X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146063202002

Well Details

Well ID: 1146063202002
Loading map...
Location: 00/02-32-114-06W6/2
Location Alias: 00/02-32-14-06 W6M
Location Alias 2: 00/02-32-114-06 W6/02
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 32
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 2-32-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0034684
License Date: 1968-08-23
License Status: Abandoned
Spud Date: 1968-08-26
Final Drill Date: 1968-09-16
Well Total Depth: 1612.40 m
Surface Hole Latitude: 58.938016
Surface Hole Longitude: -118.965944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-23 Obtained License
1968-09-07 Drill Stem Test Performed
1968-09-16 Finished Drilling
1968-09-18 Drill Stem Test Performed
1968-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-09-20 Drill Stem Test Performed
1968-09-21 Intermediate Casing Operation Performed
1968-09-24 Liner Casing Operation Performed
1968-09-30 Perforation Treatment Performed - Jet Perforation
1968-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-08 Perforation Treatment Performed - Cement Squeeze
1969-09-10 Perforation Treatment Performed - Jet Perforation
1970-01-08 Well Log Performed
1970-01-09 Perforation Treatment Performed - Jet Perforation
1970-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-03 Perforation Treatment Performed - Cement Squeeze
1973-07-05 Perforation Treatment Performed - Jet Perforation
1977-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-21 Perforation Treatment Performed - Jet Perforation
1978-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-11 Well Mode changed to Drilled and Cased
1981-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-25 Perforation Treatment Performed - Jet Perforation
1994-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-06 Well Log Performed
1994-06-14 Perforation Treatment Performed - Cement Squeeze
1994-06-14 Well Mode changed to Abandoned Zone
1994-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-07 Plug Back Performed
1997-08-07 Well Log Performed
1997-08-08 Perforation Treatment Performed - Jet Perforation
1997-08-08 Well Log Performed
1997-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-31 Well Log Performed
2007-11-01 Well Log Performed
2007-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-02 Plug Back Performed
2007-11-02 Well Log Performed
2007-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-03 Perforation Treatment Performed - Jet Perforation
2007-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-04 Perforation Treatment Performed - Remedial Casing
2007-11-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-19 Packing Device Capped w/Cement 1594.70 1594.70 0
1977-11-21 Perforation 1407.30 1409.10 13
1977-11-21 Acid Treatment 1407.30 1409.10 0
1978-06-28 Acid Treatment 1407.30 1409.10 0
1981-01-25 Perforation 1511.80 1517.30 7
1981-01-25 Acid Treatment 1511.80 1517.30 0
1994-06-06 Packing Device Capped w/Cement 1522.60 1526.00 0
1994-06-14 Cement Squeeze 1407.30 1409.10 0
1994-08-31 Acid Treatment 1511.80 1517.30 0
1997-08-07 Packing Device Capped w/Cement 1500.00 1508.00 0
1997-08-07 Packing Device Capped w/Cement 1395.00 1403.00 0
1968-09-30 Perforation 1549.60 1551.10 10
1997-08-08 Perforation 1313.60 1318.00 13
1997-08-09 Acid Treatment 1313.60 1318.00 0
2007-11-02 Packing Device Capped w/Cement 1292.00 1300.00 0
2007-11-03 Perforation 701.20 702.00 14
2007-11-03 Packing Device Capped w/Cement 687.00 695.00 0
2007-11-03 Perforation 302.00 303.00 14
2007-11-04 Remedial Casing Cementing 302.00 303.00 0
2007-11-04 Packing Device Capped w/Cement 279.70 294.70 0
1968-10-01 Acid Treatment 1549.60 1551.10 0
1969-09-08 Cement Squeeze 1549.60 1551.10 0
1969-09-10 Perforation 1543.80 1545.30 7
1970-01-09 Perforation 1543.20 1544.40 7
1970-01-10 Acid Treatment 1543.20 1544.40 0
1973-07-03 Cement Squeeze 1543.20 1545.30 0
1973-07-05 Perforation 1533.10 1535.60 7

For data sources see[4]



References