X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051502002

Well Details

Well ID: 1156051502002
Loading map...
Location: 00/02-15-115-05W6/2
Location Alias: 00/02-15-15-05 W6M
Location Alias 2: 00/02-15-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 2-15-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0042245
License Date: 1972-03-02
License Status: Abandoned
Spud Date: 1972-12-30
Final Drill Date: 1973-01-12
Well Total Depth: 1502.70 m
Surface Hole Latitude: 58.981404
Surface Hole Longitude: -118.750105

For data sources see[1][2]

Well History

Date Event
1972-03-02 Obtained License
1972-12-31 Lost Circulation Occurred
1973-01-12 Finished Drilling
1973-01-12 Well Log Performed
1973-01-12 Well Mode changed to Drilled and Cased
1973-01-13 Well Log Performed
1973-01-14 Production Casing Operation Performed
1973-01-29 Well Log Performed
1973-02-05 Perforation Treatment Performed - Jet Perforation
1973-02-05 Well Log Performed
2005-12-14 Well Log Performed
2005-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-15 Perforation Treatment Performed - Jet Perforation
2005-12-15 Plug Back Performed
2005-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-02-03 Well Began Production
2006-02-03 Well Fluid changed to Gas
2006-02-03 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended
2012-01-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-15 Plug Back Performed
2012-01-15 Well Fluid changed to Gas
2012-01-15 Well Log Performed
2012-01-15 Well Mode changed to Abandoned Zone
2012-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-16 Plug Back Performed
2012-01-17 Perforation Treatment Performed - Jet Perforation
2012-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-19 Perforation Treatment Performed - Jet Perforation
2012-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-21 Perforation Treatment Performed - Remedial Casing
2012-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-22 Perforation Treatment Performed - Jet Perforation
2012-01-22 Perforation Treatment Performed - Remedial Casing
2012-01-23 Perforation Treatment Performed - Jet Perforation
2012-01-23 Well Log Performed
2012-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-24 Perforation Treatment Performed - Remedial Casing
2012-01-25 Perforation Treatment Performed - Jet Perforation
2012-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-26 Perforation Treatment Performed - Remedial Casing
2012-01-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-05 Perforation 1438.70 1442.30 7
2012-01-17 Perforation 1155.00 1156.00 17
2012-01-19 Perforation 633.00 634.00 99
2012-01-19 Packing Device Capped w/Cement 1144.00 1152.00 0
2012-01-21 Remedial Casing Cementing 633.00 634.00 0
2012-01-21 Packing Device Capped w/Cement 620.00 630.00 0
2012-01-22 Packing Device Capped w/Cement 275.00 285.00 0
2012-01-22 Perforation 288.00 289.00 17
2012-01-22 Remedial Casing Cementing 288.00 289.00 0
2012-01-23 Perforation 251.00 252.00 17
2012-01-24 Remedial Casing Cementing 251.00 252.00 0
2005-12-15 Packing Device Capped w/Cement 1422.00 1430.00 0
2012-01-24 Packing Device Capped w/Cement 241.00 249.00 0
2012-01-25 Perforation 189.00 190.00 17
2012-01-26 Remedial Casing Cementing 189.00 190.00 0
2012-01-26 Packing Device Capped w/Cement 176.00 186.00 0
2005-12-15 Perforation 1326.00 1328.50 13
2005-12-15 Perforation 1330.50 1332.00 13
2005-12-15 Perforation 1261.00 1262.00 13
2005-12-16 Acid Treatment 1326.00 1332.00 0
2005-12-17 Acid Treatment 1261.00 1262.00 0
2012-01-15 Packing Device Capped w/Cement 1314.50 1322.50 0
2012-01-16 Packing Device Capped w/Cement 1250.00 1258.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1014 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-12-31 Lost Circulation 89.30 89.30

For data sources see[6]

References