X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156043616000

Well Details

Well ID: 1156043616000
Loading map...
Location: 00/16-36-115-04W6/0
Location Alias: 00/16-36-15-04 W6M
Location Alias 2: 00/16-36-115-04 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 04
Section: 36
County/Municipality: Mackenzie County
Well Name: ACL LARNE 16-36-115-4
Operator Name: Paramount Resources Ltd.
License Number: 0147071
License Date: 1990-12-20
License Status: Suspension
Spud Date: 1991-01-02
Final Drill Date: 1991-01-17
Well Total Depth: 1447.00 m
Surface Hole Latitude: 59.036720
Surface Hole Longitude: -118.513586

For data sources see[1][2]

Well History

Date Event
1990-12-20 Obtained License
1991-01-04 Surface Casing Operation Performed
1991-01-16 Lost Circulation Occurred
1991-01-17 Finished Drilling
1991-01-17 Well Log Performed
1991-01-17 Well Mode changed to Drilled and Cased
1991-01-18 Plug Back Performed
1991-01-18 Well Log Performed
1991-01-20 Production Casing Operation Performed
1991-01-20 Rig Released
1991-01-27 Well Log Performed
1991-03-21 Well Log Performed
1991-03-23 Perforation Treatment Performed - Jet Perforation
1991-03-23 Well Log Performed
1991-03-27 Perforation Treatment Performed - Jet Perforation
1991-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-31 Well Log Performed
1992-04-01 Well Began Production
1992-04-01 Well Fluid changed to Crude Oil
1992-04-01 Well Mode changed to Pumping
1993-02-21 Perforation Treatment Performed - Jet Perforation
1993-02-21 Well Log Performed
1993-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-12 Well Log Performed
1999-09-13 Perforation Treatment Performed - Jet Perforation
1999-09-13 Well Log Performed
1999-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-05 Well Fluid changed to Crude Oil
1999-10-05 Well Mode changed to Pumping
2002-03-19 Perforation Treatment Performed - Jet Perforation
2002-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-23 Perforation 1414.00 1416.00 14
1999-09-14 Acid Treatment 1267.00 1271.00 0
2002-03-19 Perforation 1207.50 1209.50 13
2002-03-20 Acid Treatment 1207.50 1209.50 0
1991-03-23 Perforation 1418.00 1420.00 14
1991-03-27 Perforation 1409.00 1412.00 14
1991-03-27 Perforation 1422.50 1425.50 14
1991-03-28 Acid Treatment 1409.00 1416.00 0
1993-02-21 Perforation 1389.00 1392.00 18
1993-02-21 Perforation 1403.00 1407.00 18
1993-02-22 Acid Treatment 1389.00 1407.00 0
1999-09-13 Perforation 1267.00 1271.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3616 0.0 0.0 0.0
1993 6457 0.0 0.0 0.0
1994 6177 0.0 0.0 0.0
1995 2170 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-01-16 Lost Circulation 1442.50 1447.00

For data sources see[6]

References