X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146073601000

Well Details

Well ID: 1146073601000
Loading map...
Location: 00/01-36-114-07W6/0
Location Alias: 00/01-36-14-07 W6M
Location Alias 2: 00/01-36-114-07 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 07
Section: 36
County/Municipality: Mackenzie County
Well Name: PPRL AMBER 1-36-114-7
Operator Name: Paramount Resources Ltd.
License Number: 0034308
License Date: 1968-06-20
License Status: Abandoned
Spud Date: 1968-07-01
Final Drill Date: 1968-08-05
Well Total Depth: 1609.30 m
Surface Hole Latitude: 58.938492
Surface Hole Longitude: -119.020906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-20 Obtained License
1968-07-23 Well Log Performed
1968-07-24 Drill Stem Test Performed
1968-07-25 Drill Stem Test Performed
1968-07-27 Drill Stem Test Performed
1968-07-29 Drill Stem Test Performed
1968-07-30 Well Log Performed
1968-08-03 Well Log Performed
1968-08-04 Drill Stem Test Performed
1968-08-05 Finished Drilling
1968-08-05 Well Mode changed to Drilled and Cased
1968-08-08 Liner Casing Operation Performed
1968-08-18 Perforation Treatment Performed - Jet Perforation
1968-08-18 Well Log Performed
1968-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-20 Well Began Production
1968-08-20 Well Fluid changed to Crude Oil
1968-08-20 Well Mode changed to Flowing
1968-12-29 Perforation Treatment Performed - Cement Squeeze
1969-01-04 Perforation Treatment Performed - Jet Perforation
1969-01-04 Well Log Performed
1969-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-17 Well Fluid changed to Crude Oil
1969-05-17 Well Mode changed to Pumping
1979-09-23 Well Log Performed
1980-06-23 Perforation Treatment Performed - Cement Squeeze
1980-06-24 Perforation Treatment Performed - Jet Perforation
1992-03-01 Well Log Performed
1992-03-04 Well Log Performed
1992-03-06 Perforation Treatment Performed - Cement Squeeze
1992-03-06 Well Log Performed
1992-03-07 Perforation Treatment Performed - Jet Perforation
1992-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-10 Well Log Performed
1992-09-11 Perforation Treatment Performed - Cement Squeeze
1992-09-11 Perforation Treatment Performed - Jet Perforation
1992-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-20 Well Log Performed
1995-09-22 Well Log Performed
2001-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-09 Plug Back Performed
2001-05-09 Well Fluid changed to Crude Oil
2001-05-09 Well Mode changed to Abandoned Zone
2001-05-10 Well Log Performed
2001-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-11 Perforation Treatment Performed - Jet Perforation
2001-05-18 Well Log Performed
2001-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-19 Perforation Treatment Performed - Jet Perforation
2001-05-19 Plug Back Performed
2001-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-31 Well Log Performed
2009-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-04-02 Plug Back Performed
2009-04-02 Well Log Performed
2009-04-03 Perforation Treatment Performed - Jet Perforation
2009-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-04-04 Perforation Treatment Performed - Remedial Casing
2009-04-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-18 Perforation 1556.00 1559.10 10
1992-03-07 Perforation 1546.50 1551.50 13
1992-03-08 Acid Treatment 1546.50 1551.50 0
1992-09-11 Perforation 1539.20 1541.10 13
1992-09-11 Cement Squeeze 1546.50 1551.50 0
1992-10-13 Acid Treatment 1539.20 1541.10 0
2001-05-09 Packing Device Capped w/Cement 1503.00 1511.00 0
2001-05-11 Perforation 1410.60 1417.30 13
2001-05-11 Acid Treatment 1410.60 1417.30 0
2001-05-19 Packing Device Capped w/Cement 1400.00 1408.00 0
2001-05-19 Perforation 1326.50 1332.00 20
1968-08-19 Acid Treatment 1556.00 1559.10 0
2001-05-19 Perforation 1338.00 1339.30 20
2001-05-20 Acid Treatment 1326.50 1339.30 0
2009-04-02 Packing Device Capped w/Cement 1313.00 1321.00 0
2009-04-03 Perforation 722.00 723.00 17
2009-04-04 Remedial Casing Cementing 722.00 723.00 0
2009-04-04 Packing Device Capped w/Cement 711.50 720.00 0
1968-12-29 Cement Squeeze 1556.00 1559.10 0
1969-01-04 Perforation 1567.60 1569.10 7
1969-01-05 Acid Treatment 1567.60 1569.10 0
1980-06-23 Cement Squeeze 1567.60 1569.10 0
1980-06-24 Perforation 1553.90 1557.50 13
1980-06-24 Perforation 1553.90 1557.50 13
1992-03-06 Cement Squeeze 1553.90 1557.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1799 0.0 0.0 0.0
1969 5268 0.0 0.0 0.0
1970 6255 0.0 0.0 0.0
1971 7112 0.0 0.0 0.0
1972 8120 0.0 0.0 0.0
1973 7995 0.0 0.0 0.0
1974 4396 0.0 0.0 0.0
1975 6931 0.0 0.0 0.0
1976 4816 0.0 0.0 0.0
1977 5007 0.0 0.0 0.0
1978 5112 0.0 0.0 0.0
1979 4332 0.0 0.0 0.0
1980 1842 0.0 0.0 0.0
1981 3296 0.0 0.0 0.0
1982 5341 0.0 0.0 0.0
1983 5697 0.0 0.0 0.0
1984 7351 0.0 0.0 0.0
1985 5749 0.0 0.0 0.0
1986 5599 0.0 0.0 0.0
1987 5945 0.0 0.0 0.0
1988 7607 0.0 0.0 0.0
1989 8367 0.0 0.0 0.0
1990 8189 0.0 0.0 0.0
1991 7400 0.0 0.0 0.0
1992 5328 0.0 0.0 0.0
1993 6344 0.0 0.0 0.0
1994 2393 0.0 0.0 0.0
1995 904 0.0 0.0 0.0
1996 5945 0.0 0.0 0.0
1997 358 0.0 0.0 0.0
1999 416 0.0 0.0 0.0
2000 5812 0.0 0.0 0.0

For data sources see[5]

References