If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1146082509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.929044,"lon":-119.183884,"icon":""}]} |
| Location: 00/09-25-114-08W6/0 | |
| Location Alias: 00/09-25-14-08 W6M | |
| Location Alias 2: 00/09-25-114-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 114 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 25 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL AMBER 9-25-114-8 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0175549 | |
| License Date: 1995-01-31 | |
| License Status: Suspension | |
| Spud Date: 1995-02-15 | |
| Final Drill Date: 1995-02-27 | |
| Well Total Depth: 1615.00 m | |
| Surface Hole Latitude: 58.929044 | |
| Surface Hole Longitude: -119.183884 |
| Date | Event |
|---|---|
| 1995-01-31 | Obtained License |
| 1995-02-16 | Surface Casing Operation Performed |
| 1995-02-24 | Well Log Performed |
| 1995-02-25 | Intermediate Casing Operation Performed |
| 1995-02-27 | Finished Drilling |
| 1995-02-27 | Well Log Performed |
| 1995-02-27 | Well Mode changed to Drilled and Cased |
| 1995-02-28 | Drill Stem Test Performed |
| 1995-03-01 | Liner Casing Operation Performed |
| 1995-03-02 | Rig Released |
| 1995-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-05-20 | Well Began Production |
| 1995-05-20 | Well Fluid changed to Crude Oil |
| 1995-05-20 | Well Mode changed to Flowing |
| 1996-06-04 | Well Fluid changed to Crude Oil |
| 1996-06-04 | Well Mode changed to Pumping |
| 1999-10-05 | Well Log Performed |
| 1999-10-06 | Perforation Treatment Performed - Cement Squeeze |
| 1999-10-07 | Perforation Treatment Performed - Jet Perforation |
| 1999-10-07 | Well Log Performed |
| 1999-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-01-23 | Plug Back Performed |
| 2004-01-23 | Well Fluid changed to Crude Oil |
| 2004-01-23 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-03-11 | Perforation | 1588.50 | 1591.50 | 13 |
| 1995-03-12 | Acid Treatment | 1588.50 | 1591.50 | 0 |
| 1999-10-06 | Cement Squeeze | 1588.50 | 1591.50 | 0 |
| 1999-10-07 | Perforation | 1574.50 | 1576.00 | 13 |
| 1999-10-07 | Perforation | 1577.50 | 1581.00 | 13 |
| 1999-10-13 | Acid Treatment | 1574.50 | 1581.00 | 0 |
| 2004-01-23 | Packing Device Capped w/Cement | 1439.90 | 1563.10 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 2241 | 0.0 | 0.0 | 0.0 |
| 1996 | 3314 | 0.0 | 0.0 | 0.0 |
| 1997 | 7062 | 0.0 | 0.0 | 0.0 |
| 1998 | 8318 | 0.0 | 0.0 | 0.0 |
| 1999 | 4013 | 0.0 | 0.0 | 0.0 |
| 2000 | 6727 | 0.0 | 0.0 | 0.0 |
| 2001 | 8476 | 0.0 | 0.0 | 0.0 |
| 2002 | 8242 | 0.0 | 0.0 | 0.0 |
| 2003 | 7464 | 0.0 | 0.0 | 0.0 |
| 2004 | 52 | 0.0 | 0.0 | 0.0 |
For data sources see[5]