X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156050703002

Well Details

Well ID: 1156050703002
Loading map...
Location: 00/03-07-115-05W6/2
Location Alias: 00/03-07-15-05 W6M
Location Alias 2: 00/03-07-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 07
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 3-7-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0034288
License Date: 1968-06-17
License Status: Abandoned
Spud Date: 1968-07-03
Final Drill Date: 1968-07-23
Well Total Depth: 1655.10 m
Surface Hole Latitude: 58.967922
Surface Hole Longitude: -118.843821

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-17 Obtained License
1968-07-13 Drill Stem Test Performed
1968-07-17 Intermediate Casing Operation Performed
1968-07-23 Finished Drilling
1968-07-23 Well Mode changed to Drilled and Cased
1968-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-13 Perforation Treatment Performed - Jet Perforation
1968-08-13 Well Log Performed
1968-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-17 Perforation Treatment Performed - Jet Perforation
1968-12-17 Well Log Performed
1969-04-04 Perforation Treatment Performed - Open-Hole Completion
1969-04-04 Well Log Performed
1969-05-10 Perforation Treatment Performed - Jet Perforation
1969-05-10 Well Log Performed
1969-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-11-09 Perforation Treatment Performed - Jet Perforation
1979-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-11 Well Log Performed
1984-06-15 Perforation Treatment Performed - Jet Perforation
1984-06-15 Perforation Treatment Performed - Open-Hole Completion
1984-06-22 Perforation Treatment Performed - Cement Squeeze
1984-06-26 Perforation Treatment Performed - Open-Hole Completion
1984-06-27 Liner Casing Operation Performed
1984-06-27 Perforation Treatment Performed - Cement Squeeze
1984-06-27 Well Log Performed
1984-06-28 Perforation Treatment Performed - Jet Perforation
1984-06-28 Perforation Treatment Performed - Remedial Casing
1984-07-03 Perforation Treatment Performed - Open-Hole Completion
1984-07-03 Well Log Performed
1984-07-04 Perforation Treatment Performed - Jet Perforation
1984-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-22 Well Began Injection
1984-07-22 Well Fluid changed to Water
1984-07-22 Well Type changed to Injection
1987-01-17 Perforation Treatment Performed - Cement Squeeze
1987-01-19 Perforation Treatment Performed - Jet Perforation
1987-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-26 Well Log Performed
1999-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-28 Perforation Treatment Performed - Acid Wash - No Pressure
2001-03-28 Well Log Performed
2001-03-30 Well Log Performed
2001-04-03 Well Log Performed
2001-04-04 Perforation Treatment Performed - Jet Perforation
2001-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-04-05 Well Log Performed
2001-04-06 Perforation Treatment Performed - Jet Perforation
2001-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-07 Well Fluid changed to Water
2001-05-07 Well Type changed to Injection
2001-05-08 Well Fluid changed to Water
2001-05-08 Well Type changed to Injection
2003-09-25 Well Fluid changed to Water
2003-09-25 Well Mode changed to Suspended
2003-09-25 Well Type changed to Injection
2008-01-17 Perforation Treatment Performed - Cement Plug
2008-01-17 Plug Back Performed
2008-01-17 Well Fluid changed to Water
2008-01-17 Well Mode changed to Abandoned Zone
2008-01-17 Well Type changed to Injection
2008-01-19 Well Log Performed
2008-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-20 Plug Back Performed
2008-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-01-21 Plug Back Performed
2008-01-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-08-13 Perforation 1471.60 1474.60 7
1979-11-09 Perforation 1469.70 1470.70 6
1979-11-09 Perforation 1467.30 1467.90 6
1979-11-10 Acid Treatment 1467.30 1479.50 0
1984-06-15 Perforation 1485.00 1487.40 7
1984-06-15 Open Hole/Barefoot Completion 1488.90 1495.30 0
1984-06-22 Cement Squeeze 1467.30 1487.40 0
1984-06-26 Open Hole/Barefoot Completion 1488.90 1545.10 0
1984-06-27 Cement Squeeze 1488.90 1545.10 0
1984-06-28 Perforation 623.00 623.30 13
1984-06-28 Remedial Casing Cementing 623.00 623.30 0
1968-08-13 Acid Treatment 1471.60 1474.60 0
1984-07-03 Open Hole/Barefoot Completion 1544.70 1567.00 0
1984-07-04 Perforation 1471.50 1474.60 7
1984-07-04 Perforation 1490.50 1493.50 7
1984-07-05 Acid Treatment 1471.50 1493.50 0
1987-01-17 Cement Squeeze 1490.50 1493.50 0
1987-01-19 Perforation 1466.00 1468.00 7
1987-01-20 Acid Treatment 1466.00 1474.60 0
1999-03-28 Acid Wash 1466.00 1474.60 0
1999-03-28 Acid Treatment 1466.00 1468.00 0
2001-04-04 Perforation 1349.00 1350.90 13
1968-12-17 Perforation 1478.90 1479.50 7
2001-04-04 Perforation 1360.00 1361.90 13
2001-04-05 Acid Treatment 1349.90 1361.90 0
2001-04-06 Perforation 1271.90 1277.10 13
2001-04-07 Acid Treatment 1271.90 1277.10 0
2008-01-17 Cement Plug 1407.30 1446.00 0
2008-01-20 Packing Device Capped w/Cement 1333.00 1341.00 0
2008-01-21 Packing Device Capped w/Cement 1252.00 1260.00 0
1968-12-17 Acid Treatment 1471.60 1479.50 0
1969-04-04 Open Hole/Barefoot Completion 1488.90 1495.30 0
1969-05-10 Perforation 1485.00 1487.40 7
1969-05-10 Perforation 1489.90 1494.10 7
1969-05-12 Acid Treatment 1471.60 1495.30 0
1975-04-01 Packing Device Capped w/Cement 1479.80 1481.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

References