If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146063303002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.936893,"lon":-118.948521,"icon":""}]} |
| Location: 00/03-33-114-06W6/2 | |
| Location Alias: 00/03-33-14-06 W6M | |
| Location Alias 2: 00/03-33-114-06 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 33 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 3-33-114-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0036250 | |
| License Date: 1969-05-27 | |
| License Status: Abandoned | |
| Spud Date: 1969-06-11 | |
| Final Drill Date: 1969-07-03 | |
| Well Total Depth: 1572.80 m | |
| Surface Hole Latitude: 58.936893 | |
| Surface Hole Longitude: -118.948521 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1969-05-27 | Obtained License |
| 1969-06-23 | Drill Stem Test Performed |
| 1969-06-24 | Drill Stem Test Performed |
| 1969-06-25 | Well Log Performed |
| 1969-06-30 | Drill Stem Test Performed |
| 1969-07-02 | Drill Stem Test Performed |
| 1969-07-03 | Finished Drilling |
| 1969-07-03 | Well Log Performed |
| 1969-07-03 | Well Mode changed to Drilled and Cased |
| 1969-07-04 | Liner Casing Operation Performed |
| 1969-08-08 | Perforation Treatment Performed - Jet Perforation |
| 1984-10-23 | Perforation Treatment Performed - Cement Squeeze |
| 1984-10-24 | Perforation Treatment Performed - Jet Perforation |
| 1984-10-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-03 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-04 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-05 | Well Log Performed |
| 1996-02-07 | Perforation Treatment Performed - Cement Squeeze |
| 1996-02-07 | Plug Back Performed |
| 1996-02-07 | Well Log Performed |
| 1996-02-08 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1996-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-01-24 | Well Log Performed |
| 1998-01-25 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 1998-01-25 | Plug Back Performed |
| 1998-01-26 | Well Log Performed |
| 1998-01-27 | Perforation Treatment Performed - Jet Perforation |
| 1998-01-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-03-01 | Well Began Production |
| 1998-03-01 | Well Fluid changed to Gas |
| 1998-03-01 | Well Mode changed to Flowing |
| 1998-07-24 | Well Log Performed |
| 1998-07-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1998-07-26 | Plug Back Performed |
| 1998-07-26 | Well Fluid changed to Gas |
| 1998-07-26 | Well Mode changed to Abandoned Zone |
| 1998-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-05 | Well Log Performed |
| 2011-07-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-06 | Plug Back Performed |
| 2011-07-06 | Well Log Performed |
| 2011-07-07 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-08 | Well Log Performed |
| 2011-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-09 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-10 | Perforation Treatment Performed - Remedial Casing |
| 2011-07-10 | Well Log Performed |
| 2011-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-11 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-11 | Well Log Performed |
| 2011-07-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-12 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-12 | Perforation Treatment Performed - Remedial Casing |
| 2011-07-12 | Well Log Performed |
| 2011-07-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-13 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-15 | Perforation Treatment Performed - Remedial Casing |
| 2011-07-18 | Well Log Performed |
| 2011-07-19 | Well Log Performed |
| 2011-07-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-20 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
| 2011-07-20 | Perforation Treatment Performed - Remedial Casing |
| 2011-07-23 | Well Log Performed |
| 2011-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-07-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-24 | Well Log Performed |
| 2011-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2011-07-25 | Perforation Treatment Performed - Remedial Casing |
| 2012-02-16 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1969-08-08 | Perforation | 1540.80 | 1545.30 | 13 |
| 1996-02-08 | Perforation | 1496.50 | 1500.80 | 13 |
| 1996-02-08 | Perforation | 1488.70 | 1490.50 | 13 |
| 1996-02-08 | Perforation | 1479.50 | 1481.30 | 13 |
| 1996-02-09 | Perforation | 1505.70 | 1508.20 | 13 |
| 1996-02-10 | Acid Treatment | 1496.50 | 1508.20 | 0 |
| 1998-01-25 | Packing Dev Cpd w/Res-Gyp Cem | 1464.00 | 1472.00 | 0 |
| 1998-01-27 | Perforation | 1385.00 | 1385.60 | 18 |
| 1998-01-27 | Perforation | 1389.90 | 1392.30 | 18 |
| 1998-01-27 | Perforation | 1398.40 | 1401.50 | 18 |
| 1998-01-29 | Acid Treatment | 1385.00 | 1508.20 | 0 |
| 1984-10-23 | Cement Squeeze | 1540.80 | 1545.30 | 0 |
| 1998-07-26 | Packing Device Capped w/Cement | 1346.00 | 1354.00 | 0 |
| 1998-07-26 | Perforation | 1307.90 | 1311.90 | 13 |
| 1998-07-26 | Perforation | 1313.10 | 1313.70 | 13 |
| 1998-07-26 | Perforation | 1314.90 | 1315.50 | 13 |
| 1998-07-27 | Acid Treatment | 1307.90 | 1315.50 | 0 |
| 2011-07-06 | Packing Device Capped w/Cement | 1297.00 | 1305.00 | 0 |
| 2011-07-07 | Perforation | 1222.00 | 1223.00 | 13 |
| 2011-07-08 | Acid Treatment | 1222.00 | 1223.00 | 0 |
| 2011-07-09 | Packing Device Capped w/Cement | 1207.00 | 1215.00 | 0 |
| 2011-07-09 | Perforation | 692.00 | 693.00 | 17 |
| 1984-10-24 | Perforation | 1532.30 | 1534.10 | 15 |
| 2011-07-09 | Packing Device Capped w/Cement | 822.00 | 830.00 | 0 |
| 2011-07-10 | Packing Device Capped w/Cement | 670.00 | 680.00 | 0 |
| 2011-07-10 | Remedial Casing Cementing | 692.00 | 693.00 | 0 |
| 2011-07-11 | Perforation | 343.00 | 344.00 | 99 |
| 2011-07-11 | Acid Treatment | 343.00 | 344.00 | 0 |
| 2011-07-12 | Acid Treatment | 290.00 | 291.00 | 0 |
| 2011-07-12 | Perforation | 290.00 | 291.00 | 99 |
| 2011-07-12 | Remedial Casing Cementing | 343.00 | 344.00 | 0 |
| 2011-07-12 | Packing Device Capped w/Cement | 328.00 | 338.00 | 0 |
| 2011-07-13 | Packing Device Capped w/Cement | 279.00 | 287.00 | 0 |
| 1984-10-27 | Acid Treatment | 1532.30 | 1534.10 | 0 |
| 2011-07-13 | Acid Treatment | 271.00 | 272.00 | 0 |
| 2011-07-13 | Perforation | 271.00 | 272.00 | 17 |
| 2011-07-15 | Packing Device Capped w/Cement | 256.00 | 265.00 | 0 |
| 2011-07-15 | Remedial Casing Cementing | 271.00 | 272.00 | 0 |
| 2011-07-20 | Perforation | 250.00 | 251.00 | 17 |
| 2011-07-20 | Packing Dev Cpd w/Res-Gyp Cem | 244.00 | 247.00 | 0 |
| 2011-07-20 | Remedial Casing Cementing | 250.00 | 251.00 | 0 |
| 2011-07-24 | Perforation | 240.80 | 241.80 | 99 |
| 2011-07-24 | Acid Treatment | 240.80 | 241.80 | 0 |
| 2011-07-25 | Remedial Casing Cementing | 240.80 | 241.80 | 0 |
| 1995-03-03 | Cement Squeeze | 1532.30 | 1534.10 | 0 |
| 2011-07-25 | Packing Device Capped w/Cement | 231.00 | 239.00 | 0 |
| 1995-03-04 | Perforation | 1521.60 | 1523.40 | 13 |
| 1995-03-04 | Perforation | 1526.60 | 1529.00 | 13 |
| 1995-03-04 | Perforation | 1530.00 | 1531.20 | 13 |
| 1996-02-07 | Cement Squeeze | 1521.60 | 1531.20 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1998 | 356 | 0.0 | 0.0 | 0.0 |
For data sources see[5]