X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156050414000

Well Details

Well ID: 1156050414000
Loading map...
Location: 00/14-04-115-05W6/0
Location Alias: 00/14-04-15-05 W6M
Location Alias 2: 00/14-04-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 04
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 14-4-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0127625
License Date: 1987-07-29
License Status: Abandoned
Spud Date: 1987-08-15
Final Drill Date: 1987-09-01
Well Total Depth: 1534.00 m
Surface Hole Latitude: 58.964730
Surface Hole Longitude: -118.784107

For data sources see[1][2]

Well History

Date Event
1987-07-29 Obtained License
1987-08-16 Surface Casing Operation Performed
1987-08-23 Well Log Performed
1987-08-24 Well Log Performed
1987-08-25 Intermediate Casing Operation Performed
1987-09-01 Finished Drilling
1987-09-01 Well Log Performed
1987-09-01 Well Mode changed to Drilled and Cased
1987-09-02 Liner Casing Operation Performed
1987-09-02 Well Log Performed
1987-09-03 Rig Released
1987-09-24 Perforation Treatment Performed - Jet Perforation
1987-09-24 Well Log Performed
1987-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-10-01 Perforation Treatment Performed - Jet Perforation
1987-10-01 Well Log Performed
1987-12-01 Well Began Production
1987-12-01 Well Fluid changed to Crude Oil
1987-12-01 Well Mode changed to Pumping
1991-12-11 Perforation Treatment Performed - Jet Perforation
1991-12-12 Perforation Treatment Performed - Jet Perforation
1991-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-18 Well Log Performed
1993-05-01 Well Fluid changed to Crude Oil
1993-05-01 Well Mode changed to Suspended
1993-12-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-12-11 Plug Back Performed
1993-12-11 Well Fluid changed to Crude Oil
1993-12-11 Well Mode changed to Abandoned Zone
1993-12-13 Well Log Performed
1996-08-13 Perforation Treatment Performed - Jet Perforation
1996-08-14 Perforation Treatment Performed - Remedial Casing
1996-08-23 Perforation Treatment Performed - Jet Perforation
1996-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-28 Plug Back Performed
1996-08-29 Perforation Treatment Performed - Jet Perforation
1996-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-26 Well Log Performed
2007-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-27 Plug Back Performed
2007-11-27 Well Log Performed
2007-11-28 Perforation Treatment Performed - Jet Perforation
2007-11-29 Well Log Performed
2007-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-30 Perforation Treatment Performed - Remedial Casing
2007-11-30 Well Log Performed
2007-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-01 Perforation Treatment Performed - Jet Perforation
2007-12-01 Perforation Treatment Performed - Remedial Casing
2007-12-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-24 Perforation 1505.50 1507.50 7
1991-12-16 Acid Treatment 1462.50 1478.50 0
1993-12-11 Packing Device Capped w/Cement 1447.00 1455.00 0
1996-08-13 Perforation 278.90 279.00 6
1996-08-14 Remedial Casing Cementing 278.90 279.00 0
1996-08-23 Perforation 1340.50 1343.50 13
1996-08-23 Perforation 1337.50 1340.50 13
1996-08-26 Acid Treatment 1337.50 1343.50 0
1996-08-28 Packing Device Capped w/Cement 1324.00 1332.00 0
1996-08-29 Perforation 1259.00 1266.00 13
1996-08-30 Acid Treatment 1259.00 1266.00 0
1987-09-25 Acid Treatment 1505.50 1507.50 0
2007-11-27 Packing Device Capped w/Cement 1242.00 1250.00 0
2007-11-28 Perforation 900.00 901.00 13
2007-11-30 Remedial Casing Cementing 900.00 901.00 0
2007-11-30 Packing Device Capped w/Cement 878.40 888.00 0
2007-11-30 Packing Device Capped w/Cement 262.00 270.00 0
2007-12-01 Perforation 227.00 228.00 13
2007-12-01 Remedial Casing Cementing 227.00 228.00 0
2007-12-01 Packing Device Capped w/Cement 312.30 322.00 0
1987-10-01 Packing Device Capped w/Cement 1502.00 1504.00 0
1987-10-01 Perforation 1491.00 1494.00 7
1987-10-01 Acid Treatment 1491.00 1494.00 0
1991-12-11 Perforation 1470.50 1478.50 13
1991-12-11 Perforation 1484.70 1488.00 13
1991-12-12 Perforation 1462.50 1468.00 13
1991-12-14 Acid Treatment 1484.70 1488.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 459 0.0 0.0 0.0
1988 1750 0.0 0.0 0.0
1989 1796 0.0 0.0 0.0
1990 5789 0.0 0.0 0.0
1991 4849 0.0 0.0 0.0
1992 8045 0.0 0.0 0.0
1993 2852 0.0 0.0 0.0

For data sources see[5]

References