X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156051714000

Well Details

Well ID: 1156051714000
Loading map...
Location: 00/14-17-115-05W6/0
Location Alias: 00/14-17-15-05 W6M
Location Alias 2: 00/14-17-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 17
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 14-17-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0036282
License Date: 1969-05-30
License Status: Abandoned
Spud Date: 1969-06-02
Final Drill Date: 1969-06-22
Well Total Depth: 1591.10 m
Surface Hole Latitude: 58.992040
Surface Hole Longitude: -118.818457

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-30 Obtained License
1969-06-16 Drill Stem Test Performed
1969-06-22 Finished Drilling
1969-06-22 Well Mode changed to Drilled and Cased
1969-06-23 Drill Stem Test Performed
1969-06-24 Production Casing Operation Performed
1969-07-31 Perforation Treatment Performed - Jet Perforation
1969-07-31 Well Log Performed
1969-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-08-04 Well Began Production
1969-08-04 Well Fluid changed to Crude Oil
1969-08-04 Well Mode changed to Flowing
1970-03-27 Perforation Treatment Performed - Cement Squeeze
1970-03-27 Perforation Treatment Performed - Selective Jet Perforations
1970-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-08 Perforation Treatment Performed - Cement Squeeze
1970-04-08 Perforation Treatment Performed - Selective Jet Perforations
1970-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-09 Perforation Treatment Performed - Selective Jet Perforations
1971-12-14 Well Fluid changed to Crude Oil
1971-12-14 Well Mode changed to Suspended
1979-06-15 Well Log Performed
1979-11-01 Well Fluid changed to Crude Oil
1979-11-01 Well Mode changed to Flowing
1981-03-29 Well Fluid changed to Crude Oil
1981-03-29 Well Mode changed to Pumping
1981-08-01 Well Fluid changed to Crude Oil
1981-08-01 Well Mode changed to Suspended
1997-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-26 Plug Back Performed
1997-08-26 Well Fluid changed to Crude Oil
1997-08-26 Well Log Performed
1997-08-26 Well Mode changed to Abandoned Zone
1997-08-27 Perforation Treatment Performed - Jet Perforation
1997-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-22 Perforation Treatment Performed - Jet Perforation
1997-09-22 Well Log Performed
1997-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-24 Perforation Treatment Performed - Jet Perforation
1997-09-24 Well Log Performed
1997-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-26 Plug Back Performed
1997-09-26 Well Log Performed
2007-02-11 Well Log Performed
2007-03-05 Well Log Performed
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-03-08 Perforation Treatment Performed - Cement Squeeze
2007-03-08 Plug Back Performed
2007-03-14 Well Abandoned
2007-03-14 Well Fluid changed to Crude Oil
2007-03-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-31 Perforation 1549.00 1552.00 3
1970-04-08 Selective Jet Perforations 1490.20 1492.00 0
1970-04-09 Selective Jet Perforations 1494.70 1495.30 0
1970-04-09 Selective Jet Perforations 1495.70 1496.90 0
1970-04-09 Selective Jet Perforations 1497.20 1497.20 0
1970-04-09 Acid Treatment 1488.30 1497.20 0
1970-04-09 Acid Treatment 1488.30 1497.20 0
1997-08-26 Packing Device Capped w/Cement 1477.00 1485.00 0
1997-08-27 Perforation 1269.10 1271.60 13
1997-08-28 Acid Treatment 1269.10 1271.60 0
1997-09-22 Perforation 1371.80 1373.40 13
1969-08-01 Acid Treatment 1549.00 1552.00 0
1997-09-22 Perforation 1357.50 1358.80 13
1997-09-22 Perforation 1354.50 1355.80 13
1997-09-23 Acid Treatment 1354.50 1373.40 0
1997-09-24 Perforation 1371.60 1375.40 13
1997-09-26 Packing Device Capped w/Cement 1337.00 1345.00 0
1997-09-26 Packing Device Capped w/Cement 1254.00 1262.00 0
2007-03-06 Perforation 648.00 649.00 13
2007-03-08 Cement Squeeze 648.00 649.00 0
1970-03-27 Cement Squeeze 1549.00 1552.00 0
1970-03-27 Selective Jet Perforations 1543.80 1544.10 0
1970-03-27 Selective Jet Perforations 1544.40 1544.70 0
1970-03-27 Selective Jet Perforations 1546.30 1546.30 0
1970-03-28 Acid Treatment 1543.80 1546.30 0
1970-04-08 Cement Squeeze 1543.80 1546.30 0
1970-04-08 Selective Jet Perforations 1488.30 1489.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1722 0.0 0.0 0.0
1970 7045 0.0 0.0 0.0
1971 694 0.0 0.0 0.0
1980 1606 0.0 0.0 0.0
1981 138 0.0 0.0 0.0

For data sources see[5]

References