
1994-10-20 Acid Treatment 1482.50 1485.50 0
1998-01-30 Packing Device Capped w/Cement 1467.00 1475.00 0
1998-01-30 Perforation 1287.80 1290.00 13
1998-01-30 Acid Treatment 1287.80 1290.00 0
1998-02-04 Perforation 1290.80 1292.40 13
1998-02-04 Acid Treatment 1290.80 1292.40 0
1970-01-31 Acid Treatment 1490.50 1499.60 0
2001-07-28 Cement Squeeze 1287.80 1292.40 0
1985-06-13 Cement Squeeze 1490.50 1499.60 0
1985-06-14 Perforation 1482.50 1485.60 7
1993-02-19 Acid Treatment 1482.50 1485.60 0
1993-02-20 Cement Squeeze 1482.50 1485.60 0
1993-02-24 Perforation 1545.50 1554.50 13
1993-02-26 Perforation 1539.20 1545.50 13
1993-02-27 Acid Treatment 1539.20 1554.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 4880 0.0 0.0 0.0
1971 6906 0.0 0.0 0.0
1972 7213 0.0 0.0 0.0
1973 7098 0.0 0.0 0.0
1974 7482 0.0 0.0 0.0
1975 7456 0.0 0.0 0.0
1976 6256 0.0 0.0 0.0
1977 6365 0.0 0.0 0.0
1978 7112 0.0 0.0 0.0
1979 7855 0.0 0.0 0.0
1980 6831 0.0 0.0 0.0
1981 4375 0.0 0.0 0.0
1982 7207 0.0 0.0 0.0
1983 8067 0.0 0.0 0.0
1984 7744 0.0 0.0 0.0
1985 4800 0.0 0.0 0.0
1986 7835 0.0 0.0 0.0
1987 5388 0.0 0.0 0.0
1988 1792 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 336 0.0 0.0 0.0
1995 8405 0.0 0.0 0.0
1996 5281 0.0 0.0 0.0
1997 691 0.0 0.0 0.0

For data sources see[5]

References