If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1166013501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":59.112824,"lon":-118.035085,"icon":""}]} |
| Location: 00/01-35-116-01W6/0 | |
| Location Alias: 00/01-35-16-01 W6M | |
| Location Alias 2: 00/01-35-116-01 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 116 | |
| Meridian: 6 | |
| Range: 01 | |
| Section: 35 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL ET AL LARNE 1-35-116-1 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0298020 | |
| License Date: 2003-12-05 | |
| License Status: Abandoned | |
| Spud Date: 2003-12-29 | |
| Final Drill Date: 2004-01-04 | |
| Well Total Depth: 1217.00 m | |
| Surface Hole Latitude: 59.112824 | |
| Surface Hole Longitude: -118.035085 |
| Date | Event |
|---|---|
| 2003-01-05 | Well Log Performed |
| 2003-12-05 | Obtained License |
| 2003-12-31 | Surface Casing Operation Performed |
| 2004-01-04 | Finished Drilling |
| 2004-01-04 | Well Log Performed |
| 2004-01-04 | Well Mode changed to Drilled and Cased |
| 2004-01-05 | Well Log Performed |
| 2004-01-06 | Production Casing Operation Performed |
| 2004-01-06 | Rig Released |
| 2004-01-09 | Well Log Performed |
| 2004-01-11 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2004-01-14 | Well Log Performed |
| 2004-01-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-01-15 | Plug Back Performed |
| 2004-01-15 | Well Mode changed to Abandoned Zone |
| 2007-01-13 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-16 | Perforation Treatment Performed - Fractured |
| 2007-04-12 | Well Began Production |
| 2007-04-12 | Well Fluid changed to Crude Oil |
| 2007-04-12 | Well Mode changed to Pumping |
| 2009-11-30 | Well Log Performed |
| 2009-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-12-01 | Plug Back Performed |
| 2009-12-01 | Well Fluid changed to Crude Oil |
| 2009-12-01 | Well Log Performed |
| 2009-12-01 | Well Mode changed to Abandoned Zone |
| 2009-12-02 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-03 | Well Log Performed |
| 2009-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-12-04 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2009-12-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-12-06 | Perforation Treatment Performed - Remedial Casing |
| 2009-12-15 | Well Abandoned |
| 2009-12-15 | Well Fluid changed to Crude Oil |
| 2009-12-15 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-01-11 | Perforation | 1125.00 | 1128.00 | 13 |
| 2009-12-01 | Packing Device Capped w/Cement | 1115.00 | 1123.00 | 0 |
| 2009-12-02 | Perforation | 243.00 | 244.00 | 17 |
| 2009-12-04 | Perforation | 239.00 | 240.00 | 17 |
| 2009-12-04 | Packing Device Capped w/Cement | 228.00 | 236.00 | 0 |
| 2009-12-05 | Perforation | 178.00 | 179.00 | 17 |
| 2009-12-05 | Acid Treatment | 178.00 | 179.00 | 0 |
| 2009-12-06 | Remedial Casing Cementing | 178.00 | 179.00 | 0 |
| 2009-12-06 | Packing Device Capped w/Cement | 162.00 | 176.00 | 0 |
| 2004-01-11 | Perforation | 1135.50 | 1140.00 | 13 |
| 2004-01-11 | Perforation | 1141.50 | 1142.50 | 13 |
| 2004-01-12 | Acid Treatment | 1125.00 | 1142.50 | 0 |
| 2004-01-15 | Packing Device Capped w/Cement | 1112.00 | 1120.00 | 0 |
| 2007-01-13 | Perforation | 1125.00 | 1128.00 | 13 |
| 2007-01-13 | Perforation | 1135.50 | 1140.00 | 13 |
| 2007-01-13 | Perforation | 1141.50 | 1142.50 | 13 |
| 2007-01-16 | Fracture | 1125.00 | 1142.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 2492 | 0.0 | 0.0 | 0.0 |
For data sources see[5]