If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1156052613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.02327,"lon":-118.735988,"icon":""}]} |
| Location: 00/13-26-115-05W6/0 | |
| Location Alias: 00/13-26-15-05 W6M | |
| Location Alias 2: 00/13-26-115-05 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 115 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 26 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL VIRGO 13-26-115-5 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0387521 | |
| License Date: 2007-12-10 | |
| License Status: Suspension | |
| Spud Date: 2008-01-06 | |
| Final Drill Date: 2008-01-21 | |
| Well Total Depth: 1533.00 m | |
| Surface Hole Latitude: 59.023270 | |
| Surface Hole Longitude: -118.735988 |
| Date | Event |
|---|---|
| 2007-12-10 | Obtained License |
| 2008-01-06 | Surface Casing Operation Performed |
| 2008-01-12 | Well Log Performed |
| 2008-01-12 | Well Mode changed to Drilled and Cased |
| 2008-01-13 | Production Casing Operation Performed |
| 2008-01-13 | Rig Released |
| 2008-01-20 | Well Log Performed |
| 2008-01-21 | Finished Drilling |
| 2008-01-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2008-02-21 | Well Began Production |
| 2008-02-21 | Well Fluid changed to Crude Oil |
| 2008-02-21 | Well Mode changed to Flowing |
| 2008-04-12 | Well Fluid changed to Crude Oil |
| 2008-04-12 | Well Mode changed to Pumping |
| 2016-10-14 | Well Fluid changed to Crude Oil |
| 2016-10-14 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-01-21 | Open Hole/Barefoot Completion | 1446.00 | 1533.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 5781 | 0.0 | 0.0 | 0.0 |
| 2009 | 7752 | 0.0 | 0.0 | 0.0 |
| 2010 | 5871 | 0.0 | 0.0 | 0.0 |
| 2011 | 5517 | 0.0 | 0.0 | 0.0 |
| 2012 | 8413 | 0.0 | 0.0 | 0.0 |
| 2013 | 7801 | 0.0 | 0.0 | 0.0 |
| 2014 | 6624 | 0.0 | 0.0 | 0.0 |
For data sources see[5]