If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146063309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.945591,"lon":-118.934706,"icon":""}]} |
| Location: 00/09-33-114-06W6/0 | |
| Location Alias: 00/09-33-14-06 W6M | |
| Location Alias 2: 00/09-33-114-06 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 06 | |
| Section: 33 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 9-33-114-6 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0034671 | |
| License Date: 1968-08-21 | |
| License Status: Suspension | |
| Spud Date: 1968-08-25 | |
| Final Drill Date: 1968-09-21 | |
| Well Total Depth: 1697.70 m | |
| Surface Hole Latitude: 58.945591 | |
| Surface Hole Longitude: -118.934706 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1968-08-21 | Obtained License |
| 1968-09-10 | Drill Stem Test Performed |
| 1968-09-15 | Drill Stem Test Performed |
| 1968-09-21 | Finished Drilling |
| 1968-09-21 | Well Mode changed to Drilled and Cased |
| 1968-09-23 | Drill Stem Test Performed |
| 1968-09-24 | Drill Stem Test Performed |
| 1968-09-25 | Drill Stem Test Performed |
| 1968-09-26 | Liner Casing Operation Performed |
| 1968-10-04 | Well Log Performed |
| 1968-10-07 | Perforation Treatment Performed - Jet Perforation |
| 1968-10-08 | Well Began Production |
| 1968-10-08 | Well Fluid changed to Crude Oil |
| 1968-10-08 | Well Mode changed to Flowing |
| 1971-12-12 | Perforation Treatment Performed - Cement Squeeze |
| 1971-12-29 | Perforation Treatment Performed - Open-Hole Completion |
| 1975-10-09 | Perforation Treatment Performed - Jet Perforation |
| 1975-12-03 | Well Fluid changed to Crude Oil |
| 1975-12-03 | Well Mode changed to Suspended |
| 1977-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1977-06-15 | Well Fluid changed to Crude Oil |
| 1977-06-15 | Well Mode changed to Abandoned Zone |
| 1977-06-17 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-31 | Well Fluid changed to Crude Oil |
| 1994-03-31 | Well Mode changed to Suspended |
| 1995-03-22 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-22 | Perforation Treatment Performed - Open-Hole Completion |
| 1995-03-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-25 | Perforation Treatment Performed - Cement Squeeze |
| 1995-03-31 | Perforation Treatment Performed - Jet Perforation |
| 1995-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-04-06 | Well Fluid changed to Crude Oil |
| 1995-04-06 | Well Mode changed to Flowing |
| 1999-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-10-16 | Well Fluid changed to Crude Oil |
| 1999-10-16 | Well Mode changed to Pumping |
| 2015-10-28 | Well Fluid changed to Crude Oil |
| 2015-10-28 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1968-10-07 | Perforation | 1535.90 | 1545.60 | 13 |
| 1995-03-22 | Open Hole/Barefoot Completion | 1611.20 | 1636.20 | 0 |
| 1995-03-25 | Acid Treatment | 1519.70 | 1636.20 | 0 |
| 1995-03-25 | Cement Squeeze | 1519.70 | 1636.20 | 0 |
| 1995-03-25 | Cement Squeeze | 1386.80 | 1388.70 | 0 |
| 1995-03-31 | Perforation | 1506.30 | 1507.50 | 13 |
| 1995-03-31 | Perforation | 1509.40 | 1511.80 | 13 |
| 1995-03-31 | Perforation | 1513.60 | 1514.80 | 13 |
| 1995-04-01 | Acid Treatment | 1506.30 | 1514.80 | 0 |
| 1999-10-13 | Acid Treatment | 1506.30 | 1514.80 | 0 |
| 1971-12-12 | Cement Squeeze | 1535.90 | 1545.60 | 0 |
| 1971-12-29 | Open Hole/Barefoot Completion | 1611.20 | 1636.20 | 0 |
| 1975-10-09 | Perforation | 1519.70 | 1521.30 | 7 |
| 1975-10-09 | Perforation | 1522.50 | 1524.00 | 7 |
| 1977-06-15 | Packing Device Capped w/Cement | 1508.80 | 1517.90 | 0 |
| 1977-06-17 | Perforation | 1386.80 | 1388.70 | 7 |
| 1995-03-22 | Perforation | 1519.70 | 1521.30 | 7 |
| 1995-03-22 | Perforation | 1522.50 | 1524.00 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1968 | 299 | 0.0 | 0.0 | 0.0 |
| 1969 | 7362 | 0.0 | 0.0 | 0.0 |
| 1970 | 7348 | 0.0 | 0.0 | 0.0 |
| 1971 | 7698 | 0.0 | 0.0 | 0.0 |
| 1972 | 0 | 0.0 | 0.0 | 0.0 |
| 1973 | 0 | 0.0 | 0.0 | 0.0 |
| 1974 | 0 | 0.0 | 0.0 | 0.0 |
| 1975 | 1092 | 0.0 | 0.0 | 0.0 |
| 1995 | 4245 | 0.0 | 0.0 | 0.0 |
| 1998 | 1125 | 0.0 | 0.0 | 0.0 |
| 1999 | 8238 | 0.0 | 0.0 | 0.0 |
| 2000 | 8707 | 0.0 | 0.0 | 0.0 |
| 2001 | 8725 | 0.0 | 0.0 | 0.0 |
| 2002 | 8735 | 0.0 | 0.0 | 0.0 |
| 2003 | 8637 | 0.0 | 0.0 | 0.0 |
| 2004 | 7429 | 0.0 | 0.0 | 0.0 |
| 2005 | 8343 | 0.0 | 0.0 | 0.0 |
| 2006 | 8675 | 0.0 | 0.0 | 0.0 |
| 2007 | 8487 | 0.0 | 0.0 | 0.0 |
| 2008 | 8630 | 0.0 | 0.0 | 0.0 |
| 2009 | 8264 | 0.0 | 0.0 | 0.0 |
| 2010 | 8191 | 0.0 | 0.0 | 0.0 |
| 2011 | 6316 | 0.0 | 0.0 | 0.0 |
| 2012 | 8315 | 0.0 | 0.0 | 0.0 |
| 2013 | 8070 | 0.0 | 0.0 | 0.0 |
| 2014 | 7088 | 0.0 | 0.0 | 0.0 |
For data sources see[5]