X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156062104000

Well Details

Well ID: 1156062104000
Loading map...
Location: 00/04-21-115-06W6/0
Location Alias: 00/04-21-15-06 W6M
Location Alias 2: 00/04-21-115-06 W6/00
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 06
Section: 21
County/Municipality: Mackenzie County
Well Name: ACL SWD VIRGO 4-21-115-6
Operator Name: Paramount Resources Ltd.
License Number: 0037668
License Date: 1970-01-26
License Status: Abandoned
Spud Date: 1970-02-21
Final Drill Date: 1970-03-16
Well Total Depth: 1609.30 m
Surface Hole Latitude: 58.995200
Surface Hole Longitude: -118.966945

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-26 Obtained License
1970-03-07 Drill Stem Test Performed
1970-03-09 Well Log Performed
1970-03-14 Drill Stem Test Performed
1970-03-16 Finished Drilling
1970-03-16 Well Mode changed to Drilled and Cased
1970-03-17 Drill Stem Test Performed
1970-03-18 Liner Casing Operation Performed
1970-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-13 Perforation Treatment Performed - Jet Perforation
1970-06-13 Well Began Production
1970-06-13 Well Fluid changed to Crude Oil
1970-06-13 Well Mode changed to Flowing
1972-05-27 Perforation Treatment Performed - Cement Squeeze
1972-05-28 Perforation Treatment Performed - Jet Perforation
1972-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-03 Well Fluid changed to Crude Oil
1972-06-03 Well Mode changed to Pumping
1972-08-30 Perforation Treatment Performed - Cement Squeeze
1972-09-02 Perforation Treatment Performed - Open-Hole Completion
1972-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-01 Well Began Injection
1972-10-01 Well Fluid changed to Water
1972-10-01 Well Type changed to Disposal
1973-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-07-27 Perforation Treatment Performed - Alcohol Squeeze
1976-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-17 Perforation Treatment Performed - Jet Perforation
1995-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-01 Well Fluid changed to Water
1996-06-01 Well Mode changed to Suspended
1996-06-01 Well Type changed to Disposal
1997-01-06 Well Fluid changed to Crude Oil
1997-01-06 Well Mode changed to Pumping
1998-05-27 Well Fluid changed to Crude Oil
1998-05-27 Well Mode changed to Suspended
1998-11-11 Well Fluid changed to Crude Oil
1998-11-11 Well Mode changed to Flowing
2000-05-18 Perforation Treatment Performed - Jet Perforation
2000-05-18 Well Log Performed
2000-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-09-01 Well Fluid changed to Crude Oil
2001-09-01 Well Mode changed to Pumping
2008-03-08 Well Log Performed
2008-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-09 Plug Back Performed
2008-03-09 Well Fluid changed to Crude Oil
2008-03-09 Well Log Performed
2008-03-09 Well Mode changed to Abandoned Zone
2008-03-10 Perforation Treatment Performed - Jet Perforation
2008-03-10 Well Log Performed
2008-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-11 Perforation Treatment Performed - Remedial Casing
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Well Log Performed
2008-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-13 Perforation Treatment Performed - Remedial Casing
2008-03-24 Well Abandoned
2008-03-24 Well Fluid changed to Crude Oil
2008-03-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-06-13 Perforation 1562.10 1563.60 7
1973-07-27 Acid Treatment 1586.50 1609.30 0
1976-08-14 Acid Treatment 1586.50 1609.30 0
1995-10-17 Perforation 1538.00 1540.00 13
1995-10-18 Acid Treatment 1538.00 1540.00 0
2000-05-18 Perforation 1510.60 1514.60 13
2000-05-19 Acid Treatment 1510.60 1514.60 0
2008-03-09 Packing Device Capped w/Cement 1414.00 1500.00 0
2008-03-10 Perforation 710.00 711.00 13
2008-03-11 Remedial Casing Cementing 710.00 711.00 0
2008-03-11 Packing Device Capped w/Cement 696.00 708.00 0
1970-06-13 Acid Treatment 1562.10 1563.60 0
2008-03-12 Perforation 284.00 285.00 13
2008-03-13 Remedial Casing Cementing 284.00 285.00 0
2008-03-13 Packing Device Capped w/Cement 269.00 281.00 0
1972-05-27 Cement Squeeze 1562.10 1563.60 0
1972-05-28 Perforation 1556.90 1558.40 13
1972-05-29 Acid Treatment 1556.90 1558.40 0
1972-08-30 Cement Squeeze 1556.90 1558.40 0
1972-09-02 Open Hole/Barefoot Completion 1586.50 1609.30 0
1972-09-27 Acid Treatment 1586.50 1609.30 0
1973-07-27 Alchohol Squeeze 1586.50 1609.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 2911 0.0 0.0 0.0
1971 5710 0.0 0.0 0.0
1972 1209 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1997 3131 0.0 0.0 0.0
1998 1921 0.0 0.0 0.0
1999 5831 0.0 0.0 0.0
2000 2085 0.0 0.0 0.0
2001 2033 0.0 0.0 0.0
2002 4666 0.0 0.0 0.0
2003 8619 0.0 0.0 0.0
2004 552 0.0 0.0 0.0

For data sources see[5]

References