X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1156071002002

Well Details

Well ID: 1156071002002
Loading map...
Location: 00/02-10-115-07W6/2
Location Alias: 00/02-10-15-07 W6M
Location Alias 2: 00/02-10-115-07 W6/02
Country: Canada
Province: Alberta
Township: 115
Meridian: 6
Range: 07
Section: 10
County/Municipality: Mackenzie County
Well Name: ACL AMBER 2-10-115-7
Operator Name: Paramount Resources Ltd.
License Number: 0121303
License Date: 1986-01-10
License Status: Abandoned
Spud Date: 1986-01-13
Final Drill Date: 1986-01-30
Well Total Depth: 1630.00 m
Surface Hole Latitude: 58.966513
Surface Hole Longitude: -119.090052

For data sources see[1][2]

Well History

Date Event
1986-01-10 Obtained License
1986-01-13 Well Log Performed
1986-01-16 Surface Casing Operation Performed
1986-01-25 Well Log Performed
1986-01-26 Lost Circulation Occurred
1986-01-26 Production Casing Operation Performed
1986-01-27 Well Log Performed
1986-01-29 Lost Circulation Occurred
1986-01-30 Finished Drilling
1986-01-30 Perforation Treatment Performed - Open-Hole Completion
1986-01-30 Well Mode changed to Drilled and Cased
1986-01-31 Well Log Performed
1986-02-01 Rig Released
1986-02-25 Liner Casing Operation Performed
1986-02-25 Perforation Treatment Performed - Cement Squeeze
1986-03-03 Perforation Treatment Performed - Jet Perforation
1986-03-03 Well Log Performed
1986-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-07 Perforation Treatment Performed - Cement Squeeze
1986-03-10 Perforation Treatment Performed - Jet Perforation
1986-03-10 Well Log Performed
1986-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-13 Perforation Treatment Performed - Jet Perforation
1997-12-18 Perforation Treatment Performed - Jet Perforation
1997-12-18 Well Log Performed
1997-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-16 Well Log Performed
2004-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-17 Plug Back Performed
2004-04-18 Perforation Treatment Performed - Jet Perforation
2004-04-20 Perforation Treatment Performed - Jet Perforation
2004-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-25 Well Began Production
2004-04-25 Well Fluid changed to Gas
2004-04-25 Well Mode changed to Pumping
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Suspended
2018-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-02 Plug Back Performed
2018-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-03 Plug Back Performed
2018-10-03 Well Fluid changed to Gas
2018-10-03 Well Mode changed to Abandoned Zone
2018-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-05 Perforation Treatment Performed - Jet Perforation
2018-10-05 Plug Back Performed
2018-10-06 Perforation Treatment Performed - Cement Plug
2018-10-06 Perforation Treatment Performed - Cement Squeeze
2018-10-06 Plug Back Performed
2018-10-07 Perforation Treatment Performed - Cement Plug
2018-10-07 Perforation Treatment Performed - Cement Squeeze
2018-10-07 Perforation Treatment Performed - Jet Perforation
2018-10-07 Plug Back Performed
2018-12-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-30 Open Hole/Barefoot Completion 1501.00 1630.00 0
1996-03-13 Perforation 1553.00 1555.00 13
1996-03-13 Acid Treatment 1553.00 1555.00 0
1997-12-18 Perforation 1542.00 1545.00 13
1997-12-18 Perforation 1534.00 1538.00 13
1997-12-19 Acid Treatment 1534.00 1545.00 0
2004-04-17 Packing Device Capped w/Cement 1522.00 1530.00 0
2004-04-18 Perforation 1428.00 1430.00 13
2004-04-20 Perforation 1349.00 1351.00 13
2004-04-22 Acid Treatment 1349.00 1351.00 0
2018-10-02 Packing Device Capped w/Cement 1439.80 1447.80 0
1986-02-25 Cement Squeeze 1501.00 1630.00 0
2018-10-03 Packing Device Capped w/Cement 1415.80 1423.80 0
2018-10-05 Packing Device Capped w/Cement 1336.80 1344.80 0
2018-10-05 Perforation 731.00 732.00 17
2018-10-06 Cement Squeeze 731.00 732.00 0
2018-10-06 Cement Plug 717.30 731.00 0
2018-10-07 Perforation 381.00 382.00 20
2018-10-07 Cement Squeeze 381.00 382.00 0
2018-10-07 Cement Plug 366.10 374.10 0
1986-03-03 Perforation 1571.00 1573.00 7
1986-03-03 Perforation 1574.00 1575.00 7
1986-03-04 Acid Treatment 1571.00 1575.00 0
1986-03-07 Cement Squeeze 1571.00 1575.00 0
1986-03-10 Perforation 1571.00 1573.00 7
1986-03-10 Perforation 1574.00 1575.00 7
1986-03-11 Acid Treatment 1571.00 1575.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1590 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-29 Lost Circulation 1598.50 1630.00
1986-01-26 Lost Circulation 1501.00 1501.00
2018-10-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References