If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1156032908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.014451,"lon":-118.4626,"icon":""}]} |
| Location: 00/08-29-115-03W6/0 | |
| Location Alias: 00/08-29-15-03 W6M | |
| Location Alias 2: 00/08-29-115-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 115 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 29 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL LARNE 8-29-115-3 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0279196 | |
| License Date: 2002-12-20 | |
| License Status: Abandoned | |
| Spud Date: 2003-01-11 | |
| Final Drill Date: 2003-01-29 | |
| Well Total Depth: 1430.00 m | |
| Surface Hole Latitude: 59.014451 | |
| Surface Hole Longitude: -118.462600 |
| Date | Event |
|---|---|
| 2002-12-20 | Obtained License |
| 2003-01-12 | Surface Casing Operation Performed |
| 2003-01-15 | Direction Drilling Operation Performed - Deviate |
| 2003-01-19 | Well Log Performed |
| 2003-01-21 | Production Casing Operation Performed |
| 2003-01-29 | Finished Drilling |
| 2003-01-29 | Perforation Treatment Performed - Open-Hole Completion |
| 2003-01-29 | Well Log Performed |
| 2003-01-29 | Well Mode changed to Drilled and Cased |
| 2003-01-30 | Rig Released |
| 2003-01-30 | Well Log Performed |
| 2003-01-31 | Well Log Performed |
| 2003-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2003-02-03 | Well Log Performed |
| 2003-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-05-02 | Well Began Production |
| 2003-05-02 | Well Fluid changed to Crude Oil |
| 2003-05-02 | Well Mode changed to Pumping |
| 2003-11-18 | Well Log Performed |
| 2003-11-21 | Well Log Performed |
| 2003-11-24 | Perforation Treatment Performed - Cement Plug |
| 2003-11-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2003-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-11-28 | Well Log Performed |
| 2003-12-03 | Perforation Treatment Performed - Cement Squeeze |
| 2003-12-03 | Plug Back Performed |
| 2007-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-08-18 | Plug Back Performed |
| 2007-08-18 | Well Fluid changed to Crude Oil |
| 2007-08-18 | Well Log Performed |
| 2007-08-18 | Well Mode changed to Abandoned Zone |
| 2007-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2007-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-08-23 | Perforation Treatment Performed - Jet Perforation |
| 2007-08-23 | Well Log Performed |
| 2007-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-13 | Well Log Performed |
| 2008-02-14 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-15 | Perforation Treatment Performed - Cement Plug |
| 2008-02-15 | Perforation Treatment Performed - Remedial Casing |
| 2008-02-17 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2003-01-15 | 1019.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-01-29 | Open Hole/Barefoot Completion | 1377.00 | 1430.00 | 0 |
| 2003-12-03 | Cement Squeeze | 1212.50 | 1224.00 | 0 |
| 2007-08-18 | Packing Device Capped w/Cement | 1277.00 | 1413.50 | 0 |
| 2007-08-21 | Perforation | 450.00 | 451.00 | 13 |
| 2007-08-21 | Packing Device Capped w/Cement | 434.00 | 443.00 | 0 |
| 2007-08-21 | Perforation | 395.00 | 396.00 | 13 |
| 2007-08-21 | Perforation | 410.00 | 411.00 | 13 |
| 2007-08-23 | Packing Device Capped w/Cement | 380.40 | 388.40 | 0 |
| 2007-08-23 | Perforation | 377.00 | 378.00 | 13 |
| 2007-08-23 | Packing Device Capped w/Cement | 366.00 | 374.00 | 0 |
| 2007-08-23 | Perforation | 330.00 | 331.00 | 13 |
| 2003-02-03 | Perforation | 1212.50 | 1214.00 | 13 |
| 2007-08-24 | Packing Device Capped w/Cement | 318.00 | 326.00 | 0 |
| 2008-02-14 | Perforation | 223.50 | 226.50 | 20 |
| 2008-02-15 | Remedial Casing Cementing | 223.50 | 226.50 | 0 |
| 2008-02-15 | Cement Plug | 204.20 | 245.20 | 0 |
| 2003-02-03 | Perforation | 1215.00 | 1216.50 | 13 |
| 2003-02-03 | Perforation | 1217.50 | 1221.00 | 13 |
| 2003-02-03 | Perforation | 1223.00 | 1224.00 | 13 |
| 2003-02-04 | Acid Treatment | 1212.50 | 1224.00 | 0 |
| 2003-11-24 | Cement Plug | 1413.50 | 1430.00 | 0 |
| 2003-11-24 | Open Hole/Barefoot Completion | 1377.00 | 1413.50 | 0 |
| 2003-11-27 | Acid Treatment | 1377.00 | 1413.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 4746 | 0.0 | 0.0 | 0.0 |
| 2004 | 8317 | 0.0 | 0.0 | 0.0 |
| 2005 | 2065 | 0.0 | 0.0 | 0.0 |
For data sources see[6]