X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156052703002

Well Details

Well ID: 1156052703002
Loading map...
Location: 00/03-27-115-05W6/2
Location Alias: 00/03-27-15-05 W6M
Location Alias 2: 00/03-27-115-05 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 27
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 3-27-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0105319
License Date: 1984-01-17
License Status: Abandoned
Spud Date: 1984-02-06
Final Drill Date: 1984-02-27
Well Total Depth: 1515.00 m
Surface Hole Latitude: 59.010357
Surface Hole Longitude: -118.755091

For data sources see[1][2]

Well History

Date Event
1984-01-17 Obtained License
1984-02-06 Lost Circulation Occurred
1984-02-17 Lost Circulation Occurred
1984-02-20 Well Log Performed
1984-02-21 Lost Circulation Occurred
1984-02-25 Drill Stem Test Performed
1984-02-25 Well Log Performed
1984-02-27 Finished Drilling
1984-02-27 Well Log Performed
1984-02-27 Well Mode changed to Drilled and Cased
1984-02-28 Liner Casing Operation Performed
1984-03-03 Perforation Treatment Performed - Jet Perforation
1984-03-03 Well Log Performed
1984-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-24 Perforation Treatment Performed - Cement Squeeze
1987-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-26 Perforation Treatment Performed - Jet Perforation
1990-02-15 Perforation Treatment Performed - Jet Perforation
1990-02-15 Well Log Performed
1990-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-19 Perforation Treatment Performed - Jet Perforation
1990-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-21 Perforation Treatment Performed - Cement Squeeze
1990-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-27 Perforation Treatment Performed - Jet Perforation
1990-02-27 Well Log Performed
1996-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-08 Plug Back Performed
1996-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-09 Perforation Treatment Performed - Jet Perforation
1996-03-01 Well Began Production
1996-03-01 Well Fluid changed to Gas
1996-03-01 Well Mode changed to Flowing
2010-01-22 Perforation Treatment Performed - Cement Squeeze
2010-01-23 Perforation Treatment Performed - Cement Squeeze
2010-01-30 Perforation Treatment Performed - Cement Plug
2010-01-30 Plug Back Performed
2010-01-30 Well Fluid changed to Gas
2010-01-30 Well Log Performed
2010-01-30 Well Mode changed to Abandoned Zone
2010-01-31 Well Log Performed
2010-02-01 Well Log Performed
2010-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-02 Perforation Treatment Performed - Jet Perforation
2010-02-02 Well Log Performed
2010-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-04 Well Log Performed
2010-02-05 Perforation Treatment Performed - Jet Perforation
2010-02-05 Perforation Treatment Performed - Remedial Casing
2010-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-06 Well Log Performed
2010-02-07 Perforation Treatment Performed - Jet Perforation
2010-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-08 Perforation Treatment Performed - Remedial Casing
2010-02-18 Well Abandoned
2010-02-18 Well Fluid changed to Gas
2010-02-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-03 Perforation 1465.00 1471.00 13
1990-02-21 Cement Squeeze 1465.00 1473.20 0
1990-02-27 Perforation 1465.00 1469.00 14
1990-02-27 Acid Treatment 1465.00 1469.00 0
1996-02-08 Packing Device Capped w/Cement 1453.00 1461.00 0
1996-02-09 Perforation 1297.00 1301.00 13
1996-02-09 Perforation 1287.00 1292.00 13
1996-02-09 Perforation 1248.00 1253.00 13
1996-02-09 Acid Treatment 1248.00 1301.00 0
2010-01-22 Cement Squeeze 1287.00 1301.00 0
2010-01-23 Cement Squeeze 1248.00 1253.00 0
1984-03-04 Acid Treatment 1465.00 1471.00 0
2010-01-30 Cement Plug 1200.10 1395.40 0
2010-02-02 Perforation 762.00 763.00 20
2010-02-02 Perforation 1180.00 1181.00 20
2010-02-02 Packing Device Capped w/Cement 1170.00 1178.00 0
2010-02-03 Packing Device Capped w/Cement 752.00 760.00 0
2010-02-03 Perforation 281.00 282.00 20
2010-02-03 Perforation 630.00 631.00 40
2010-02-03 Packing Device Capped w/Cement 620.00 628.00 0
2010-02-04 Acid Treatment 281.00 282.00 0
2010-02-05 Remedial Casing Cementing 281.00 282.00 0
1987-03-24 Cement Squeeze 1465.00 1471.00 0
2010-02-05 Perforation 261.00 262.00 20
2010-02-06 Acid Treatment 261.00 262.00 0
2010-02-07 Perforation 202.00 203.00 20
2010-02-08 Packing Device Capped w/Cement 192.00 200.00 0
2010-02-08 Packing Device Capped w/Cement 250.00 258.00 0
2010-02-08 Remedial Casing Cementing 202.00 203.00 0
1987-03-26 Perforation 1465.00 1469.50 7
1987-03-26 Acid Treatment 1465.00 1469.50 0
1990-02-15 Perforation 1476.50 1480.50 14
1990-02-17 Acid Treatment 1476.50 1480.50 0
1990-02-19 Perforation 1471.20 1473.20 14
1990-02-20 Acid Treatment 1471.20 1473.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 6361 0.0 0.0 0.0
1997 5639 0.0 0.0 0.0
1998 2684 0.0 0.0 0.0
1999 7725 0.0 0.0 0.0
2000 7219 0.0 0.0 0.0
2001 2098 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-02-06 Lost Circulation 56.00 81.00
1984-02-17 Lost Circulation 1326.00 1333.00
1984-02-21 Lost Circulation 1437.00 1437.00

For data sources see[6]

References