X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156060509000

Well Details

Well ID: 1156060509000
Loading map...
Location: 00/09-05-115-06W6/0
Location Alias: 00/09-05-15-06 W6M
Location Alias 2: 00/09-05-115-06 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 05
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 9-5-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0094449
License Date: 1982-01-13
License Status: Re-Entered
Spud Date: 1982-01-22
Final Drill Date: 1982-02-12
Well Total Depth: 1715.00 m
Surface Hole Latitude: 58.959234
Surface Hole Longitude: -118.970483

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-13 Obtained License
1982-02-10 Lost Circulation Occurred
1982-02-12 Finished Drilling
1982-02-12 Well Mode changed to Drilled and Cased
1982-02-14 Liner Casing Operation Performed
1982-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-24 Perforation Treatment Performed - Jet Perforation
1982-02-27 Perforation Treatment Performed - Jet Perforation
1982-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-10 Well Began Production
1982-03-10 Well Fluid changed to Crude Oil
1982-03-10 Well Mode changed to Flowing
1983-01-20 Well Log Performed
1983-08-28 Perforation Treatment Performed - Cement Squeeze
1983-08-28 Perforation Treatment Performed - Jet Perforation
1983-08-29 Perforation Treatment Performed - Jet Perforation
1984-01-13 Perforation Treatment Performed - Cement Squeeze
1984-01-20 Perforation Treatment Performed - Jet Perforation
1987-02-10 Well Fluid changed to Crude Oil
1987-02-10 Well Mode changed to Suspended
1990-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-11 Plug Back Performed
1990-06-11 Well Fluid changed to Crude Oil
1990-06-11 Well Log Performed
1990-06-11 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-24 Perforation 1563.00 1564.30 7
1984-01-20 Perforation 1549.50 1551.50 7
1990-06-11 Packing Device Capped w/Cement 1534.00 1542.00 0
1982-02-24 Acid Treatment 1563.00 1564.30 0
1982-02-27 Perforation 1549.00 1556.00 7
1982-02-28 Acid Treatment 1549.00 1556.00 0
1983-08-28 Perforation 1559.40 1560.40 7
1983-08-28 Cement Squeeze 1551.80 1556.00 0
1983-08-29 Perforation 1544.50 1548.00 7
1983-08-29 Perforation 1548.90 1550.90 7
1984-01-13 Cement Squeeze 1544.50 1550.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3404 0.0 0.0 0.0
1983 5838 0.0 0.0 0.0
1984 5937 0.0 0.0 0.0
1985 6488 0.0 0.0 0.0
1986 8051 0.0 0.0 0.0
1987 72 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-02-10 Lost Circulation 1584.00 1600.00

For data sources see[6]

References