X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156061812000

Well Details

Well ID: 1156061812000
Loading map...
Location: 00/12-18-115-06W6/0
Location Alias: 00/12-18-15-06 W6M
Location Alias 2: 00/12-18-115-06 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 18
County/Municipality: Mackenzie County
Well Name: ACL HZ VIRGO 11-18-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0035586
License Date: 1969-01-08
License Status: Abandoned
Spud Date: 1969-01-14
Final Drill Date: 1969-02-04
Well Total Depth: 1572.20 m
Surface Hole Latitude: 58.989007
Surface Hole Longitude: -119.020838

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-08 Obtained License
1969-01-25 Drill Stem Test Performed
1969-01-29 Intermediate Casing Operation Performed
1969-02-02 Drill Stem Test Performed
1969-02-04 Finished Drilling
1969-02-05 Drill Stem Test Performed
1969-02-06 Well Log Performed
1969-02-11 Perforation Treatment Performed - Bullet Perforation
1969-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-14 Perforation Treatment Performed - Bullet Perforation
1969-02-14 Perforation Treatment Performed - Cement Squeeze
1969-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-24 Perforation Treatment Performed - Cement Squeeze
1969-03-01 Perforation Treatment Performed - Bullet Perforation
1969-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-07 Perforation Treatment Performed - Cement Squeeze
1969-03-12 Perforation Treatment Performed - Jet Perforation
1969-03-26 Well Mode changed to Drilled and Cased
1997-04-06 Well Log Performed
1997-11-01 Well Began Production
1997-11-01 Well Fluid changed to Gas
1997-11-01 Well Mode changed to Flowing
2002-03-01 Well Fluid changed to Gas
2002-03-01 Well Mode changed to Pumping
2009-01-24 Well Log Performed
2009-01-25 Well Log Performed
2009-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-26 Plug Back Performed
2009-01-26 Well Fluid changed to Gas
2009-01-26 Well Mode changed to Abandoned Zone
2009-02-10 Well Abandoned
2009-02-10 Well Fluid changed to Gas
2009-02-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-11 Bullet Perforation 1409.70 1412.70 7
1969-03-12 Perforation 1530.00 1534.30 13
1969-03-12 Perforation 1536.10 1539.20 13
2009-01-26 Packing Device Capped w/Cement 1477.00 1485.00 0
1969-02-12 Acid Treatment 1409.70 1412.70 0
1969-02-14 Cement Squeeze 1409.70 1412.70 0
1969-02-14 Bullet Perforation 1399.60 1403.60 16
1969-02-15 Acid Treatment 1399.60 1403.60 0
1969-02-24 Cement Squeeze 1399.60 1403.60 0
1969-03-01 Bullet Perforation 1405.10 1408.20 13
1969-03-02 Acid Treatment 1405.10 1408.20 0
1969-03-07 Cement Squeeze 1405.10 1408.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 490 0.0 0.0 0.0
1998 1715 0.0 0.0 0.0
1999 1496 0.0 0.0 0.0
2001 1580 0.0 0.0 0.0
2002 2340 0.0 0.0 0.0
2003 4157 0.0 0.0 0.0
2004 4249 0.0 0.0 0.0
2005 2552 0.0 0.0 0.0
2006 593 0.0 0.0 0.0
2007 530 0.0 0.0 0.0

For data sources see[5]

References