X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156060208003

Well Details

Well ID: 1156060208003
Loading map...
Location: 00/08-02-115-06W6/3
Location Alias: 00/08-02-15-06 W6M
Location Alias 2: 00/08-02-115-06 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 02
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 8-2-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0035896
License Date: 1969-02-26
License Status: Suspension
Spud Date: 1969-03-30
Final Drill Date: 1969-04-17
Well Total Depth: 1560.00 m
Surface Hole Latitude: 58.955067
Surface Hole Longitude: -118.887799

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-26 Obtained License
1969-03-30 Direction Drilling Operation Performed - 98
1969-04-11 Drill Stem Test Performed
1969-04-16 Drill Stem Test Performed
1969-04-17 Drill Stem Test Performed
1969-04-17 Finished Drilling
1969-04-17 Well Mode changed to Drilled and Cased
1969-04-19 Liner Casing Operation Performed
1969-06-13 Perforation Treatment Performed - Jet Perforation
1969-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-11-21 Perforation Treatment Performed - Cement Squeeze
1971-11-21 Perforation Treatment Performed - Open-Hole Completion
1989-02-21 Well Log Performed
1989-02-22 Perforation Treatment Performed - Jet Perforation
1989-02-22 Well Log Performed
1989-02-24 Perforation Treatment Performed - Jet Perforation
2001-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-07 Plug Back Performed
2001-08-07 Well Log Performed
2001-08-09 Perforation Treatment Performed - Jet Perforation
2001-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-11 Well Log Performed
2001-08-24 Well Log Performed
2001-10-13 Well Began Production
2001-10-13 Well Fluid changed to Gas
2001-10-13 Well Mode changed to Flowing
2004-12-01 Well Fluid changed to Gas
2004-12-01 Well Mode changed to Pumping
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1969-03-30 609.30 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-06-13 Perforation 1522.80 1527.00 13
1969-06-16 Acid Treatment 1522.80 1527.00 0
1971-11-21 Cement Squeeze 1522.80 1527.00 0
1971-11-21 Open Hole/Barefoot Completion 1547.20 1560.00 0
1989-02-22 Perforation 1505.00 1513.00 13
1989-02-24 Perforation 1505.00 1513.00 13
2001-08-07 Packing Device Capped w/Cement 1492.00 1500.00 0
2001-08-09 Perforation 1295.40 1300.80 13
2001-08-10 Acid Treatment 1295.40 1300.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1862 0.0 0.0 0.0
2002 8588 0.0 0.0 0.0
2003 4222 0.0 0.0 0.0
2004 6599 0.0 0.0 0.0
2005 6854 0.0 0.0 0.0
2006 1080 0.0 0.0 0.0

For data sources see[6]

References