If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146062910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.928892,"lon":-118.966032,"icon":""}]} |
| Location: 00/10-29-114-06W6/2 | |
| Location Alias: 00/10-29-14-06 W6M | |
| Location Alias 2: 00/10-29-114-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 29 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 10-29-114-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0035333 | |
| License Date: 1968-12-02 | |
| License Status: Abandoned | |
| Spud Date: 1968-12-09 | |
| Final Drill Date: 1968-12-31 | |
| Well Total Depth: 1577.30 m | |
| Surface Hole Latitude: 58.928892 | |
| Surface Hole Longitude: -118.966032 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1968-12-02 | Obtained License |
| 1968-12-31 | Finished Drilling |
| 1968-12-31 | Well Mode changed to Drilled and Cased |
| 1969-01-03 | Drill Stem Test Performed |
| 1969-01-05 | Liner Casing Operation Performed |
| 1969-01-29 | Perforation Treatment Performed - Jet Perforation |
| 1969-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-05-20 | Perforation Treatment Performed - Cement Squeeze |
| 1980-05-21 | Perforation Treatment Performed - Jet Perforation |
| 1982-01-13 | Perforation Treatment Performed - Cement Squeeze |
| 1982-01-13 | Well Log Performed |
| 1982-01-14 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-02 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-03 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-01-04 | Well Log Performed |
| 1998-01-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-01-06 | Plug Back Performed |
| 1998-01-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-01-07 | Perforation Treatment Performed - Jet Perforation |
| 1998-01-07 | Well Log Performed |
| 1998-01-11 | Well Log Performed |
| 1998-12-20 | Well Began Production |
| 1998-12-20 | Well Fluid changed to Gas |
| 1998-12-20 | Well Mode changed to Flowing |
| 1999-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-03-18 | Perforation Treatment Performed - Jet Perforation |
| 1999-03-18 | Plug Back Performed |
| 1999-03-18 | Well Fluid changed to Gas |
| 1999-03-18 | Well Log Performed |
| 1999-03-18 | Well Mode changed to Abandoned Zone |
| 1999-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-03-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 2007-03-19 | Well Log Performed |
| 2007-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-03-20 | Plug Back Performed |
| 2007-03-20 | Well Log Performed |
| 2007-03-22 | Perforation Treatment Performed - Jet Perforation |
| 2007-03-22 | Perforation Treatment Performed - Remedial Casing |
| 2007-03-24 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-01-29 | Perforation | 1551.70 | 1553.90 | 7 |
| 1998-01-06 | Packing Device Capped w/Cement | 1485.00 | 1493.00 | 0 |
| 1998-01-07 | Perforation | 1384.70 | 1388.40 | 13 |
| 1998-01-07 | Perforation | 1395.10 | 1397.20 | 13 |
| 1998-01-07 | Perforation | 1402.10 | 1403.30 | 13 |
| 1998-01-07 | Perforation | 1408.20 | 1410.00 | 13 |
| 1998-01-07 | Acid Treatment | 1384.70 | 1410.00 | 0 |
| 1999-03-18 | Packing Device Capped w/Cement | 1372.00 | 1380.00 | 0 |
| 1999-03-18 | Perforation | 1310.00 | 1314.30 | 13 |
| 1999-03-19 | Acid Wash | 1310.00 | 1314.30 | 0 |
| 1999-03-19 | Acid Treatment | 1310.00 | 1314.30 | 0 |
| 1969-01-30 | Acid Treatment | 1551.70 | 1553.90 | 0 |
| 2007-03-20 | Packing Device Capped w/Cement | 1288.00 | 1297.00 | 0 |
| 2007-03-22 | Perforation | 1115.00 | 1116.00 | 14 |
| 2007-03-22 | Remedial Casing Cementing | 1115.00 | 1116.00 | 0 |
| 1980-05-20 | Cement Squeeze | 1551.70 | 1553.90 | 0 |
| 1980-05-21 | Perforation | 1544.70 | 1547.20 | 7 |
| 1982-01-13 | Cement Squeeze | 1544.70 | 1547.20 | 0 |
| 1982-01-14 | Perforation | 1531.90 | 1536.20 | 13 |
| 1995-03-02 | Cement Squeeze | 1531.90 | 1536.20 | 0 |
| 1995-03-03 | Perforation | 1505.50 | 1509.00 | 13 |
| 1995-03-04 | Acid Treatment | 1505.50 | 1509.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1998 | 254 | 0.0 | 0.0 | 0.0 |
| 1999 | 143 | 0.0 | 0.0 | 0.0 |
For data sources see[5]