X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051615000

Well Details

Well ID: 1156051615000
Loading map...
Location: 00/15-16-115-05W6/0
Location Alias: 00/15-16-15-05 W6M
Location Alias 2: 00/15-16-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 16
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 15-16-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0044795
License Date: 1973-01-11
License Status: Suspension
Spud Date: 1973-01-16
Final Drill Date: 1973-02-07
Well Total Depth: 1501.10 m
Surface Hole Latitude: 58.993682
Surface Hole Longitude: -118.779078

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-01-11 Obtained License
1973-01-25 Drill Stem Test Performed
1973-01-29 Drill Stem Test Performed
1973-01-31 Intermediate Casing Operation Performed
1973-02-02 Lost Circulation Occurred
1973-02-07 Finished Drilling
1973-02-07 Perforation Treatment Performed - Open-Hole Completion
1973-02-07 Well Mode changed to Drilled and Cased
1973-03-10 Well Began Production
1973-03-10 Well Fluid changed to Crude Oil
1973-03-10 Well Mode changed to Flowing
1975-06-05 Well Fluid changed to Crude Oil
1975-06-05 Well Mode changed to Pumping
1978-04-01 Well Fluid changed to Crude Oil
1978-04-01 Well Mode changed to Suspended
1979-11-26 Well Fluid changed to Crude Oil
1979-11-26 Well Mode changed to Pumping
1990-03-15 Well Log Performed
1990-03-17 Well Log Performed
1990-08-08 Well Log Performed
1990-08-27 Well Log Performed
1990-08-29 Well Log Performed
1990-09-05 Well Log Performed
1990-09-06 Perforation Treatment Performed - Cement Plug
1990-09-06 Perforation Treatment Performed - Open-Hole Completion
1990-09-06 Well Log Performed
1990-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-10 Perforation Treatment Performed - Jet Perforation
1999-03-10 Plug Back Performed
1999-03-10 Well Fluid changed to Crude Oil
1999-03-10 Well Log Performed
1999-03-10 Well Mode changed to Abandoned Zone
1999-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-18 Plug Back Performed
1999-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-11-19 Perforation Treatment Performed - Jet Perforation
1999-11-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-07 Open Hole/Barefoot Completion 1433.80 1501.10 0
1999-11-19 Acid Treatment 1250.50 1255.50 0
1990-09-06 Cement Plug 1454.10 1455.50 0
1990-09-06 Open Hole/Barefoot Completion 1433.80 1454.10 0
1990-09-08 Acid Treatment 1433.80 1454.10 0
1999-03-10 Packing Device Capped w/Cement 1417.00 1425.00 0
1999-03-10 Perforation 1335.00 1338.00 13
1999-03-11 Acid Treatment 1335.00 1338.00 0
1999-11-18 Packing Device Capped w/Cement 1323.00 1331.00 0
1999-11-19 Perforation 1250.50 1255.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 4654 0.0 0.0 0.0
1974 6174 0.0 0.0 0.0
1975 8121 0.0 0.0 0.0
1976 5724 0.0 0.0 0.0
1977 6579 0.0 0.0 0.0
1978 600 0.0 0.0 0.0
1979 466 0.0 0.0 0.0
1980 408 0.0 0.0 0.0
1981 1769 0.0 0.0 0.0
1982 5099 0.0 0.0 0.0
1983 4433 0.0 0.0 0.0
1984 7358 0.0 0.0 0.0
1985 6335 0.0 0.0 0.0
1986 6808 0.0 0.0 0.0
1987 7733 0.0 0.0 0.0
1988 2679 0.0 0.0 0.0
1990 4865 0.0 0.0 0.0
1991 7243 0.0 0.0 0.0
1992 7779 0.0 0.0 0.0
1993 5592 0.0 0.0 0.0
1994 2492 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-02-02 Lost Circulation 1458.40 1458.40

For data sources see[6]

References