X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156033205003

Well Details

Well ID: 1156033205003
Loading map...
Location: 00/05-32-115-03W6/3
Location Alias: 00/05-32-15-03 W6M
Location Alias 2: 00/05-32-115-03 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 03
Section: 32
County/Municipality: Mackenzie County
Well Name: ACL LARNE 5-32-115-3
Operator Name: Paramount Resources Ltd.
License Number: 0285163
License Date: 2003-03-28
License Status: Suspension
Spud Date: 2003-01-27
Final Drill Date: 2003-01-27
Well Total Depth: 1462.40 m
Surface Hole Latitude: 59.027964
Surface Hole Longitude: -118.480786

For data sources see[1][2]

Well History

Date Event
2003-01-27 Finished Drilling
2003-01-28 Well Mode changed to Drilled and Cased
2003-02-04 Production Casing Operation Performed
2003-02-06 Perforation Treatment Performed - Jet Perforation
2003-02-06 Well Log Performed
2003-02-07 Perforation Treatment Performed - Jet Perforation
2003-02-07 Well Log Performed
2003-02-08 Rig Released
2003-03-28 Obtained License
2003-04-07 Well Log Performed
2003-04-08 Perforation Treatment Performed - Jet Perforation
2003-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-10-01 Well Began Production
2004-10-01 Well Fluid changed to Gas
2004-10-01 Well Mode changed to Flowing
2006-02-13 Well Structure changed to Commingled
2018-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-02-28 Plug Back Performed
2018-02-28 Well Mode changed to Abandoned Zone
2018-02-28 Well Structure changed to Commingled
2018-03-01 Well Log Performed
2018-03-02 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-03-02 Perforation Treatment Performed - Jet Perforation
2018-03-02 Well Log Performed
2018-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-04 Perforation Treatment Performed - Jet Perforation
2018-03-04 Plug Back Performed
2018-03-04 Well Log Performed
2018-03-05 Perforation Treatment Performed - Jet Perforation
2018-03-05 Well Log Performed
2018-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-06 Plug Back Performed
2018-03-06 Well Log Performed
2018-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-07 Perforation Treatment Performed - Cement Plug
2018-03-07 Plug Back Performed
2018-03-07 Well Log Performed
2018-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-03-08 Perforation Treatment Performed - Jet Perforation
2018-03-08 Well Log Performed
2018-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-03-09 Perforation Treatment Performed - Jet Perforation
2018-03-09 Well Log Performed
2018-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-11 Perforation Treatment Performed - Cement Plug
2018-03-11 Plug Back Performed
2018-03-11 Well Log Performed
2018-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-12 Perforation Treatment Performed - Jet Perforation
2018-03-12 Plug Back Performed
2018-03-12 Well Log Performed
2018-03-13 Perforation Treatment Performed - Cement Plug
2018-03-13 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-06 Perforation 1280.00 1281.00 13
2018-03-02 Bridge Plug, No Cement 1090.00 1090.40 0
2018-03-04 Perforation 1086.00 1087.00 20
2018-03-04 Packing Device Capped w/Cement 1076.40 1084.30 0
2018-03-05 Perforation 555.00 556.00 20
2018-03-05 Perforation 555.00 556.00 99
2018-03-06 Acid Treatment 555.00 556.00 0
2018-03-06 Packing Device Capped w/Cement 537.00 548.00 0
2018-03-07 Packing Device Capped w/Cement 310.00 318.00 0
2018-03-07 Cement Plug 324.00 326.00 0
2018-03-08 Perforation 216.00 217.00 20
2003-02-06 Perforation 1286.00 1287.00 13
2018-03-08 Acid Treatment 216.00 217.00 0
2018-03-09 Perforation 216.00 217.00 20
2018-03-09 Acid Treatment 216.00 217.00 0
2018-03-11 Packing Device Capped w/Cement 202.00 212.00 0
2018-03-11 Cement Plug 216.00 217.00 0
2018-03-12 Perforation 186.50 187.50 20
2018-03-12 Packing Device Capped w/Cement 175.00 184.50 0
2018-03-13 Cement Plug 184.50 187.50 0
2003-02-07 Perforation 1279.20 1280.50 13
2003-02-07 Perforation 1282.30 1283.80 13
2003-04-08 Perforation 1211.90 1216.20 13
2003-04-09 Acid Treatment 1279.20 1283.80 0
2018-02-28 Packing Device Capped w/Cement 1265.00 1273.00 0
2018-02-28 Packing Device Capped w/Cement 1198.00 1206.00 0
2018-03-02 Perforation 1099.00 1100.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1619 0.0 0.0 0.0
2005 487 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References