X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146063303003

Well Details

Well ID: 1146063303003
Loading map...
Location: 00/03-33-114-06W6/3
Location Alias: 00/03-33-14-06 W6M
Location Alias 2: 00/03-33-114-06 W6/03
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 06
Section: 33
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 3-33-114-6
Operator Name: Paramount Resources Ltd.
License Number: 0036250
License Date: 1969-05-27
License Status: Abandoned
Spud Date: 1969-06-11
Final Drill Date: 1969-07-03
Well Total Depth: 1572.80 m
Surface Hole Latitude: 58.936893
Surface Hole Longitude: -118.948521

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-27 Obtained License
1969-06-23 Drill Stem Test Performed
1969-06-24 Drill Stem Test Performed
1969-06-25 Well Log Performed
1969-06-30 Drill Stem Test Performed
1969-07-02 Drill Stem Test Performed
1969-07-03 Finished Drilling
1969-07-03 Well Log Performed
1969-07-03 Well Mode changed to Drilled and Cased
1969-07-04 Liner Casing Operation Performed
1969-08-08 Perforation Treatment Performed - Jet Perforation
1984-10-23 Perforation Treatment Performed - Cement Squeeze
1984-10-24 Perforation Treatment Performed - Jet Perforation
1984-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-03 Perforation Treatment Performed - Cement Squeeze
1995-03-04 Perforation Treatment Performed - Jet Perforation
1996-02-05 Well Log Performed
1996-02-07 Perforation Treatment Performed - Cement Squeeze
1996-02-07 Plug Back Performed
1996-02-07 Well Log Performed
1996-02-08 Perforation Treatment Performed - Jet Perforation
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-24 Well Log Performed
1998-01-25 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
1998-01-25 Plug Back Performed
1998-01-26 Well Log Performed
1998-01-27 Perforation Treatment Performed - Jet Perforation
1998-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-24 Well Log Performed
1998-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-26 Perforation Treatment Performed - Jet Perforation
1998-07-26 Plug Back Performed
1998-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-12 Well Began Production
1998-08-12 Well Fluid changed to Gas
1998-08-12 Well Mode changed to Flowing
1998-08-13 Well Fluid changed to Gas
1998-08-13 Well Mode changed to Flowing
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Suspended
2011-07-05 Well Log Performed
2011-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-06 Plug Back Performed
2011-07-06 Well Fluid changed to Gas
2011-07-06 Well Log Performed
2011-07-06 Well Mode changed to Abandoned Zone
2011-07-07 Perforation Treatment Performed - Jet Perforation
2011-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-08 Well Log Performed
2011-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-09 Perforation Treatment Performed - Jet Perforation
2011-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-10 Perforation Treatment Performed - Remedial Casing
2011-07-10 Well Log Performed
2011-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-11 Perforation Treatment Performed - Jet Perforation
2011-07-11 Well Log Performed
2011-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-12 Perforation Treatment Performed - Jet Perforation
2011-07-12 Perforation Treatment Performed - Remedial Casing
2011-07-12 Well Log Performed
2011-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-13 Perforation Treatment Performed - Jet Perforation
2011-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-15 Perforation Treatment Performed - Remedial Casing
2011-07-18 Well Log Performed
2011-07-19 Well Log Performed
2011-07-20 Perforation Treatment Performed - Jet Perforation
2011-07-20 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-07-20 Perforation Treatment Performed - Remedial Casing
2011-07-23 Well Log Performed
2011-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-07-24 Perforation Treatment Performed - Jet Perforation
2011-07-24 Well Log Performed
2011-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-25 Perforation Treatment Performed - Remedial Casing
2012-02-16 Well Abandoned
2012-02-16 Well Fluid changed to Gas
2012-02-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-08-08 Perforation 1540.80 1545.30 13
1996-02-08 Perforation 1496.50 1500.80 13
1996-02-08 Perforation 1488.70 1490.50 13
1996-02-08 Perforation 1479.50 1481.30 13
1996-02-09 Perforation 1505.70 1508.20 13
1996-02-10 Acid Treatment 1496.50 1508.20 0
1998-01-25 Packing Dev Cpd w/Res-Gyp Cem 1464.00 1472.00 0
1998-01-27 Perforation 1385.00 1385.60 18
1998-01-27 Perforation 1389.90 1392.30 18
1998-01-27 Perforation 1398.40 1401.50 18
1998-01-29 Acid Treatment 1385.00 1508.20 0
1984-10-23 Cement Squeeze 1540.80 1545.30 0
1998-07-26 Packing Device Capped w/Cement 1346.00 1354.00 0
1998-07-26 Perforation 1307.90 1311.90 13
1998-07-26 Perforation 1313.10 1313.70 13
1998-07-26 Perforation 1314.90 1315.50 13
1998-07-27 Acid Treatment 1307.90 1315.50 0
2011-07-06 Packing Device Capped w/Cement 1297.00 1305.00 0
2011-07-07 Perforation 1222.00 1223.00 13
2011-07-08 Acid Treatment 1222.00 1223.00 0
2011-07-09 Packing Device Capped w/Cement 1207.00 1215.00 0
2011-07-09 Perforation 692.00 693.00 17
1984-10-24 Perforation 1532.30 1534.10 15
2011-07-09 Packing Device Capped w/Cement 822.00 830.00 0
2011-07-10 Packing Device Capped w/Cement 670.00 680.00 0
2011-07-10 Remedial Casing Cementing 692.00 693.00 0
2011-07-11 Perforation 343.00 344.00 99
2011-07-11 Acid Treatment 343.00 344.00 0
2011-07-12 Acid Treatment 290.00 291.00 0
2011-07-12 Perforation 290.00 291.00 99
2011-07-12 Remedial Casing Cementing 343.00 344.00 0
2011-07-12 Packing Device Capped w/Cement 328.00 338.00 0
2011-07-13 Packing Device Capped w/Cement 279.00 287.00 0
1984-10-27 Acid Treatment 1532.30 1534.10 0
2011-07-13 Acid Treatment 271.00 272.00 0
2011-07-13 Perforation 271.00 272.00 17
2011-07-15 Packing Device Capped w/Cement 256.00 265.00 0
2011-07-15 Remedial Casing Cementing 271.00 272.00 0
2011-07-20 Perforation 250.00 251.00 17
2011-07-20 Packing Dev Cpd w/Res-Gyp Cem 244.00 247.00 0
2011-07-20 Remedial Casing Cementing 250.00 251.00 0
2011-07-24 Perforation 240.80 241.80 99
2011-07-24 Acid Treatment 240.80 241.80 0
2011-07-25 Remedial Casing Cementing 240.80 241.80 0
1995-03-03 Cement Squeeze 1532.30 1534.10 0
2011-07-25 Packing Device Capped w/Cement 231.00 239.00 0
1995-03-04 Perforation 1521.60 1523.40 13
1995-03-04 Perforation 1526.60 1529.00 13
1995-03-04 Perforation 1530.00 1531.20 13
1996-02-07 Cement Squeeze 1521.60 1531.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2768 0.0 0.0 0.0
1999 7777 0.0 0.0 0.0
2000 2554 0.0 0.0 0.0

For data sources see[5]

References