Well Details

Well ID: 1156053001000
Loading map...
Location: 00/01-30-115-05W6/0
Location Alias: 00/01-30-15-05 W6M
Location Alias 2: 00/01-30-115-05 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 05
Section: 30
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 1-30-115-5
Operator Name: Paramount Resources Ltd.
License Number: 0033934
License Date: 1968-03-28
License Status: Abandoned
Spud Date: 1968-03-31
Final Drill Date: 1968-04-17
Well Total Depth: 1534.10 m
Surface Hole Latitude: 59.010922
Surface Hole Longitude: -118.832695

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-28 Obtained License
1968-04-07 Drill Stem Test Performed
1968-04-13 Production Casing Operation Performed
1968-04-16 Drill Stem Test Performed
1968-04-17 Finished Drilling
1968-04-17 Well Mode changed to Drilled and Cased
1968-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-30 Perforation Treatment Performed - Jet Perforation
1968-04-30 Well Began Production
1968-04-30 Well Fluid changed to Crude Oil
1968-04-30 Well Mode changed to Flowing
1969-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-25 Well Fluid changed to Crude Oil
1969-03-25 Well Mode changed to Pumping
1972-05-31 Perforation Treatment Performed - Jet Perforation
1972-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-16 Perforation Treatment Performed - Cement Squeeze
1972-06-18 Perforation Treatment Performed - Jet Perforation
1972-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-14 Perforation Treatment Performed - Cement Squeeze
1974-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-20 Perforation Treatment Performed - Jet Perforation
1977-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-10-15 Perforation Treatment Performed - Jet Perforation
1977-10-15 Well Fluid changed to Crude Oil
1977-10-15 Well Mode changed to Abandoned Zone
1977-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-23 Well Log Performed
1989-03-25 Perforation Treatment Performed - Cement Squeeze
1989-03-25 Plug Back Performed
1989-03-25 Well Log Performed
1989-04-03 Perforation Treatment Performed - Jet Perforation
1989-04-03 Well Log Performed
1989-04-06 Perforation Treatment Performed - Remedial Casing
1989-04-08 Perforation Treatment Performed - Jet Perforation
1989-04-10 Perforation Treatment Performed - Open-Hole Completion
1989-04-11 Well Log Performed
1989-04-12 Perforation Treatment Performed - Jet Perforation
1989-04-20 Perforation Treatment Performed - Remedial Casing
1989-07-01 Well Began Injection
1989-07-01 Well Fluid changed to Water
1989-07-01 Well Type changed to Injection
1992-12-01 Well Fluid changed to Crude Oil
1992-12-01 Well Mode changed to Flowing
1993-01-20 Perforation Treatment Performed - Cement Squeeze
1994-06-09 Perforation Treatment Performed - Jet Perforation
1994-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-01 Well Fluid changed to Water
1994-07-01 Well Type changed to Injection
1998-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-25 Perforation Treatment Performed - Jet Perforation
1998-03-25 Plug Back Performed
1998-03-25 Well Fluid changed to Water
1998-03-25 Well Log Performed
1998-03-25 Well Mode changed to Abandoned Zone
1998-03-25 Well Type changed to Injection
1998-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-11 Perforation Treatment Performed - Cement Squeeze
2002-02-11 Plug Back Performed
2002-02-11 Well Log Performed
2002-02-19 Perforation Treatment Performed - Jet Perforation
2002-02-20 Well Log Performed
2002-02-21 Perforation Treatment Performed - Cement Squeeze
2002-02-24 Perforation Treatment Performed - Jet Perforation
2002-02-24 Well Log Performed
2002-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-22 Well Fluid changed to Crude Oil
2002-03-22 Well Mode changed to Pumping
2004-08-01 Well Fluid changed to Crude Oil
2004-08-01 Well Mode changed to Suspended
2013-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-10 Perforation Treatment Performed - Jet Perforation
2013-10-10 Plug Back Performed
2013-10-10 Well Fluid changed to Crude Oil
2013-10-10 Well Log Performed
2013-10-10 Well Mode changed to Abandoned Zone
2013-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-11 Perforation Treatment Performed - Jet Perforation
2013-10-11 Well Log Performed
2013-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-12 Perforation Treatment Performed - Jet Perforation
2013-10-12 Well Log Performed
2013-11-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-04-30 Perforation 1471.00 1474.00 7
1974-08-20 Perforation 1482.20 1485.30 7
1974-08-20 Acid Treatment 1482.20 1485.30 0
1977-10-15 Packing Device Capped w/Cement 1455.40 1455.40 0
1977-10-15 Perforation 1357.60 1360.60 7
1977-10-16 Acid Treatment 1357.60 1360.60 0
1989-03-25 Cement Squeeze 1357.60 1360.60 0
1989-04-03 Perforation 308.80 309.00 13
1989-04-06 Remedial Casing Cementing 308.80 309.00 0
1989-04-08 Perforation 1471.00 1474.00 7
1989-04-08 Perforation 1482.20 1485.30 7
1968-04-30 Acid Treatment 1471.00 1474.00 0
1989-04-10 Open Hole/Barefoot Completion 1501.70 1534.10 0
1989-04-12 Perforation 225.00 225.30 13
1989-04-20 Remedial Casing Cementing 225.00 225.30 0
1993-01-20 Cement Squeeze 1482.20 1485.30 0
1994-06-09 Perforation 1460.00 1460.30 13
1994-06-09 Perforation 1462.50 1466.70 13
1994-06-11 Acid Treatment 1460.00 1474.00 0
1998-03-25 Packing Device Capped w/Cement 1437.00 1445.00 0
1998-03-25 Perforation 1268.00 1271.00 13
1998-03-26 Acid Treatment 1268.00 1271.00 0
1969-01-08 Acid Treatment 1471.00 1474.00 0
2002-02-11 Cement Squeeze 1268.00 1271.00 0
2002-02-19 Perforation 1460.00 1460.30 13
2002-02-19 Perforation 1462.40 1466.70 13
2002-02-21 Cement Squeeze 1460.00 1466.70 0
2002-02-24 Perforation 1459.40 1463.40 13
2002-02-24 Perforation 1463.40 1467.60 13
2002-02-25 Acid Treatment 1459.40 1467.60 0
2013-10-10 Packing Device Capped w/Cement 1445.00 1453.00 0
2013-10-10 Perforation 1383.50 1384.50 17
2013-10-11 Perforation 1383.50 1384.50 99
1972-05-31 Perforation 1357.60 1360.60 3
2013-10-11 Packing Device Capped w/Cement 1370.00 1378.00 0
2013-10-12 Perforation 1340.50 1341.50 99
2013-10-12 Packing Device Capped w/Cement 1329.00 1337.00 0
2013-10-12 Packing Device Capped w/Cement 1347.00 1355.00 0
2013-10-12 Packing Device Capped w/Cement 1257.00 1265.00 0
1972-06-01 Acid Treatment 1357.60 1360.60 0
1972-06-16 Cement Squeeze 1357.60 1360.60 0
1972-06-18 Perforation 1268.00 1271.00 7
1972-06-19 Acid Treatment 1268.00 1271.00 0
1972-07-14 Cement Squeeze 1268.00 1271.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1944 0.0 0.0 0.0
1969 5500 0.0 0.0 0.0
1970 3204 0.0 0.0 0.0
1971 5334 0.0 0.0 0.0
1972 3435 0.0 0.0 0.0
1973 8264 0.0 0.0 0.0
1974 7480 0.0 0.0 0.0
1975 7936 0.0 0.0 0.0
1976 7143 0.0 0.0 0.0
1977 4910 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 336 0.0 0.0 0.0
1993 379 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
2002 5173 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-23 No Incident Encountered 0.00 0.00

For data sources see[6]