X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156050614000

Well Details

Well ID: 1156050614000
Loading map...
Location: 00/14-06-115-05W6/0
Location Alias: 00/14-06-15-05 W6M
Location Alias 2: 00/14-06-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 06
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 14-6-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0172915
License Date: 1994-11-23
License Status: Abandoned
Spud Date: 1994-12-10
Final Drill Date: 1994-12-29
Well Total Depth: 1503.00 m
Surface Hole Latitude: 58.962845
Surface Hole Longitude: -118.843089

For data sources see[1][2]

Well History

Date Event
1994-11-23 Obtained License
1994-12-13 Surface Casing Operation Performed
1994-12-20 Well Log Performed
1994-12-21 Intermediate Casing Operation Performed
1994-12-21 Well Log Performed
1994-12-29 Finished Drilling
1994-12-29 Well Mode changed to Drilled and Cased
1994-12-30 Well Log Performed
1995-01-01 Liner Casing Operation Performed
1995-01-02 Rig Released
1995-01-15 Perforation Treatment Performed - Open-Hole Completion
1995-01-17 Perforation Treatment Performed - Cement Squeeze
1995-01-19 Perforation Treatment Performed - Jet Perforation
1995-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-01 Well Began Production
1995-02-01 Well Fluid changed to Crude Oil
1995-02-01 Well Mode changed to Pumping
1995-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-02 Perforation Treatment Performed - Jet Perforation
2000-11-02 Well Log Performed
2000-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-16 Well Log Performed
2008-03-17 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2008-03-17 Well Log Performed
2008-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-18 Plug Back Performed
2008-03-18 Well Fluid changed to Crude Oil
2008-03-18 Well Mode changed to Abandoned Zone
2008-03-19 Well Log Performed
2008-03-20 Perforation Treatment Performed - Jet Perforation
2008-03-20 Well Log Performed
2008-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-21 Perforation Treatment Performed - Remedial Casing
2008-03-24 Well Abandoned
2008-03-24 Well Fluid changed to Crude Oil
2008-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-15 Open Hole/Barefoot Completion 1495.00 1503.00 0
1995-10-15 Acid Treatment 1433.00 1481.00 0
1995-10-16 Acid Treatment 1467.00 1468.00 0
2000-11-02 Perforation 1443.00 1444.00 14
2000-11-03 Acid Treatment 1438.00 1475.00 0
2008-03-17 Packing Dev Cpd w/Res-Gyp Cem 1470.00 1473.00 0
2008-03-18 Packing Device Capped w/Cement 1311.00 1430.00 0
2008-03-20 Perforation 660.00 661.00 17
2008-03-21 Remedial Casing Cementing 660.00 661.00 0
2008-03-21 Packing Device Capped w/Cement 639.00 658.00 0
1995-01-17 Cement Squeeze 1495.00 1503.00 0
1995-01-19 Perforation 1433.00 1434.00 13
1995-01-19 Perforation 1438.00 1439.50 13
1995-01-19 Perforation 1450.00 1451.00 13
1995-01-19 Perforation 1467.00 1468.00 13
1995-01-19 Perforation 1474.00 1475.00 13
1995-01-19 Perforation 1480.00 1481.00 13
1995-01-21 Acid Treatment 1433.00 1481.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7182 0.0 0.0 0.0
1996 3541 0.0 0.0 0.0
2000 536 0.0 0.0 0.0

For data sources see[5]

References