X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1146082405000

Well Details

Well ID: 1146082405000
Loading map...
Location: 00/05-24-114-08W6/0
Location Alias: 00/05-24-14-08 W6M
Location Alias 2: 00/05-24-114-08 W6/00
Country: Canada
Province: Alberta
Township: 114
Meridian: 6
Range: 08
Section: 24
County/Municipality: Mackenzie County
Well Name: ACL AMBER 5-24-114-8
Operator Name: Paramount Resources Ltd.
License Number: 0176643
License Date: 1995-03-03
License Status: Abandoned
Spud Date: 1995-03-04
Final Drill Date: 1995-03-18
Well Total Depth: 1615.00 m
Surface Hole Latitude: 58.912645
Surface Hole Longitude: -119.211522

For data sources see[1][2]

Well History

Date Event
1995-03-03 Obtained License
1995-03-05 Lost Circulation Occurred
1995-03-07 Surface Casing Operation Performed
1995-03-11 Direction Drilling Operation Performed - Deviate
1995-03-12 Lost Circulation Occurred
1995-03-15 Well Log Performed
1995-03-16 Intermediate Casing Operation Performed
1995-03-16 Lost Circulation Occurred
1995-03-18 Drill Stem Test Performed
1995-03-18 Finished Drilling
1995-03-18 Well Log Performed
1995-03-18 Well Mode changed to Drilled and Cased
1995-03-20 Drill Stem Test Performed
1995-03-20 Well Log Performed
1995-03-21 Liner Casing Operation Performed
1995-03-22 Rig Released
1996-02-09 Well Log Performed
1996-02-10 Well Log Performed
1996-02-11 Perforation Treatment Performed - Jet Perforation
1996-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-16 Perforation Treatment Performed - Jet Perforation
1996-03-05 Well Began Production
1996-03-05 Well Fluid changed to Crude Oil
1996-03-05 Well Mode changed to Pumping
1996-11-01 Well Log Performed
1996-11-02 Perforation Treatment Performed - Jet Perforation
1996-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-04 Perforation Treatment Performed - Jet Perforation
1996-11-04 Well Log Performed
1996-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-06 Perforation Treatment Performed - Remedial Casing
1996-11-09 Perforation Treatment Performed - Jet Perforation
1996-11-09 Perforation Treatment Performed - Remedial Casing
1996-11-11 Well Log Performed
1998-02-28 Well Log Performed
1998-03-03 Perforation Treatment Performed - Jet Perforation
1998-03-03 Well Log Performed
1998-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-12 Perforation Treatment Performed - Jet Perforation
2003-05-12 Plug Back Performed
2003-05-12 Well Fluid changed to Crude Oil
2003-05-12 Well Mode changed to Abandoned Zone
2003-05-15 Perforation Treatment Performed - Remedial Casing
2003-05-19 Perforation Treatment Performed - Jet Perforation
2009-11-29 Perforation Treatment Performed - Jet Perforation
2009-12-01 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2009-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-02 Perforation Treatment Performed - Cement Squeeze
2009-12-02 Plug Back Performed
2009-12-02 Well Log Performed
2009-12-03 Perforation Treatment Performed - Jet Perforation
2009-12-04 Perforation Treatment Performed - Cement Plug
2009-12-04 Plug Back Performed
2009-12-04 Well Log Performed
2009-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-05 Plug Back Performed
2009-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-06 Perforation Treatment Performed - Cement Squeeze
2009-12-06 Plug Back Performed
2009-12-09 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-03-11 1305.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-11 Perforation 1583.50 1584.50 13
1996-11-09 Remedial Casing Cementing 410.00 411.00 0
1998-03-03 Perforation 1575.50 1579.00 13
1998-03-04 Acid Treatment 1575.50 1579.00 0
2003-05-12 Packing Device Capped w/Cement 1562.00 1570.00 0
2003-05-12 Packing Device Capped w/Cement 394.00 402.00 0
2003-05-12 Perforation 298.00 301.00 13
2003-05-15 Remedial Casing Cementing 298.00 301.00 0
2003-05-19 Perforation 298.00 301.00 14
2009-11-29 Perforation 1445.00 1446.00 17
2009-12-01 Packing Dev Cpd w/Res-Gyp Cem 1456.00 1459.00 0
1996-02-12 Acid Treatment 1583.50 1584.50 0
2009-12-02 Cement Squeeze 1445.00 1446.00 0
2009-12-02 Packing Device Capped w/Cement 1420.50 1440.00 0
2009-12-03 Perforation 1366.50 1367.50 17
2009-12-04 Cement Plug 1296.70 1421.30 0
2009-12-05 Packing Device Capped w/Cement 392.00 400.00 0
2009-12-06 Packing Device Capped w/Cement 266.00 290.00 0
2009-12-06 Cement Squeeze 298.00 301.00 0
1996-02-16 Perforation 1579.00 1581.00 13
1996-11-02 Perforation 1345.00 1346.00 13
1996-11-03 Acid Treatment 1345.00 1356.00 0
1996-11-04 Perforation 1583.50 1584.50 13
1996-11-05 Acid Treatment 1583.50 1584.50 0
1996-11-06 Remedial Casing Cementing 1345.00 1346.00 0
1996-11-09 Perforation 410.00 411.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5070 0.0 0.0 0.0
1997 6878 0.0 0.0 0.0
1998 2283 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-03-05 Lost Circulation 145.00 145.00
1995-03-12 Lost Circulation 1476.00 1510.00
1995-03-16 Lost Circulation 1510.00 1510.00

For data sources see[7]

References