If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146082310020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.917311,"lon":-119.221617,"icon":""}]} |
| Location: 02/10-23-114-08W6/0 | |
| Location Alias: 02/10-23-14-08 W6M | |
| Location Alias 2: 02/10-23-114-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 23 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL 102 AMBER 10-23-114-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0373468 | |
| License Date: 2007-01-31 | |
| License Status: Issued | |
| Spud Date: 2007-02-22 | |
| Final Drill Date: 2007-03-04 | |
| Well Total Depth: 1589.00 m | |
| Surface Hole Latitude: 58.917311 | |
| Surface Hole Longitude: -119.221617 |
| Date | Event |
|---|---|
| 2007-01-31 | Obtained License |
| 2007-02-25 | Surface Casing Operation Performed |
| 2007-03-02 | Well Log Performed |
| 2007-03-03 | Production Casing Operation Performed |
| 2007-03-04 | Finished Drilling |
| 2007-03-04 | Perforation Treatment Performed - Open-Hole Completion |
| 2007-03-04 | Well Log Performed |
| 2007-03-04 | Well Mode changed to Drilled and Cased |
| 2007-03-05 | Well Log Performed |
| 2007-03-06 | Rig Released |
| 2007-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2007-04-20 | Well Began Production |
| 2007-04-20 | Well Fluid changed to Crude Oil |
| 2007-04-20 | Well Mode changed to Flowing |
| 2007-05-13 | Well Fluid changed to Crude Oil |
| 2007-05-13 | Well Mode changed to Pumping |
| 2018-10-16 | Well Fluid changed to Crude Oil |
| 2018-10-16 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-03-04 | Open Hole/Barefoot Completion | 1565.00 | 1589.00 | 0 |
| 2007-03-14 | Acid Treatment | 1565.00 | 1589.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 5117 | 0.0 | 0.0 | 0.0 |
| 2008 | 8516 | 0.0 | 0.0 | 0.0 |
| 2009 | 7920 | 0.0 | 0.0 | 0.0 |
| 2010 | 8286 | 0.0 | 0.0 | 0.0 |
| 2011 | 5985 | 0.0 | 0.0 | 0.0 |
| 2012 | 5843 | 0.0 | 0.0 | 0.0 |
| 2013 | 4091 | 0.0 | 0.0 | 0.0 |
| 2015 | 2000 | 0.0 | 0.0 | 0.0 |
| 2016 | 6396 | 0.0 | 0.0 | 0.0 |
| 2017 | 6766 | 0.0 | 0.0 | 0.0 |
| 2018 | 5396 | 0.0 | 0.0 | 0.0 |
For data sources see[5]