X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146073416002

Well Details

Well ID: 1146073416002
Loading map...
Location: 00/16-34-114-07W6/2
Location Alias: 00/16-34-14-07 W6M
Location Alias 2: 00/16-34-114-07 W6/02
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 07
Section: 34
County/Municipality: Mackenzie County
Well Name: ACL AMBER 16-34-114-7
Operator Name: Paramount Resources Ltd.
License Number: 0035037
License Date: 1968-10-23
License Status: Issued
Spud Date: 1968-11-05
Final Drill Date: 1968-12-23
Well Total Depth: 1645.90 m
Surface Hole Latitude: 58.950041
Surface Hole Longitude: -119.073289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-10-23 Obtained License
1968-11-05 Direction Drilling Operation Performed - 98
1968-12-18 Well Log Performed
1968-12-19 Drill Stem Test Performed
1968-12-20 Production Casing Operation Performed
1968-12-23 Finished Drilling
1968-12-23 Well Mode changed to Drilled and Cased
1968-12-29 Perforation Treatment Performed - Jet Perforation
1968-12-29 Well Log Performed
1968-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-31 Well Began Production
1968-12-31 Well Fluid changed to Crude Oil
1968-12-31 Well Mode changed to Flowing
1979-09-21 Well Fluid changed to Crude Oil
1979-09-21 Well Mode changed to Pumping
1985-03-01 Perforation Treatment Performed - Jet Perforation
1985-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-31 Well Fluid changed to Crude Oil
1985-05-31 Well Mode changed to Suspended
1991-02-22 Well Fluid changed to Crude Oil
1991-02-22 Well Mode changed to Pumping
1992-01-20 Well Log Performed
1992-01-22 Perforation Treatment Performed - Cement Squeeze
1992-01-26 Perforation Treatment Performed - Open-Hole Completion
1992-01-26 Well Log Performed
1992-01-28 Well Log Performed
1992-01-30 Well Log Performed
1992-01-31 Perforation Treatment Performed - Cement Squeeze
1992-01-31 Perforation Treatment Performed - Jet Perforation
1992-02-04 Well Log Performed
1992-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-05 Perforation Treatment Performed - Jet Perforation
1992-07-09 Well Log Performed
1992-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-11 Well Log Performed
1992-07-12 Perforation Treatment Performed - Jet Perforation
1992-07-17 Perforation Treatment Performed - Casing Patch (Over Perfs)
1992-07-17 Well Log Performed
1992-07-19 Well Log Performed
1992-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-20 Perforation Treatment Performed - Jet Perforation
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-21 Perforation Treatment Performed - Jet Perforation
1999-01-21 Plug Back Performed
1999-01-21 Well Log Performed
1999-01-22 Well Fluid changed to Crude Oil
1999-01-22 Well Mode changed to Abandoned Zone
1999-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-23 Perforation Treatment Performed - Acid Wash - No Pressure
2002-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-18 Perforation Treatment Performed - Jet Perforation
2002-02-18 Plug Back Performed
2002-02-18 Well Log Performed
2002-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-11-05 1029.90 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-29 Perforation 1584.40 1586.50 7
1992-02-05 Acid Treatment 1578.00 1580.20 0
1992-07-11 Acid Treatment 620.00 620.50 0
1992-07-12 Perforation 350.00 350.50 13
1992-07-17 Casing Patch 350.00 350.50 0
1992-07-20 Perforation 1573.30 1574.60 13
1992-07-20 Acid Treatment 1573.30 1574.60 0
1994-11-30 Perforation 1550.20 1554.50 13
1994-12-01 Acid Treatment 1550.20 1554.50 0
1999-01-21 Packing Device Capped w/Cement 1540.00 1548.00 0
1999-01-21 Perforation 1433.20 1435.60 13
1968-12-31 Acid Treatment 1584.40 1586.50 0
1999-01-21 Perforation 1438.00 1439.90 13
1999-01-23 Acid Wash 1433.20 1439.90 0
1999-01-23 Acid Treatment 1433.20 1439.90 0
2002-02-18 Packing Device Capped w/Cement 1416.40 1424.40 0
2002-02-18 Perforation 1346.60 1351.50 13
2002-02-19 Acid Treatment 1346.60 1351.50 0
1985-03-01 Perforation 1576.00 1578.50 13
1985-03-02 Acid Treatment 1576.00 1578.50 0
1992-01-22 Cement Squeeze 1584.40 1586.50 0
1992-01-26 Open Hole/Barefoot Completion 1594.10 1595.30 0
1992-01-31 Cement Squeeze 1576.00 1595.30 0
1992-01-31 Perforation 620.00 620.50 13
1992-02-05 Perforation 1578.00 1580.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 2668 0.0 0.0 0.0
1970 627 0.0 0.0 0.0
1971 1011 0.0 0.0 0.0
1972 1191 0.0 0.0 0.0
1973 2668 0.0 0.0 0.0
1974 1902 0.0 0.0 0.0
1975 2137 0.0 0.0 0.0
1976 2320 0.0 0.0 0.0
1977 2297 0.0 0.0 0.0
1978 2401 0.0 0.0 0.0
1979 2427 0.0 0.0 0.0
1980 5740 0.0 0.0 0.0
1981 4547 0.0 0.0 0.0
1982 6450 0.0 0.0 0.0
1983 7004 0.0 0.0 0.0
1984 3791 0.0 0.0 0.0
1991 5300 0.0 0.0 0.0
1992 5109 0.0 0.0 0.0
1993 6052 0.0 0.0 0.0
1994 5722 0.0 0.0 0.0
1995 5653 0.0 0.0 0.0
1996 526 0.0 0.0 0.0
1997 240 0.0 0.0 0.0

For data sources see[6]

References