X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156061602003

Well Details

Well ID: 1156061602003
Loading map...
Location: 00/02-16-115-06W6/3
Location Alias: 00/02-16-15-06 W6M
Location Alias 2: 00/02-16-115-06 W6/03
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 16
County/Municipality: Mackenzie County
Well Name: ACL VIRGO 2-16-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0035533
License Date: 1968-12-30
License Status: Abandoned
Spud Date: 1969-01-17
Final Drill Date: 1969-02-22
Well Total Depth: 1607.80 m
Surface Hole Latitude: 58.982809
Surface Hole Longitude: -118.951930

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-30 Obtained License
1969-02-08 Drill Stem Test Performed
1969-02-09 Drill Stem Test Performed
1969-02-11 Drill Stem Test Performed
1969-02-12 Drill Stem Test Performed
1969-02-14 Drill Stem Test Performed
1969-02-15 Blowout Occurred
1969-02-15 Drill Stem Test Performed
1969-02-22 Finished Drilling
1969-02-22 Well Mode changed to Drilled and Cased
1969-02-23 Well Log Performed
1969-02-24 Liner Casing Operation Performed
1969-03-02 Perforation Treatment Performed - Jet Perforation
1969-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-26 Perforation Treatment Performed - Cement Squeeze
1975-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-29 Perforation Treatment Performed - Jet Perforation
1976-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-11-03 Perforation Treatment Performed - Jet Perforation
1977-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-12-17 Perforation Treatment Performed - Jet Perforation
1977-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-03 Perforation Treatment Performed - Fractured
1978-10-01 Well Began Production
1978-10-01 Well Fluid changed to Gas
1978-10-01 Well Mode changed to Flowing
1985-10-01 Well Fluid changed to Gas
1985-10-01 Well Mode changed to Suspended
1995-11-28 Perforation Treatment Performed - Cement Squeeze
1995-11-28 Plug Back Performed
1995-12-05 Perforation Treatment Performed - Jet Perforation
1995-12-07 Perforation Treatment Performed - Cement Squeeze
1995-12-07 Plug Back Performed
1995-12-14 Perforation Treatment Performed - Jet Perforation
1995-12-15 Perforation Treatment Performed - Cement Squeeze
1995-12-16 Perforation Treatment Performed - Jet Perforation
1995-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-27 Well Fluid changed to Gas
1995-12-27 Well Mode changed to Suspended
1995-12-28 Well Fluid changed to Gas
1995-12-28 Well Mode changed to Abandoned Zone
1996-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-05 Plug Back Performed
1996-12-06 Perforation Treatment Performed - Cement Squeeze
1996-12-06 Perforation Treatment Performed - Jet Perforation
1996-12-06 Well Log Performed
1996-12-07 Perforation Treatment Performed - Jet Perforation
1996-12-07 Perforation Treatment Performed - Remedial Casing
1996-12-18 Well Log Performed
1997-01-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-02 Perforation 1548.40 1554.50 7
1977-12-17 Perforation 1311.60 1317.00 7
1977-12-19 Acid Treatment 1311.60 1317.00 0
1977-12-20 Acid Treatment 1311.60 1317.00 0
1978-01-03 Fracture 1311.60 1317.00 0
1995-11-28 Cement Squeeze 1311.60 1317.00 0
1995-12-05 Perforation 1389.30 1392.90 7
1995-12-07 Cement Squeeze 1389.30 1392.90 0
1995-12-14 Perforation 1535.00 1536.20 7
1995-12-15 Cement Squeeze 1535.00 1536.20 0
1995-12-16 Perforation 1528.90 1530.70 13
1969-03-03 Acid Treatment 1548.40 1554.50 0
1995-12-17 Acid Treatment 1528.90 1530.70 0
1996-12-05 Packing Device Capped w/Cement 1436.00 1440.00 0
1996-12-06 Perforation 1389.30 1393.00 18
1996-12-06 Cement Squeeze 1389.30 1393.00 0
1996-12-07 Perforation 351.50 352.50 14
1996-12-07 Remedial Casing Cementing 351.50 352.50 0
1975-09-26 Cement Squeeze 1548.40 1554.50 0
1975-09-29 Perforation 1535.00 1536.20 7
1975-09-29 Acid Treatment 1535.00 1536.20 0
1976-11-01 Packing Device Capped w/Cement 1450.80 1455.40 0
1976-11-03 Perforation 1389.30 1390.50 7
1976-11-03 Perforation 1391.10 1392.90 7
1977-12-15 Packing Device Capped w/Cement 1364.00 1379.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1896 0.0 0.0 0.0
1979 7872 0.0 0.0 0.0
1980 7340 0.0 0.0 0.0
1981 7673 0.0 0.0 0.0
1982 7616 0.0 0.0 0.0
1983 8485 0.0 0.0 0.0
1984 8313 0.0 0.0 0.0
1985 1408 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1969-02-15 Blowout 1576.30 1591.00

For data sources see[6]

References